Amend_1.pdf

PDF 26 KB Posted

Attached to
Hercules Street Water Main and Road Repair
Solicitation number
FA301018R0015
Issued by

About this file

Amendment 1 - Questions and Answers

View the file

Other files

File Type Posted
Attachment_9_-_Addendum_1.pdf PDF
Site_Visit_Sign_In.pdf PDF
Attachment_5_-_PPQ.pdf PDF
Attachment_4_-_Wage_Det_MS180155.pdf PDF
Attachment_3_-_Drawings.pdf PDF
Attachment_7_-__Notice_of_Compliance.pdf PDF
Attachment_8_-_SF_1444.pdf PDF
Attachment_2_-_Specifications.pdf PDF
Attachment_1_-_SOW.pdf PDF
FA301018R0015.pdf PDF
Attachment_6_-_Reference_List.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F2J31D8023AW01

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate questions and answ ers received after the site visit and to add addendum # 1.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA301018R0015

X 9B. DATED (SEE ITEM 11)

21-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Mar-2018

CODE

81ST CONTRACTING SQUADRON

TSGT MARCOS A. MORALES

310 M ST

KEESLER AFB MS 39534

FA3010 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA301018R0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

1. What key personnel will be required to be onsite during this project?

A: A site supervisor will be within 15 minutes of the site while work is occurring or as needed for scheduled meetings.

2. Will there be any delays when coordinating with the pump house personnel? Are there only certain days that the pump house can be shut down?

A: 1 week. No.

3. Is contractor required to provide a SWPPP (Storm Water Pollution Prevention Plan)?

A: yes. If the project site surpasses or likely could come close to one acre in size, the contractor would then be required to comply with the MDEQ Small Construction Notice of Intent (SCNOI) for construction sites 1-5 acres in size.

4. Plans/Specs do not show any erosion control practices such as: Silt Fence, Hay Wattles, Erosion Logs, Inlet

Sediment Traps, ect…

A: While there may not be any plans/specs for erosion and sediment control BMPs, all construction sites where soil disturbance, sanding, painting, and the like at KAFB require sediment/particulate and/or erosion control BMPs. The contractor should include their erosion and sediment control BMPs in their SWPPP.

5. Plans do not show Bell Joint Restraints to for the new 8” C900, but are they required on each sides of fitting & Gate Valves?

A: Bell restraints are not required for the joints, mechanical joint restraints are required on fittings and valves.

6. The detail for bedding of the new waterline does not specify what they want? Is it #57 Stone, Sand?

A: 6” base of #57 stone with sand top around pipe.

7. Will the section of road we are working on be allowed to be shut down the entire length of the contract?

A: Yes, the north bound section of Hercules may be shut down during the length of the contract. The South bound lane should remain open as much as possible in order to limit disturbance to base traffic. Ploesti must remain open at all times.

8. The plans do not show the Magnolia Trees next to Hercules Rd but proposes to install new pipe within the dripline of the tree? Will this be allowed?

FA301018R0015

A: Contractor to minimize disturbances under the drip line. While work is ongoing, equipment and materials should not be stacked under those trees. Also, dirt and debris from the digging should not be piled up near, under, or around the trees to prevent further compaction and damage.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 23-Mar-2018 02:00 PM to 28-Mar-2018 02:00 PM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF DOCUMENTS

Document Type Description Pages Date Attachment 1 SOW 17 Nov 17 Attachment 2 Specifications 28 Undated Attachment 3 Drawings 4 30 Nov 17 Attachment 4 Wage Det MS180155 4 5 Jan 18 Attachment 5 Past Performance Questionnaire 3 Undated Attachment 6 Past Performance Referrence List 1 Undated Attachment 7 Notice of Compliance 2 Undated Attachment 8 SF 1444 3 Undated Attachment 9 Addendum 1 1 19 Mar 18