Solicitation Amendment FA301020R00200001 SF 30.pdf

PDF 528 KB Posted

Attached to
Maintain Markings and Remove Rubber from Airfield Federal contract opportunity
Solicitation number
FA301020R0020
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) were modified:

0001 - MAHG20-1048 Maintain Markings and Remove Rubber from Airfield WO 82853 IAW Statement of Work, Specifications and Drawings.

PR# F2J31D9347AW01

INFORMATION FROM TO

CIN 00000000000005079049

Section C - Specification/SOW/SOO/ORD

Miscellaneous text in this section has been modified to:

Questions and Answers:

1) The SOW states that all airfield runway markings are to be removed, does (should) this include the overrun displaced thresholds and the deceptive edge markings? This asphalt may be very soft and may not withstand hydro blasting.

A) All airfield markings are NOT to be removed, only any loose markings which may prevent adhesion of new marking paint.

2) Are the hold lines to be removed as part of the runway removal?

A) No.

3) Are all lead in lines to be removed as part of the runway removal?

A) No.

4) The SOW states that on the airfield taxiways approximately 10% of paint should be assumed to be removed.

10% is very subjective and open to interpretation. I would suggest the Government quantify the amount of removal with an actual SF quantity as a not to exceed amount.

A) The only paint to be removed is any paint that is loose and would prevent adhesion of new paint. No removal of properly adhered paint should take place therefore a quantity is not specified.

5) The drawing notes state "Remove all ECP and warning signs". Are the warning signs referenced the red line restricted area signs?

A) The warning signs are painted on the ground around the red line restricted areas.

6) Regarding the airfield marking and rubber removal:

a. How long can we have the runway shut down?

A) This will depend on how long it will take the contractor to do the work. The actual working schedule will have to be worked out with Airfield Operations. There is not a specified amount of time the runway can be shut

FA301020R00200001

down for this project.

b. What percent removal are you looking for? Typically, 75% to 85%?

A) 0% removal for markings unless there is loose paint which would prevent adhesion of new paint 100% rubber removal from runway

c. Do you have an estimate on total amount so we can estimate a percentage or a square footage to keep all bidders on the same page?

A) See above.

d. Type 1 or Type 3 reflective beads?

A) Type 1

7) Regarding the taxiways and ramps.

a. What percent removal are you looking for? Typically, 75% to 85%?

A) 0% removal of markings unless there is loose paint which would prevent adhesion of new paint.

b. Do you have an estimate on total amount so we can estimate a percentage or a square footage to keep all bidders on the same page?

A) See above.

8) How many signs are there to re-do? Do you have a spec describing physical characteristics for that signage?

A) Approximately 85 Warning Signs painted on ground around Restricted Areas

9) Will you require environmental testing for the waste product?

A) No environmental testing will be required.

10) Is there a location to deposit the waste material to dry out?

A) No designated location for waste material (rubber shavings) to dry out.

FA301020R00200001

IDCode:
Page: 1
Pages: 3
AmendNo: 0001
EffDate: 7/16/2020
ReqNo: F2J31D9347AW01
ProjNo: MAHG20-1048
IssCode: FA3010
AdmCode:
IssuedBy: FA3010 81 CONS CC

310 M ST BLDG 4605

CP 228 377 3230

KEESLER AFB, MS 39534-2701

United States ANDREW CATES, Email: andrew.cates@us.af.mil Telephone: 312-975-7270

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA301020R0020
SolDate: 6/29/2020
AwardChg:
AwardNo:
AwardDate:
Amended: 1
OffrExt:
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd:
ChgeOrder:
Modify:
SuppAgre:
SuppAuth:
ModOthr:
OthrSpec:
NoReq: 1
Require:
Copies:
Descript: The purpose of this amendment is to:

1. Provide Questions and Answers

ContNameTitle:
CoNameTitle: Kimberley Alvarez

Email: kimberley.alvarez.1@us.af.mil Telephone: 228-377-1837

ContDate:
CODate: