Attachment 2 - DWG.pdf

PDF 11 MB Posted

Attached to
FA301020R0008 - Replace AHU 3&4 at Sablich Center Bldg 701
Solicitation number
FA3010
Issued by

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FISHER ST

THIRD ST

T H

I R

D

S

T

S E

C O

N D

S

T

H ST

INDEX OF DRAWINGS

KEESLER AFB, MS

1 T 1.0-TITLE SHEET

M 2.0 BLDG 0701 NEW AND EXISTING AHU REFERENCE SCHEDULE3

NOT TO SCALE

LOCATION PLAN, BLDG 0701

M 1.0 BLDG 0701 EXISTING AHU REFERENCE DETAILS

0701 ROOFTOP

4 M 3.0 BLDG 0701 ROOF LAYOUT REFERENCE DRAWING

G. REED

A. MARASCA G. REED

MAHG 18-106213 NOV 2019

O. WILSON

O. WILSON

MAHG18-1062

Replace AHU 3 & 4 B0701

VARIES

5 M 4.0 BLDG 0701 AHU 3 & 4 BUILDING ZONES

6 M 5.0 BLDG 0701 NEW EQUIPMENT REFERENCE DRAWINGS

AutoCAD SHX Text N

AutoCAD SHX Text

KEESLER AFB, MISSISSIPPI

AutoCAD SHX Text

13 NOVEMBER 2019

AutoCAD SHX Text

MAHG18-1062

AutoCAD SHX Text AFF ABOVE FINISH FLOOR ABOVE FINISH FLOOR CONC. CONCRETE CONCRETE CONT. CONTINUOUS CONTINUOUS CT CERAMIC TILE CERAMIC TILE ELEC. ELECTRIC ELECTRIC GYP. GYPSUM GYPSUM HOR. HORIZONTAL HORIZONTAL HVAC HEATING VENTING AIR CONDITIONING HEATING VENTING AIR CONDITIONING MAX. MAXIMUM MAXIMUM MECH MECHANICAL MECHANICAL MIN. MINIMUM MINIMUM MLWK MILLWORK MILLWORK OC ON CENTER ON CENTER PLAM PLASTIC LAMINATE PLASTIC LAMINATE PLUM PLUMBING PLUMBING PLYWD PLYWOOD PLYWOOD PNT PAINTED PAINTED PT PORCELAIN TILE PORCELAIN TILE TYP TYPICAL TYPICAL VCT VINYL COMPOSITION TILE VINYL COMPOSITION TILE VNYL VINYL VINYL VERT VERTICAL VERTICAL W/ WITH WITH WD WOOD WOOD

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text T 1.0

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

AIR EDUCATION AND TRAINING COMMAND

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

UNITED STATES AIR FORCE

AutoCAD SHX Text

MISSISSIPPI

AutoCAD SHX Text

FACILITY NUMBER:

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

BILOXI

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text (Chief of Engineering)

AutoCAD SHX Text

SUBMITTED:

AutoCAD SHX Text (Chief of Contracts Design)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

OFFICE OF CIVIL ENGINEERS

AutoCAD SHX Text

KEESLER AIR FORCE BASE

G. REED

A. MARASCA G. REED

MAHG 18-106213 NOV 2019

O. WILSON

O. WILSON

VARIES

MAHG18-1062

Replace AHU 3 & 4 B0701

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

1. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND CONDITIONS CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO BID AND START OF CONSTRUCTION. NOTIFY CONTRACTING OFFICER OF ANY CONDITIONS DETRIMENTAL TO THE COMPLETION OF THE WORK AS DESIGNED. 2. CONFINE ALL WORK TO SPECIFIC AREAS AS DESIGNATED IN THE CONFINE ALL WORK TO SPECIFIC AREAS AS DESIGNATED IN THE SCOPE OF WORK AND SCHEDULE. 3. DRAWINGS DETAIL ARE FOR REFERENCE ONLY - ACTUAL DETAILS DRAWINGS DETAIL ARE FOR REFERENCE ONLY - ACTUAL DETAILS MAY VARY. 4. ALL MATERIALS TO BE DEMOLISHED SHALL BE REMOVED FROM THE ALL MATERIALS TO BE DEMOLISHED SHALL BE REMOVED FROM THE SITE AND DISPOSED OF OFF-SITE IN A LEGAL LANDFILL. CONTRACTOR IS NOT ALLOWED TO STOCKPILE DEMOLITION MATERIALS ON SITE; ALL MATERIALS TO BE REMOVED IN A TIMELY FASHION. 5. CONTRACTING OFFICER TO SELECT FINISHES. CONTRACTING OFFICER TO SELECT FINISHES. 6. ALL REMAINING/EXISTING AREAS SHALL BE CLEANED.ALL REMAINING/EXISTING AREAS SHALL BE CLEANED.

AutoCAD SHX Text M 1.0

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

AIR EDUCATION AND TRAINING COMMAND

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

UNITED STATES AIR FORCE

AutoCAD SHX Text

MISSISSIPPI

AutoCAD SHX Text

FACILITY NUMBER:

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

BILOXI

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text (Chief of Engineering)

AutoCAD SHX Text

SUBMITTED:

AutoCAD SHX Text (Chief of Contracts Design)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

OFFICE OF CIVIL ENGINEERS

AutoCAD SHX Text

KEESLER AIR FORCE BASE

AutoCAD SHX Text scale

AutoCAD SHX Text

AutoCAD SHX Text

BLDG 0701

AutoCAD SHX Text

EXISTING ZONE SECTION DRAWING

AutoCAD SHX Text M 1.0

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text scale

AutoCAD SHX Text

AutoCAD SHX Text

BLDG 0701

AutoCAD SHX Text

EXISTING AHU DRAWING

AutoCAD SHX Text M 1.0

AutoCAD SHX Text

NTS

MAHG 18-106213 NOV 2019

O. WILSON

O. WILSON

MAHG18-1062

Replace AHU 3 & 4 B0701

VARIES

AutoCAD SHX Text

AIR HANDLING UNIT SCHEDULE

AutoCAD SHX Text

AHU - 03

AutoCAD SHX Text

GENERAL DATA

AutoCAD SHX Text

UNIT DESIGNATION

AutoCAD SHX Text

AHU - 04

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

ROOF

AutoCAD SHX Text 13 - 11

AutoCAD SHX Text

BUILDING MODULE SERVED

AutoCAD SHX Text 11 - 09

AutoCAD SHX Text

BETWEEN COLUMNS

AutoCAD SHX Text

AutoCAD SHX Text

NUMBER OF ZONES

AutoCAD SHX Text

AutoCAD SHX Text

SUPPLY FAN DATA

AutoCAD SHX Text 13780

AutoCAD SHX Text

CFM TOTAL

AutoCAD SHX Text 14840

AutoCAD SHX Text

AutoCAD SHX Text

CFM OUTSIDE AIR

AutoCAD SHX Text

AutoCAD SHX Text 0.70

AutoCAD SHX Text E.S.P.

AutoCAD SHX Text 0.70

AutoCAD SHX Text 2.80

AutoCAD SHX Text

TOTAL S.P. INCHES

AutoCAD SHX Text 2.75

AutoCAD SHX Text 460/3/60

AutoCAD SHX Text

VOLTS/PHASE/HERTZ

AutoCAD SHX Text 460/3/60

AutoCAD SHX Text

COOLING COIL DATA

AutoCAD SHX Text 1.00

AutoCAD SHX Text

C.C. S.P. INCHES

AutoCAD SHX Text 1.00

AutoCAD SHX Text 11040

AutoCAD SHX Text

COIL CFM

AutoCAD SHX Text 11770

AutoCAD SHX Text

AutoCAD SHX Text

MAX FACE VELOCITY FPM

AutoCAD SHX Text

AutoCAD SHX Text 82.0/67.8

AutoCAD SHX Text

ENTERING AIR °FDB/°FWB

AutoCAD SHX Text 82.4/68.0

AutoCAD SHX Text 55°/54°

AutoCAD SHX Text

LEAVING AIR °FDB/°FWB

AutoCAD SHX Text 55°/54°

AutoCAD SHX Text 449,100

AutoCAD SHX Text

GRAND TOTAL HEAT BTU/HR

AutoCAD SHX Text 487,280

AutoCAD SHX Text 307,250

AutoCAD SHX Text

TOTAL SENS. HEAT BTU/HR

AutoCAD SHX Text 331,440

AutoCAD SHX Text

AutoCAD SHX Text

ENTERING C.W. TEMP °F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NUMBER OF ROWS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WATERSIDE PRESS DROP

AutoCAD SHX Text

AutoCAD SHX Text

INCHES

AutoCAD SHX Text

HOT DECK

AutoCAD SHX Text

COIL LOCATION

AutoCAD SHX Text

HOT DECK

AutoCAD SHX Text 11040

AutoCAD SHX Text

COIL CFM

AutoCAD SHX Text 11770

AutoCAD SHX Text

AutoCAD SHX Text

MAX FACE VELOCITY FPM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ENTERING AIR °F DB

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LEAVING AIR °F DB

AutoCAD SHX Text

AutoCAD SHX Text 205550

AutoCAD SHX Text

HEATING LOAD BTU/HR

AutoCAD SHX Text 225060

AutoCAD SHX Text

AutoCAD SHX Text

ENTERING H.W. TEMP °F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MINIMUM ROWS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HOT WATER GPM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ZONE SCHEDULE CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM ZONE #1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM ZONE #2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM ZONE #3

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM ZONE #4

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM ZONE #5

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM ZONE #6

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM ZONE #7

AutoCAD SHX Text

AutoCAD SHX Text O

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text O

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text O

AutoCAD SHX Text H

AutoCAD SHX Text

HEATING COIL DATA

AutoCAD SHX Text

WATERSIDE PRESS DROP

AutoCAD SHX Text

INCHES

AutoCAD SHX Text

AutoCAD SHX Text O

AutoCAD SHX Text H

AutoCAD SHX Text

CFM ZONE #8

AutoCAD SHX Text

CFM ZONE #9

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

1. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND CONDITIONS CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO BID AND START OF CONSTRUCTION. NOTIFY CONTRACTING OFFICER OF ANY CONDITIONS DETRIMENTAL TO THE COMPLETION OF THE WORK AS DESIGNED. 2. CONFINE ALL WORK TO SPECIFIC AREAS AS DESIGNATED IN THE CONFINE ALL WORK TO SPECIFIC AREAS AS DESIGNATED IN THE SCOPE OF WORK AND SCHEDULE. 3. DRAWINGS DETAIL ARE FOR REFERENCE ONLY - ACTUAL DETAILS DRAWINGS DETAIL ARE FOR REFERENCE ONLY - ACTUAL DETAILS MAY VARY. 4. ALL MATERIALS TO BE DEMOLISHED SHALL BE REMOVED FROM THE ALL MATERIALS TO BE DEMOLISHED SHALL BE REMOVED FROM THE SITE AND DISPOSED OF OFF-SITE IN A LEGAL LANDFILL. CONTRACTOR IS NOT ALLOWED TO STOCKPILE DEMOLITION MATERIALS ON SITE; ALL MATERIALS TO BE REMOVED IN A TIMELY FASHION. 5. CONTRACTING OFFICER TO SELECT FINISHES. CONTRACTING OFFICER TO SELECT FINISHES. 6. ALL REMAINING/EXISTING AREAS SHALL BE CLEANED.ALL REMAINING/EXISTING AREAS SHALL BE CLEANED.

AutoCAD SHX Text scale

AutoCAD SHX Text

AutoCAD SHX Text

B0701 AHU

AutoCAD SHX Text

EXISTING EQUIPMENT SCHEDULE

AutoCAD SHX Text M 2.0

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text M 2.0

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

AIR EDUCATION AND TRAINING COMMAND

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

UNITED STATES AIR FORCE

AutoCAD SHX Text

MISSISSIPPI

AutoCAD SHX Text

FACILITY NUMBER:

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

BILOXI

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text (Chief of Engineering)

AutoCAD SHX Text

SUBMITTED:

AutoCAD SHX Text (Chief of Contracts Design)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

OFFICE OF CIVIL ENGINEERS

AutoCAD SHX Text

KEESLER AIR FORCE BASE

AutoCAD SHX Text

1. ANY PRODUCTS SHOWN ARE BASIC OF THE DESIGN. APPROVED ANY PRODUCTS SHOWN ARE BASIC OF THE DESIGN. APPROVED EQUALS MAY BE USED. 2. CONTRACTOR SHALL VERIFY THAT ELECTRICAL CONNECTIONS FOR CONTRACTOR SHALL VERIFY THAT ELECTRICAL CONNECTIONS FOR THE NEW EQUIPMENT ARE COMPATABLE WITH EXISTING ELECTRICAL SERVICE. 3. CHW FLOW RATE SHALL NOT EXCEED 90 GMP FOR EITHER AHU. CHW FLOW RATE SHALL NOT EXCEED 90 GMP FOR EITHER AHU. 4. HW FLOW RATE SHALL NOT EXCEED 15 GPM FOR EITHER AHU. HW FLOW RATE SHALL NOT EXCEED 15 GPM FOR EITHER AHU. 5. FILTERS ARE TO BE 2" MERV-8. FILTERS ARE TO BE 2" MERV-8. 6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO RE-BALANCE IT IS THE CONTRACTOR'S RESPONSIBILITY TO RE-BALANCE AIRFLOW FOR AHU-03 AND AHU-04. 7. AHUS ARE TO BE PROVIDED WITH 1 FACTORY MOUNTED VFD AHUS ARE TO BE PROVIDED WITH 1 FACTORY MOUNTED VFD PER FAN. 8. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF DIMENSIONS FOR EXISTING CURB AND CURB ADAPTERS IF APPLICABLE. 9. AHUS SHALL INCLUDE FACTORY MOUNTED EXHAUST AIR, RETURN AHUS SHALL INCLUDE FACTORY MOUNTED EXHAUST AIR, RETURN AIR, AND OUTSIDE AIR DAMPERS WITH ELECTRONICALLY CONTROLLED ACTUATORS. 10. PROVIDE PRESSURE EQUALIZING PLATE IN HOT DECK PROVIDE PRESSURE EQUALIZING PLATE IN HOT DECK 11. CHILLED WATER AND HOT WATER VALVES TO BE PROVIDED BY CHILLED WATER AND HOT WATER VALVES TO BE PROVIDED BY CONTROLS CONTRACTOR 12. CONTRACTORS MAY INSPECT EXISTING RETROFIT ROOFTOP AHUS CONTRACTORS MAY INSPECT EXISTING RETROFIT ROOFTOP AHUS FOR USE AS REFERENCES

