Attachment 10 MAHG 191089 Renovate Blake Gym Specs 09082022.pdf

PDF 438 KB Posted

Attached to
Renovate Blake Gym
Solicitation number
FA301022R0034
Issued by

View the file

Other files

File Type Posted
Attachment 9 MAHG 191089 Renovate Blake Gym Addendum 1 .pdf PDF
Attachment 11 MAHG191089 Renovate Blake Gym QAs 20220908.pdf PDF
Solicitation Amendment FA301022R00340002 SF 30.pdf PDF
MAHG 191089 Blake Gym Sign In Sheet.pdf PDF
Attachment 6 Wage Det MS20220050 Mod 2 02252022.pdf PDF
Attachment 7 Past Performance Questionnaire 08162022.pdf PDF
Attachment 3 MAHG191089 Renovate Blake Gym Specs 04232021.pdf PDF
Solicitation Amendment FA301022R00340001 SF 30.pdf PDF
Attachment 8 Past Performance Reference List 08162022.pdf PDF
Attachment 4 MAHG191089 Renovate Blake Gym Drawings 04232021.pdf PDF
Attachment 5 MAHG191089 Renovate Blake Gym MSS 08162022.xls XLS spreadsheet
Attachment 1 MAHG191089 Renovate Blake Gym SOW 08162022.pdf PDF
Attachment 2 MAHG191089 Renovate Blake Gym Appendix 1 04232021.pdf PDF
Attachment 10 - Submittal Procedures.pdf PDF
Attachment 11 MAHG191089 Renovate Blake Gym MSS.xls XLS spreadsheet
Attachment 6 - Past Performance Questionnaire.pdf PDF
Attachment 9 - Notice of Compliance.pdf PDF
Attachment 3 MAHG191089 Renovate Blake Gym Specs.pdf PDF
Attachment 1 MAHG191089 Renovate Blake Gym SOW .pdf PDF
Attachment 8 - SF 1444.pdf PDF
Attachment 2 MAHG191089 Renovate Blake Gym Appendix 1.pdf PDF
Attachment 4 MAHG191089 Renovate Blake Gym Drawings.pdf PDF
Solicitation - FA301022R0034.pdf PDF
Attachment 7 - Past Performance Reference List.pdf PDF
Attachment 5 - Wage Det MS20220050 Mod 2.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Machado|Patano, PLLC M|P Design Group, PLLC

Thursday, September 8, 2022 REV 0 - Issued for Construction

0110.20.002 / MAHG201080 -

Repair Blake Gym 096813 - 1 TILE CARPETING

SECTION 096813

TILE CARPETING

PART1 GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including the Statement of Work (SOW).

1.02 SUMMARY

A. Section includes modular, carpet tile.

1.03 PREINSTALLATION MEETINGS

A. Pre-installation Conference:

1. Review methods and procedures related to carpet tile installation including, but not limited to, the following:

2. Review delivery, storage, and handling procedures.

3. Review ambient conditions and ventilation procedures.

4. Review subfloor preparation procedures.

5. Follow manufacturer's modular carpet installation guidelines and/or Carpet & Rug Institute

Installation Standard (the most recent version), where applicable.

1.04 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include manufacturer's written specifications and lab documents for any physical testing.

2. Include installation recommendations for each type of substrate as specified in carpet manufacturer's installation guidelines and/or Carpet & Rug Institute Installation Standard (the most recent version), where applicable.

3. Include carpet maintenance recommendations as outlined by carpet manufacturer.

4. Carpet Manufacturer shall also submit a plan for recycling the specified carpet at the end of the useful life of the carpet.

B. Samples: For each of the following products and for each color and texture required. Label each Sample with manufacturer's name, material description, color, pattern, and designation indicated on Drawings and in schedules.

