Questions and Answers.pdf
PDF 104 KB Posted
- Attached to
- Chemistry CPRR Federal contract opportunity
- Solicitation number
- FA301022R0038
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 6 Fifth Ordering Period.pdf | ||
| Attachment 3 Second Ordering Period.pdf | ||
| Solicitation - FA301022R0038.pdf | ||
| Attachment 2 First Ordering Period.pdf | ||
| Attachment 1 Requirement Specifications.docx | DOCX document | |
| Attachment 4 Third Ordering Period.pdf | ||
| Attachment 5 Fourth Ordering Period.pdf | ||
| Attachment 7 DHA Cybersecurity-RMF Requirements (3-25-19).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. (1.13) As needed, the Contractor provides the installation and continues service support for any air compressors, and deionized water systems. Is a new water system required or is one needed just for the transition period (validation of new instrument)?
Answer: It would depend on the vendor’s requirement, does the equipment being quoted need compressors, and deionized water systems.
2. Regarding the test menu, “URINE DRUGS OF ABUSE”- Please share which tests are reporting quantitative/qualitative? Can you please provide the cutoffs being used?
Answer: The result for any analyte in this panel can be reported qualitatively as negative or positive relative to the cut-off for that test. A positive result suggests the sample has enough of the analyte present to exceed the threshold. A negative result indicates the sample does not contain any of the given analyte or that the analyte is present, but the concentration is below the test cut-off.
AMPHET/METHAMPH CUT-OFF LEVEL: 500 ng/mL
BARBITURATES CUT-OFF LEVEL: 200 ng/mL
BENZODIAZEPINES CUT-OFF LEVEL: 200 ng/mL
CANNABINOIDS CUT-OFF LEVEL: 50 ng/mL
COCAINE CUT-OFF LEVEL: 300 ng/mL
OPIATES CUT-OFF LEVEL: 300 ng/mL
PCP CUT-OFF LEVEL: 25 ng/mL
3. Regarding attachment 7/DHA Cybersecurity-RMF Requirements, how would you like us to acknowledge this form?
Answer: Please acknowledge in submitted proposal that instructions in Attachment 7 – DHA
Cybersecurity – RMF Requirements will be followed.
File details come from the government source that posted it. Updated .