AutoCAD SHX Text

NOTES - MECHANICAL

AutoCAD SHX Text scale

AutoCAD SHX Text

AutoCAD SHX Text

B0701 AHU 3 & 4

AutoCAD SHX Text

NEW EQUIPMENT SCHEDULE

AutoCAD SHX Text M 2.0

AutoCAD SHX Text

NTS

MAHG 18-106213 NOV 2019

O. WILSON

O. WILSON

VARIES

MAHG18-1062

Replace AHU 3 & 4 B0701

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text scale

AutoCAD SHX Text

AutoCAD SHX Text

B0701 ROOF

AutoCAD SHX Text

REFERENCE LAYOUT

AutoCAD SHX Text M3.0

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text M 3.0

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

AIR EDUCATION AND TRAINING COMMAND

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

UNITED STATES AIR FORCE

AutoCAD SHX Text

MISSISSIPPI

AutoCAD SHX Text

FACILITY NUMBER:

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

BILOXI

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text (Chief of Engineering)

AutoCAD SHX Text

SUBMITTED:

AutoCAD SHX Text (Chief of Contracts Design)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

OFFICE OF CIVIL ENGINEERS

AutoCAD SHX Text

KEESLER AIR FORCE BASE

UNITS TO BE REPLACED

MAHG 18-106213 NOV 2019

O. WILSON

O. WILSON

VARIES

MAHG18-1062

Replace AHU 3 & 4 B0701

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text scale

AutoCAD SHX Text

AutoCAD SHX Text

AHU 3 & 4 ZONES

AutoCAD SHX Text M4.0

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text M 4.0

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

AIR EDUCATION AND TRAINING COMMAND

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

UNITED STATES AIR FORCE

AutoCAD SHX Text

MISSISSIPPI

AutoCAD SHX Text

FACILITY NUMBER:

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

BILOXI

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text (Chief of Engineering)

AutoCAD SHX Text

SUBMITTED:

AutoCAD SHX Text (Chief of Contracts Design)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

OFFICE OF CIVIL ENGINEERS

AutoCAD SHX Text

KEESLER AIR FORCE BASE

AutoCAD SHX Text AREA NOT AFFECTED BY WORK NOTE: THE AREAS DEPICTED ARE DERIVED FROM ORIGINAL AS-BUILT DOCUMENTATION FOR REFERNCE ONLY AND MAY NOT BE ENTIRELY ACCURATE

