Amendment 1 Questions & Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_2.pdf | ||
| Sign-In_Sheet.pdf | ||
| Attachment_3_-_UFC_3-600-01_2016.pdf | ||
| Attachment_4_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_6_-_UFC_4-021-01_2008.pdf | ||
| Attachment_7_-_Wage_Det_MS180141.pdf | ||
| Attachment_9_-_SF_1444.pdf | ||
| Attachment_5_-_Reference_List.pdf | ||
| Attachment_1_-_Statement_of_Work.pdf | ||
| Attachment_8_-_Notice_of_Compliance.pdf | ||
| FA301018R0021.pdf | ||
| Attachment_2_-_Drawings_MAHG17-1114.pdf | ||
| Synopsis.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F2J31D8051AW05 MAHG17-1114
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is:
1. Provide Questions & Answ ers
2. Change Bid Response date from 7 May to 14 May 2018 @ 2:00 PM.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-May-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA301018R0021
X 9B. DATED (SEE ITEM 11)
05-Apr-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-May-2018
CODE
81ST CONTRACTING SQUADRON
SSGT MAXWELL WATANGA
310 M STREET, RM 102
KEESLER AFB MS 39534-2701
FA3010 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA301018R0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS & ANSWERS
REPLACE FIRE ALARM SABLICH CENTER
FA301018R0021 –WO: MAHG17-1114
QUESTIONS & ANSWERS
1. The current alarm system operates using how many zones?
Monaco is currently using 8 zones. Identify required additional zones with new system
2. Reference Para 3.2.5 Scope: Does the building have an operational Mass Notification system? How is it zoned?
Are additional Master Microphones required at other entrances or just the main entrance?
No MAS Notification – LOC required at each exit and annunciator at main entrance
3. Please provide the location of existing duct detectors and dampers associated with the building's HVAC System.
Duct detectors located in return air of each AHU; per E-12, E-17 and M-12
4. Please provide drawings that show the location of tamper/flow switches associated with the building's sprinkler system.
Water flow switch in vault room (104)
5. Identify number of secure rooms?
There are no secure rooms; but Commanders section may require escort or coordination
6. Identify number of rooms with boilers?
(1)
7. Identify number of rooms with gas?
(1)
8. Will the duct work require fire dampers?
The current system does not have fire dampers; only provide detectors per SOW The system will be shut down through detectors/pull stations
9. Will mechanical portions require to be brought to code for life safety?
Portions (fire suppression/detectors/fire) that pertain to SOW
10. Please confirm there are no as-builts?
The floor plans provided are the only ones currently available.
11. Will fire suppression deficiencies be required?
Deficiencies related to the interconnection between the Fire Alarm and Fire Suppression system will be required to be fixed. General deficiencies in the Fire Suppression system out of scope
12. Identify any other rooms with servers?
Room 131
13. Identify any other rooms with raised access floors?
Room 131
14. Will Flex conduit in the wall @ pull stations be acceptable?
Hard piped conduit (Labeled)
15. Will a 2nd site visit be scheduled for a Fire Suppression Sub and FPE to attend and assess the building?
There will not be any additional coordinated site visits prior to award of contract.
16. Will it be available for the Gov’t to identify only the rooms where the Fire Suppression is non-compliant?
Per SOW remove/provide new Fire Alarm detection system in its entirety
17. Will this project require any phasing?
Coordination of work will be required and especially for command sections NOTE: Demo of old system ONLY after new system is operational
18. Will the AHU’s on the roof require a Shut Down when the fire alarm is activated?
Yes
19. Will the individual offices and rooms be occupied while we are working in them?
Yes
20. Are we going to be given sections to work in phases?
Question 17: Sections to work can be coordinated ahead of time
21. Are the LOC Panel shown on the drawing to be surface mounted or flush mounted?
Surface Mounted
22. Are the fire alarms pull station flush or surface mounted?
Surface Mounted
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 07-May-2018 02:00 PM to 14-May-2018 02:00 PM.
(End of Summary of Changes)