1. Carpet Tile: Full-size Sample.

2. Exposed Edge, Transition, and Other Accessory Stripping: 12-inch long Samples.

C. Product Schedule: For carpet tile. Use same designations indicated on Drawings.

1.05 INFORMATIONAL SUBMITTALS

A. Qualification Data: For Installer.

B. Product Test Reports: For carpet tile, for tests performed by a qualified independent testing agency.

1.06 CLOSEOUT SUBMITTALS

A. Maintenance Data: For carpet tiles to include in maintenance manuals. Include the following:

1. Methods for maintaining carpet tile, including cleaning and stain-removal products and procedures and manufacturer's recommended maintenance schedule.

2. Precautions for cleaning materials and methods that could be detrimental to carpet tile.

1.07 MAINTENANCE MATERIAL SUBMITTALS

A. Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Carpet Tile: Full-size units equal to 5 percent of amount installed for each type indicated, but not less than 10.67 sq. yd.

1.08 QUALITY ASSURANCE

A. Contractor must comply with mandatory use Air Force Furnishings Commodity Council Tier 1 contracts manufacturers. The Carpet Program is covered under North American Industry

Thursday, September 8, 2022 REV 0 - Issued for Construction

0110.20.002 / MAHG201080 -

Repair Blake Gym 096813 - 2 TILE CARPETING

Classification System (NAICS) code 314110 - Carpet and Rug Mills. The Product Service Code (PSC) for the Carpet Program is 7220 – Floor Coverings.

1.09 DELIVERY, STORAGE, AND HANDLING

A. Comply with carpet manufacturer's installation recommendations and the Carpet & Rug

Institute Installation Standard (the most recent version), where applicable.

1.10 FIELD CONDITIONS

A. Comply with carpet manufacturer's installation recommendations and the Carpet & Rug Institute Installation Standard (the most recent version) for temperature, humidity, and ventilation limitations.

B. Environmental Limitations: Do not deliver or install carpet tiles until spaces are enclosed and weather-tight, wet work in spaces is complete and dry, and ambient temperature and humidity conditions are maintained at occupancy levels during the remainder of the construction period.

C. HVAC system should be operational and running prior to carpet installation and remain running after carpet installation.

D. Do not install carpet tiles over concrete slabs until slabs have cured and are sufficiently dry to allow bond between adhesive and concrete. Concrete slabs should have moisture and have pH readings that are within the specified tolerance of the adhesive to be used.

E. Where demountable partitions or other items are indicated for installation on top of carpet tiles, install carpet tiles before installing these items.

1.11 WARRANTY

A. Special Warranty for Carpet Tiles: Manufacturer agrees to repair or replace components of carpet tile installation that fail in materials or workmanship within specified warranty period.

1. Warranty does not include deterioration or failure of carpet tile due to unusual traffic, failure of substrate, vandalism, or abuse.

2. Failures include, but are not limited to, more than 10 percent face fiber loss, edge raveling, dimensional instability, excess static discharge, loss of tuft bind strength, delamination, and where face fiber is 100 percent solution dyed, inability to remove acid based stains, lack of colorfastness to light, and lack of colorfastness to atmospheric contaminants.

3. Carpet and fiber must be manufactured and warrantied by same manufacturer.

4. Warranty Period: Lifetime Commercial Limited Warranty.

PART 2 PRODUCTS

2.01 MANUFACTURERS:

A. Carpet Tile/plank: Shall comply with mandatory use Air Force Furnishings Commodity Council carpet ordering. Carpet shall be acquired by a small business installer, dealer, or contractor using the following mandatory manufacturers holding Tier 1 contracts:

B. Approved manufacturers:

1. Shaw, Industries, Inc.:

a. Contract #: FA8057-17-C-0002

b. Website: www.shawfloors.com (only use AF Catalog below)

c. POC: Eric Taylor and Farah Finley

d. Phone: 706-532-7567 and 770-276-7505

e. Email: airforce.customer@shawinc.com

f. Online Contact Form: https://airforce.shawinc.com/contact

g. Air Force Catalog: https://airforce.shawinc.com/

2. Engineered Floors, LLC:

a. Contract #: FA8057-17-C-0003

b. Website: www.jjflooringgroup.com (only use AF Catalog below)

c. POC: Debra Ramsey

d. Phone: 800-241-4586 x88392

e. Email: usaf@engineeredfloors.com

f. Air Force Catalog: https://jjflooringgroup.com/usaf/

Thursday, September 8, 2022 REV 0 - Issued for Construction

0110.20.002 / MAHG201080 -

Repair Blake Gym 096813 - 3 TILE CARPETING

3. Mohawk Carpet Distribution, Inc.:

a. Contract: FA8057-17-C-0004

b. Website: www.mohawkgroup.com (Only use AF Catalog below)

c. POC: AnnaLeigh Warmack Kone and Scott Lang

d. Phone: 706-879-6554 and 617-992-8164

e. Email: Contract_compliance@mohawkind.com

f. Alternate Email: Scott_d_lang@mowhawkind.com

g. Air Force Catalog: https:/airforce.mohawkgroup.com/

C. Contractor to choose one of the following: Shaw’s 59576 Disperse Ecoworx; Mohawk Group’s BT355 Riot QS Tile; J+J Flooring’s Indew; and must comply with the mandatory use Air Force Furnishings Commodity Council Tier 1 contracts.

D. Color must be chosen by owner. Confirm pattern / style and color with Contracting Officer.

Install per manufacturer recommendations and instructions. Provide attached cushion backing in compliance with NSF/ANSI 140 sustainability standards. Provide low VOC wet adhesive, moisture proof, thermoplastic hard or thermoset backing option with a maximum thickness no greater than 0.250” for modular carpet tile.

2.02 INSTALLATION ACCESSORIES

A. Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based formulation provided or recommended by carpet tile manufacturer.

B. Trowelable Adhesives: Water-resistant, mildew-resistant, nonstaining, premium grade pressure-sensitive type to suit products and subfloor conditions indicated, that complies with flammability requirements for installed carpet tile and is recommended by carpet tile manufacturer for releasable installation.

1. Adhesives shall have a VOC content of 50 g/L or less when calculated according to

40 CFR 59, Subpart D (EPA Method 24).

PART 3 EXECUTION

3.01 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for maximum moisture content, alkalinity range, installation tolerances, and other conditions affecting carpet tile performance. Examine carpet tile for type, color, pattern, and potential defects prior to installation. See manufacturer's requirements for substrate conditions and ambient conditions.

B. Concrete Subfloors: Verify that concrete slabs comply with ASTM F 710 and the following:

1. Slab substrates are dry and free of curing compounds, sealers, hardeners, and other materials that may interfere with adhesive bond. Determine adhesion and dryness characteristics by performing moisture and pH tests as recommended by carpet tile manufacturer.

2. Subfloor finishes comply with requirements specified in Section 033000 "Cast-in-Place Concrete" for slabs receiving carpet tile.

3. Subfloors are free of cracks, ridges, depressions, scale, and foreign deposits.

4. Lightweight concrete and gypcrete subfloors may require a primer such as Shaw 9050 or equivalent to reduce surface porosity.

5. Where previous surface treatments are unknown, or where other concerns exist as to the ability of the adhesive to bond to the substrate, a 24 hour bond test is recommended.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

Thursday, September 8, 2022 REV 0 - Issued for Construction

0110.20.002 / MAHG201080 -

Repair Blake Gym 096813 - 4 TILE CARPETING

3.02 PREPARATION:

A. General: Comply with Carpet & Rug Institute Installation Standard (the most recent version), "Site Conditions; Floor Preparation," and with carpet tile manufacturer's written installation instructions for preparing substrates indicated to receive carpet tile installation.

B. Use trowelable leveling and patching compounds that contain a cementitious base with a latex additive, according to manufacturer's written instructions, to fill cracks, holes, depressions, and protrusions in substrates. Fill or level cracks, holes and depressions 1/8 inch wide or wider and protrusions more than 1/32 inch unless more stringent requirements are required by manufacturer's written instructions.

C. Remove coatings, including curing compounds, and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, without using solvents. Use mechanical methods recommended in writing by carpet tile manufacturer.

D. Broom and vacuum clean substrates to be covered immediately before installing carpet tile.

3.03 INSTALLATION:

A. General: Comply with Carpet & Rug Institute Installation Standard (the most recent version), "Carpet Modules," and with carpet tile manufacturer's written installation instructions.

B. Installation Method: Glue down; install every tile with full-spread, releasable, pressure-sensitive adhesive or with a non-spreadable dry adhesive system, such as LokDots. Any non-spreadable adhesive system must adhere the carpet to the substrate.

C. Maintain dye lot integrity. Do not mix dye lots in same area unless the specific carpet tile style is manufactured as a merge-able dye lot product.

D. Cut and fit carpet tile to butt tightly to vertical surfaces, permanent fixtures, and built-in furniture including cabinets, pipes, outlets, edgings, thresholds, and nosings. Bind or seal cut edges as recommended by carpet tile manufacturer.

E. Extend carpet tile into toe spaces, door reveals, closets, open-bottomed obstructions, removable flanges, alcoves, and similar openings.

F. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on finish flooring as marked on subfloor. Use nonpermanent, non-staining marking device.

G. Install pattern parallel to walls and borders.

H. Roll the entire installation with a 75 lb roller once installation is completed.

3.04 CLEANING AND PROTECTION

3.05 PERFORM THE FOLLOWING OPERATIONS IMMEDIATELY AFTER INSTALLING CARPET

TILE:

1. Remove excess adhesive, and other surface blemishes using cleaner recommended by carpet tile manufacturer.

2. Remove yarns that protrude from carpet tile surface.

3. Vacuum carpet tile using commercial machine with face-beater element.

B. Protect installed carpet tile to comply with Carpet & Rug Institute Installation Standard (the most recent version), "Protecting Indoor Installations."

C. When construction or move-in activities will continue where new carpet is installed, provide non-staining building material paper to protect carpet. Do not use plastic sheeting as it can trap moisture, and self-sticking plastic sheeting can transfer adhesive residue to carpet that will attract soil.

D. When heavy objects are moved over carpet within 24 hours of installation, use plywood over carpet to prevent buckling and wrinkling.

Thursday, September 8, 2022 REV 0 - Issued for Construction

0110.20.002 / MAHG201080 -

Repair Blake Gym 096813 - 5 TILE CARPETING

E. Protect carpet tile against damage from construction operations and placement of equipment and fixtures during the remainder of construction period. Use protection methods indicated or recommended in writing by carpet tile manufacturer.

END OF SECTION

150BN BluNose High Impact Corner Guard

IPC.380/REV.9A

SELF-TAPPING

SCREWS

VINYL COVER

.080" 2mm

3" 76mm

CONTINUOUS

VINYL RETAINER

.070" 1.8mm

CO-EXTRUDED

FLEXIBLE VINYL

BUMPER

3" wing (76mm) with 90˚ corner protection

Mounted on a .070" (1.8mm) thick continuous vinyl retainer with a co-extruded Biopolymer Flex PVC apex

Vinyl retainer is nearly four times stronger than our aluminum retainer and six times stronger than any other vinyl retainer

.080" (2mm) thick scratch and stain resistant rigid vinyl cover

Manufactured in 4' (1.22m), 8' (2.44m), 9' (2.74m) and 12' (3.66m) standard heights, custom heights available

Available in 100 standard colors and Woodland patterns

Quick Ship applies to 4' (1.22m) and 8' (2.44m) heights and select colors only

Meets the most rigorous standards and criteria of chemical emissions as prescribed by the GREENGUARD Environmental Institute

Has been tested and meets GREENGUARD Environmen-tal Institute's and the state of California's requirements for low emitting products as tested by Air Quality Sci-ences

Has been tested and meets the GREENGUARD Children & School chemical emissions levels

JHAASSER

Rectangle

1557824398E Text Box BASIS OF DESIGN. PROVIDE PRODUCT EQUAL TO 150BN HIGH IMPACT CORNER GUARD BY INPRO.

MAHG191089 Repair Blake Gym ADDENDUM 1
096813-USER-TILE CARPETING-09-08-2022
150BN Impact Corner Guard