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text scale

AutoCAD SHX Text

AutoCAD SHX Text

AHU 3 & 4 ZONES

AutoCAD SHX Text M4.0

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text

1. ALL WORK PERFORMED BY THE CONTRACTOR SHALL CONFORM TO THE LATEST EDITIONS OF THE INTERNATIONAL CODE, ALL WORK PERFORMED BY THE CONTRACTOR SHALL CONFORM TO THE LATEST EDITIONS OF THE INTERNATIONAL CODE, ALL LOCAL ORDINANCES AS ADOPTED BY THE LOCAL JURISDICTION, KEESLER AS WELL AS UNITED STATES AIR FORCE STANDARDS. 2. CONTRACTOR SHALL PROVIDE ALL MATERIALS AND LABOR NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM AS CONTRACTOR SHALL PROVIDE ALL MATERIALS AND LABOR NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM AS DESCRIBED IN THE CONTRACT DOCUMENTS AND DRAWINGS EVEN IF NOT SPECIFICALLY SHOWN. 3. DRAWING ARE FOR REFERNCE PURPOSES ONLY AND MAY NOT SHOW ALL NECESSARY MATERIALS AND EQUIPMENT TO DRAWING ARE FOR REFERNCE PURPOSES ONLY AND MAY NOT SHOW ALL NECESSARY MATERIALS AND EQUIPMENT TO SCALE OR IN EXACT LOCATIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CHECK ALL MEASUREMENTS, COORDINATE ALL WORK WITH OTHER TRADES, REVIEW ANY ARCHITECTURAL AND STRUCTURAL DRAWINGS, AND VISIT THE JOBSITE TO MAKE APPROPRIATE MEASUREMENTS. 4. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND INSPECTIONS AND SHALL PAY ALL ASSOCIATED FEES FOR CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND INSPECTIONS AND SHALL PAY ALL ASSOCIATED FEES FOR THESE ITEMS IN RELATION TO THE SCOPE OF WORK FOR THIS PROJECT. 5. IN THE EVENT THAT THE SPECIFICATIONS OR DRAWINGS ARE FOUND TO BE UNCLEAR OR IN CONFLICT WITH CODES OR IN THE EVENT THAT THE SPECIFICATIONS OR DRAWINGS ARE FOUND TO BE UNCLEAR OR IN CONFLICT WITH CODES OR OTHER TRADES, THE CONTRACTOR SHALL BRING THIS TO THE ATTENTION OF THE DESIGN ENGINEER FOR CLARIFICATION BEFORE SUBMITTING A BID. 6. SUBMITTALS AND SHOP DRAWINGS FOR ALL EQUIPMENT, MATERIALS, AND ACCESSORIES SHALL BE PROVIDED TO THE SUBMITTALS AND SHOP DRAWINGS FOR ALL EQUIPMENT, MATERIALS, AND ACCESSORIES SHALL BE PROVIDED TO THE ENGINEER FOR REVIEW AND COMMENT PRIOR TO ORDER, MANUFACTURE, FABRICATION, AND INSTALLATION. FAILURE TO DO SO SHALL NOT RELIEVE THIS CONTRACTOR OF THE RESPONSIBILITY, CONSEQUENCES, AND POSSIBLE COSTS OF SUCH ACTION OR LACK OF ACTION REGARDLESS OF ANY AND ALL ERRORS OR OMISSIONS ON THESE DOCUMENTS. THE GOVERNMENT SHALL NOT BE HELD LIABLE FOR ANY COSTS ASSOCIATED WITH THE CONTRACTOR'S FAILURE TO COMPLY WITH THIS ITEM. IF SUBSTITUTIONS FOR SPECIFIED ITEMS ARE MADE, IT IS THIS CONTRACTOR'S RESPONSIBILITY TO PROVE PERFORMANCE, COMPATIBILITY, AND CONFORMANCE WITH THE ORIGINAL DESIGN AND SPECIFICATIONS. RE-DESIGN BY THE GOVERNMENT TO ACCOMMODATE SUBSTITUTIONS SHALL NOT BE PERFORMED. 