Amend_3.pdf

PDF 31 KB Posted

Attached to
Repair Water Tower #3 Federal contract opportunity
Solicitation number
FA3010-18-R-0020_Water_Tower
Issued by
Department of the Air Force Air Education and Training Command

About this file

Amendment 3 Questions & Answers

View the file

Other files for this federal contract opportunity

Other files attached to Repair Water Tower #3, newest first.
File Type Posted
Amend_4.pdf PDF
MAHG18-1006_Water_Tower_3_Addenda.pdf PDF
7_2016_Water_Tank_Inspection_Report_Tower_3_Redacted.pdf PDF
Site_Visit_Water_Tower_3.pdf PDF
Amend_2.pdf PDF
Amend_1.pdf PDF
Attachment_1_-_MAHG181006_SOW_revA.pdf PDF
Attachment_3_-_UFC_3-120-01_1MAR14_Chng3_12DEC17_section_3-3-7.pdf PDF
Attachment_5_-_Reference_List.pdf PDF
FA301018R0020.pdf PDF
Attachment_4_-_Past_Performance_Questionnaire.pdf PDF
Attachment_8_-__SF_1444.pdf PDF
Attachment_6_-_Wage_Det_MS180141.pdf PDF
Attachment_7_-_Notice_of_Compliance.pdf PDF
Attachment_2_-_MAHG181006_Drawings.pdf PDF
Synopsis.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F2J31D8066AW03 MAHG18-1006

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

53.243The purpose of this amendment is to:

1. Provide Questions & Answ ers

2. Incorporate Addenda 1 to the SOW

3. Change Bid Response date from 7 May to 16 May 2018 @ 2:00 PM.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA301018R0020

X 9B. DATED (SEE ITEM 11)

05-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-May-2018

CODE

81ST CONTRACTING SQUADRON

SSGT MAXWELL WATANGA

310 M STREET, RM 102

KEESLER AFB MS 39534-2701

FA3010 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA301018R0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS & ANSWERS

Questions & Answers MAHG18-1006 Repair Water Tower #3

Solicitation #FA301018R0020

1. How much perimeter parking lot area can the contractor utilize as our laydown and staging area? We need as much parking lot as possible to stage generator, diminishers, blasting rigs, dumpsters, etc.

Answer: The Contractor will be given suitable laydown & staging space, but a portion of the parking lot will need to be accessible for parking use. Actual space to be coordinated prior to mobilization.

2. How long does it take for the tank to be drained and put out of service?

Answer: Approximately 1 Day

3. Does the base provide LOTO for that particular tank (transformer disconnect per Rebecca) or where is the electrical panel located that controls the tank power.

Answer: Vectrus Electric shop will LOTO the power panel at the transformer.

4. Would the government consider more than a 90 day duration from NTP?

Answer: No.

5. Does the govt have the most recent annual Inspection reports and/or Photos and Itemized structural repairs?

Answer: See attached copy of last report.

6. Can the AF Logo be painted on or does it need to be vinyl sticker?

Answer: AF Logo to be painted.

7. When adjusting windage rods and riser stay rods to stand 100MPH Winds-do we need a registered PE to design and stamp/seal.

Answer: NO.

8. Re-Tension the existing safety climbing device, do we need a registered PE to design and stamp/seal?

Answer: Yes.

9. What type/level of abrasive blast does "base metal" mean? (Spec Section 09 97 13,15, para 1.4.6.2)

Answer: Tower to be stripped to bare metal.

FA301018R0020

10. Will any 3rd party inspection or testing be required?

Answer: Yes, Base Bioenvironmental and the Utility Shop will test for Hi-Chlorine and Bac-T.

11. What is the capacity of the tank? 400,000 gallons, Is it a welded steel tank?

Answer: 4000,000 gallons and No, attached report says Riveted, Lapped.

12. What was the previous paint system used. (Manufacturer & Products)

Answer: Unknown/ attached report states ‘Epoxy’ for exterior paint system.

13. Are they charging us for filling the tower?

Answer: No.

14. Would they consider longer hours or work on Saturday if necessary?

Answer: See Addenda 1

15. Will the interior water submerged portions of the cathodic protection system have a requirement to be ANSI/NSF Standard 61 approved?

Answer: Yes, and required compliance with AFI 32-7044, Storage Tank Compliance; Title 40, Code of Federal Regulations, Part 280; and applicable state and local requirements.

16. Can you please confirm that Lead Paint Abatement is not considered to be part of the SOW.

Answer: Test results came back negative on lead. All blast media must be captured and contained.

Material collected must be tested to determine if hazardous.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

SECTION J

Document Type Description Pages Date Attachment 1 SOW RevA MAHG 181006 17 02 Mar 18 Attachment 2 Drawings MAHG 181006 2 02 Mar 18 Attachment 3 UFC 3-120-01_1MAR14_Chng3_12DEC17_ 2 01 Mar 14 Attachment 4 Past Performance Questionnaire 3 Undated Attachment 5 Past Performance Reference List 1 Undated Attachment 6 Wage Det MS180141 5 05 Jan 18 Attachment 7 Notice of Compliance 2 Undated Attachment 8 SF 1444 1 Undated Attachment 9 Addenda #1 1 01 May 18

(End of Summary of Changes)

File details come from the government source that posted it.