About this file

This statement of work outlines requirements for performing preventative maintenance inspections on antennas at three buildings on Williams Air Force Base. The contractor shall inspect coaxial cables and grounding systems at buildings 4241, 4330, and 4206, verifying cable labels and bonding ground connections. Work will be performed externally except to trace lines inside buildings. Tower inspections at buildings 4241 and 4206 require a certified climbing technician due to heights.

The related federal contract opportunity is a pre-solicitation notice from the Department of the Air Force Air Education and Training Command to perform the LMR Antenna PMI services outlined in the statement of work, under solicitation number FA3010_Antenna_Williams.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

November 3, 2023

STATEMENT OF WORK

81 CS LMR antenna PMI requirements SOW

The contractor shall complete the following for the antenna at Bldg. 4241:

• Properly inspect all coaxial cables to tower

• Inspect the RF coaxial surge protection grounding (PFAS) system and provide in writing any fix actions or discrepancies that are identified

• Inspect grounding kits on all cables and 2-hole lugs

• Inspect messenger cable support system

• Verify all cables are labeled with brass tags and/or vinyl labels on both ends

• Inspect ground bus bar, re-bond all ground lead connections with antioxidant, and inspect polyphasers for each cable

• All work is to be performed on the exterior of the building and tower with the exception of tracing/labeling lines inside the building if needed

• Tower work will require certified climbing technician.

The contractor shall complete the following for the antenna at Bldg. 4330:

• Inspect cables along rooftop and building wall

• Verify all cables are labeled with brass tags and/or vinyl labels on both ends

• Inspect grounding on all applicable cables

• Inspect ground bus bars at both entry ports and existing roof ground system

• Inspect RF warning signs ensure they are legible and properly affixed to building

• All work is to be performed on the exterior of the building with the exception of tracing/labeling lines inside the building

• All work can be performed on the roof from ladders and will not require a man-lift

November 3, 2023

The contractor shall complete the following for the antenna at Bldg. 4206:

• Properly inspect all coaxial cables for tower

• Inspect the RF coaxial surge protection grounding (PFAS) system and provide in writing any fix actions or discrepancies that are identified

• Inspect grounding on all cables and 2-hole lugs

• Inspect messenger cable support system

• Verify all cables are labeled with brass tags and/or vinyl labels on both ends

• Inspect ground bus bar, re-bond all ground lead connections with antioxidant, and inspect polyphasers for each cable

• All work is to be performed on the exterior of the building and tower with the exception of tracing/labeling lines inside the building if needed

• Tower work will require certified climbing technician.