7. ALL ACTUAL EQUIPMENT, MATERIALS, AND ACCESSORIES TO BE INSTALLED SHALL BE FULLY COORDINATED (AS ALL ACTUAL EQUIPMENT, MATERIALS, AND ACCESSORIES TO BE INSTALLED SHALL BE FULLY COORDINATED (AS APPLICABLE) WITH ANY ELECTRICAL, PLUMBING, CIVIL, STRUCTURAL, AND ARCHITECTURAL CONTRACTORS PRIOR TO ORDER, MANUFACTURE, FABRICATION, AND INSTALLATION. THIS INCLUDES BUT IS NOT LIMITED TO ELECTRICAL DATA, WEIGHTS, PLUMBING REQUIREMENTS, DIMENSIONS, PENETRATIONS, ETC. FAILURE TO DO SO SHALL NOT RELIEVE CONTRACTOR OF THE RESPONSIBILITY, CONSEQUENCES, AND POSSIBLE COSTS OF SUCH ACTION OR LACK OF ACTION REGARDLESS OF ANY AND ALL ERRORS OR OMISSIONS ON THESE DOCUMENTS. THE GOVERNMENT SHALL NOT BE HELD LIABLE FOR ANY COSTS ASSOCIATED WITH THE CONTRACTOR'S FAILURE TO COMPLY WITH THIS ITEM. 8. ANY AND ALL DEVIATIONS FROM THE DESIGN DOCUMENTS WITHOUT THE GOVERNMENT'S APPROVAL INDICATES ANY AND ALL DEVIATIONS FROM THE DESIGN DOCUMENTS WITHOUT THE GOVERNMENT'S APPROVAL INDICATES ACCEPTANCE BY THE CONTRACTOR FOR THE RESPONSIBILITY OF THE PERFORMANCE OF THE SYSTEM AFFECTED. THE GOVERNMENT SHALL NOT BE HELD LIABLE FOR ANY COSTS ASSOCIATED WITH THE CONTRACTOR'S FAILURE TO FOLLOW THE DESIGN DOCUMENTS. IF MODIFICATIONS TO THE SPECIFIED DESIGN ARE MADE, IT IS THIS CONTRACTOR'S RESPONSIBILITY TO PROVE PERFORMANCE, COMPATIBILITY, AND CONFORMANCE WITH THE ORIGINAL DESIGN AND SPECIFICATIONS. RE-DESIGN BY THE GOVERNMENT TO ACCOMMODATE MODIFICATIONS SHALL NOT BE PERFORMED. 9. ANY ERRORS OR OMISSIONS ON THESE DOCUMENTS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ANY ERRORS OR OMISSIONS ON THESE DOCUMENTS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER FOR REVIEW AND CORRECTION. 10. THE USE OF THESE DOCUMENTS FOR CONSTRUCTION SIGNIFIES THIS OWNER, TENANT, AND CONTRACTORS AGREEMENT THE USE OF THESE DOCUMENTS FOR CONSTRUCTION SIGNIFIES THIS OWNER, TENANT, AND CONTRACTORS AGREEMENT WITH THE ABOVE REQUIREMENTS REGARDLESS OF ANY OTHER PRIOR, CURRENT, OR FUTURE AGREEMENT AND/OR CONTRACT. 11. THE COMPLETED SYSTEMS SHALL BE CALIBRATED AND TESTED FOR PROPER OPERATION AND THE RESULTS THE COMPLETED SYSTEMS SHALL BE CALIBRATED AND TESTED FOR PROPER OPERATION AND THE RESULTS DOCUMENTED IN A FORMAL WRITTEN REPORT. THE REPORT SHALL BE PROVIDED TO THE CONSTRUCTION MANAGER FOR REVIEW AND COMMENT BY THE DESIGN ENGINEER. 12. ALL LINE VOLTAGE AND LOW-VOLTAGE CONTROLS, ACCESSORIES, AND INTERCONNECTING WIRING SHALL BE PROVIDED ALL LINE VOLTAGE AND LOW-VOLTAGE CONTROLS, ACCESSORIES, AND INTERCONNECTING WIRING SHALL BE PROVIDED AND INSTALLED BY CONTRACTOR OR ASSOCIATED SUB-CONTRACTORS. 13. REPLACE/REPAIR ALL INSULATION, DUCTWORK, PIPING, ETC. DISTURBED BY THIS WORK WITH MATERIALS AND FINISHES REPLACE/REPAIR ALL INSULATION, DUCTWORK, PIPING, ETC. DISTURBED BY THIS WORK WITH MATERIALS AND FINISHES TO MATCH EXISTING 14. COORDINATE ANY NECESSARY SYSTEM SHUTDOWNS OR OUTAGES THROUGH THE CONSTRUCTION MANAGER A MINIMUM OF COORDINATE ANY NECESSARY SYSTEM SHUTDOWNS OR OUTAGES THROUGH THE CONSTRUCTION MANAGER A MINIMUM OF 2 WEEKS PRIOR TO SHUTDOWN OR OUTAGE. INCLUDE SYSTEM AND BUILDING SECTIONS AFFECTED, DATE, TIME OF DAY, AND LENGTH OF PROPOSED/EXPECTED OUTAGE.

MECHANICAL PROJECT NOTES

MAHG 18-106213 NOV 2019

O. WILSON

O. WILSON

VARIES

MAHG18-1062

Replace AHU 3 & 4 B0701

AHU-04 PLAN VIEW

AHU-03 PLAN VIEW

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text M 5.0

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

AIR EDUCATION AND TRAINING COMMAND

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

UNITED STATES AIR FORCE

AutoCAD SHX Text

MISSISSIPPI

AutoCAD SHX Text

FACILITY NUMBER:

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

BILOXI

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text (Chief of Engineering)

AutoCAD SHX Text

SUBMITTED:

AutoCAD SHX Text (Chief of Contracts Design)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

OFFICE OF CIVIL ENGINEERS

AutoCAD SHX Text

KEESLER AIR FORCE BASE

AutoCAD SHX Text

MECHANICAL PROJECT NOTES

AutoCAD SHX Text EQUIPMENT DRAWINGS ARE FOR BASIS OF DESIGN AND COST ESTIMATING ONLY. NOT FOR CONSTRUCTION AS IS. CONTRACTOR IS REQUIRED TO FIELD VERIFY SPECIFIC DIMENSIONS PRIOR TO ORDERING MATERIAL.

1. ALL WORK PERFORMED BY THE CONTRACTOR SHALL CONFORM TO THE LATEST EDITIONS OF THE INTERNATIONAL CODE, ALL WORK PERFORMED BY THE CONTRACTOR SHALL CONFORM TO THE LATEST EDITIONS OF THE INTERNATIONAL CODE, ALL LOCAL ORDINANCES AS ADOPTED BY THE LOCAL JURISDICTION, KEESLER AS WELL AS UNITED STATES AIR FORCE STANDARDS. 2. CONTRACTOR SHALL PROVIDE ALL MATERIALS AND LABOR NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM AS CONTRACTOR SHALL PROVIDE ALL MATERIALS AND LABOR NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM AS DESCRIBED IN THE CONTRACT DOCUMENTS AND DRAWINGS EVEN IF NOT SPECIFICALLY SHOWN. 3. DRAWING ARE FOR REFERNCE PURPOSES ONLY AND MAY NOT SHOW ALL NECESSARY MATERIALS AND EQUIPMENT TO DRAWING ARE FOR REFERNCE PURPOSES ONLY AND MAY NOT SHOW ALL NECESSARY MATERIALS AND EQUIPMENT TO SCALE OR IN EXACT LOCATIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CHECK ALL MEASUREMENTS, COORDINATE ALL WORK WITH OTHER TRADES, REVIEW ANY ARCHITECTURAL AND STRUCTURAL DRAWINGS, AND VISIT THE JOBSITE TO MAKE APPROPRIATE MEASUREMENTS. 4. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND INSPECTIONS AND SHALL PAY ALL ASSOCIATED FEES FOR CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND INSPECTIONS AND SHALL PAY ALL ASSOCIATED FEES FOR THESE ITEMS IN RELATION TO THE SCOPE OF WORK FOR THIS PROJECT. 5. IN THE EVENT THAT THE SPECIFICATIONS OR DRAWINGS ARE FOUND TO BE UNCLEAR OR IN CONFLICT WITH CODES OR IN THE EVENT THAT THE SPECIFICATIONS OR DRAWINGS ARE FOUND TO BE UNCLEAR OR IN CONFLICT WITH CODES OR OTHER TRADES, THE CONTRACTOR SHALL BRING THIS TO THE ATTENTION OF THE DESIGN ENGINEER FOR CLARIFICATION BEFORE SUBMITTING A BID. 6. SUBMITTALS AND SHOP DRAWINGS FOR ALL EQUIPMENT, MATERIALS, AND ACCESSORIES SHALL BE PROVIDED TO THE SUBMITTALS AND SHOP DRAWINGS FOR ALL EQUIPMENT, MATERIALS, AND ACCESSORIES SHALL BE PROVIDED TO THE ENGINEER FOR REVIEW AND COMMENT PRIOR TO ORDER, MANUFACTURE, FABRICATION, AND INSTALLATION. FAILURE TO DO SO SHALL NOT RELIEVE THIS CONTRACTOR OF THE RESPONSIBILITY, CONSEQUENCES, AND POSSIBLE COSTS OF SUCH ACTION OR LACK OF ACTION REGARDLESS OF ANY AND ALL ERRORS OR OMISSIONS ON THESE DOCUMENTS. THE GOVERNMENT SHALL NOT BE HELD LIABLE FOR ANY COSTS ASSOCIATED WITH THE CONTRACTOR'S FAILURE TO COMPLY WITH THIS ITEM. IF SUBSTITUTIONS FOR SPECIFIED ITEMS ARE MADE, IT IS THIS CONTRACTOR'S RESPONSIBILITY TO PROVE PERFORMANCE, COMPATIBILITY, AND CONFORMANCE WITH THE ORIGINAL DESIGN AND SPECIFICATIONS. RE-DESIGN BY THE GOVERNMENT TO ACCOMMODATE SUBSTITUTIONS SHALL NOT BE PERFORMED. 7. ALL ACTUAL EQUIPMENT, MATERIALS, AND ACCESSORIES TO BE INSTALLED SHALL BE FULLY COORDINATED (AS ALL ACTUAL EQUIPMENT, MATERIALS, AND ACCESSORIES TO BE INSTALLED SHALL BE FULLY COORDINATED (AS APPLICABLE) WITH ANY ELECTRICAL, PLUMBING, CIVIL, STRUCTURAL, AND ARCHITECTURAL CONTRACTORS PRIOR TO ORDER, MANUFACTURE, FABRICATION, AND INSTALLATION. THIS INCLUDES BUT IS NOT LIMITED TO ELECTRICAL DATA, WEIGHTS, PLUMBING REQUIREMENTS, DIMENSIONS, PENETRATIONS, ETC. FAILURE TO DO SO SHALL NOT RELIEVE CONTRACTOR OF THE RESPONSIBILITY, CONSEQUENCES, AND POSSIBLE COSTS OF SUCH ACTION OR LACK OF ACTION REGARDLESS OF ANY AND ALL ERRORS OR OMISSIONS ON THESE DOCUMENTS. THE GOVERNMENT SHALL NOT BE HELD LIABLE FOR ANY COSTS ASSOCIATED WITH THE CONTRACTOR'S FAILURE TO COMPLY WITH THIS ITEM. 8. ANY AND ALL DEVIATIONS FROM THE DESIGN DOCUMENTS WITHOUT THE GOVERNMENT'S APPROVAL INDICATES ANY AND ALL DEVIATIONS FROM THE DESIGN DOCUMENTS WITHOUT THE GOVERNMENT'S APPROVAL INDICATES ACCEPTANCE BY THE CONTRACTOR FOR THE RESPONSIBILITY OF THE PERFORMANCE OF THE SYSTEM AFFECTED. THE GOVERNMENT SHALL NOT BE HELD LIABLE FOR ANY COSTS ASSOCIATED WITH THE CONTRACTOR'S FAILURE TO FOLLOW THE DESIGN DOCUMENTS. IF MODIFICATIONS TO THE SPECIFIED DESIGN ARE MADE, IT IS THIS CONTRACTOR'S RESPONSIBILITY TO PROVE PERFORMANCE, COMPATIBILITY, AND CONFORMANCE WITH THE ORIGINAL DESIGN AND SPECIFICATIONS. RE-DESIGN BY THE GOVERNMENT TO ACCOMMODATE MODIFICATIONS SHALL NOT BE PERFORMED. 9. ANY ERRORS OR OMISSIONS ON THESE DOCUMENTS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ANY ERRORS OR OMISSIONS ON THESE DOCUMENTS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER FOR REVIEW AND CORRECTION. 10. THE USE OF THESE DOCUMENTS FOR CONSTRUCTION SIGNIFIES THIS OWNER, TENANT, AND CONTRACTORS AGREEMENT THE USE OF THESE DOCUMENTS FOR CONSTRUCTION SIGNIFIES THIS OWNER, TENANT, AND CONTRACTORS AGREEMENT WITH THE ABOVE REQUIREMENTS REGARDLESS OF ANY OTHER PRIOR, CURRENT, OR FUTURE AGREEMENT AND/OR CONTRACT. 11. THE COMPLETED SYSTEMS SHALL BE CALIBRATED AND TESTED FOR PROPER OPERATION AND THE RESULTS THE COMPLETED SYSTEMS SHALL BE CALIBRATED AND TESTED FOR PROPER OPERATION AND THE RESULTS DOCUMENTED IN A FORMAL WRITTEN REPORT. THE REPORT SHALL BE PROVIDED TO THE CONSTRUCTION MANAGER FOR REVIEW AND COMMENT BY THE DESIGN ENGINEER. 12. ALL LINE VOLTAGE AND LOW-VOLTAGE CONTROLS, ACCESSORIES, AND INTERCONNECTING WIRING SHALL BE PROVIDED ALL LINE VOLTAGE AND LOW-VOLTAGE CONTROLS, ACCESSORIES, AND INTERCONNECTING WIRING SHALL BE PROVIDED AND INSTALLED BY CONTRACTOR OR ASSOCIATED SUB-CONTRACTORS. 13. REPLACE/REPAIR ALL INSULATION, DUCTWORK, PIPING, ETC. DISTURBED BY THIS WORK WITH MATERIALS AND FINISHES REPLACE/REPAIR ALL INSULATION, DUCTWORK, PIPING, ETC. DISTURBED BY THIS WORK WITH MATERIALS AND FINISHES TO MATCH EXISTING 14. COORDINATE ANY NECESSARY SYSTEM SHUTDOWNS OR OUTAGES THROUGH THE CONSTRUCTION MANAGER A MINIMUM OF COORDINATE ANY NECESSARY SYSTEM SHUTDOWNS OR OUTAGES THROUGH THE CONSTRUCTION MANAGER A MINIMUM OF 2 WEEKS PRIOR TO SHUTDOWN OR OUTAGE. INCLUDE SYSTEM AND BUILDING SECTIONS AFFECTED, DATE, TIME OF DAY, AND LENGTH OF PROPOSED/EXPECTED OUTAGE.

Sheets and Views
MAHG181062_Replace AHU #3_#4_B0701_DWG-T1.0
MAHG181062_Replace AHU #3_#4_B0701_DWG-M 1.0
MAHG181062_Replace AHU #3_#4_B0701_DWG-M 2.0
MAHG181062_Replace AHU #3_#4_B0701_DWG-M 3.0
MAHG181062_Replace AHU #3_#4_B0701_DWG-M 4.0
MAHG181062_Replace AHU #3_#4_B0701_DWG-M 5.0

File details come from the government source that posted it. Updated .