PERFORMANCE WORK STATEMENT
FOR
Andrews AFB In-Row Cooler, Electrical, and
Refrigerant Disconnect and Removal
FA4800-XX-X-XXXX
83d Network Operations Squadron Operation Location-Bravo (OL-B)
Andrews Air Force Base Joint Base Andrews, MD
PWS Contract Number Contract Title 9 August 2018
TABLE OF CONTENTS
1.0. SCOPE OF WORK
2.0. DESCRIPTION OF SERVICES
3.0. GENERAL INFORMATION
4.0. SERVICES SUMMARY
5.0. GOVERNMENT AND CONTRACTOR FURNISHED PROPERTY, SUPPLIES AND
SERVICES
APPENDIX A – CONTRACTOR MANPOWER REPORTING
1.0. SCOPE OF WORK. The contractor shall provide all management, transportation, tools, supplies, equipment, and labor with the skill sets necessary to safely remove the In-Row Cooling System, electrical wiring associated with the Area Processing Center (APC), and refrigerant chemicals located at 1558 Alabama Ave, Suite 13, on Andrews Air Force Base (AAFB), Maryland (MD) 20762-6116.
2.0 DESCRIPTION OF SERVICES. The contractor shall provide all management, transportation, tools, supplies, equipment, and labor necessary to disconnect and put eight (8) ACRC100 InRow Units in a safe condition. Disconnect/remove electrical feeds as necessary to ensure safety. Shutoff supply/return lines from existing CDU in room. Drain and disconnect supply and return lines and remove liquid glycol mix as required from liquid cooled units, cap off lines above units and in ceiling. Disconnect condensate lines and remove from underfloor drain. Remove glycol mix from facility and dispose of in accordance to local and federal laws.
2.1 UPS and PDU’s:
Disconnect electrical feeds between two PX80 PDU’s and existing disconnects in room and within 50’ each. Remove underfloor feeds (pipe and wire) and take offsite. Make disconnects safe by turning off associated feeder breakers. Remove all whips from PDU’s that are currently feeding 40 racks/PDU’s. Disconnect existing PX80 UPS that is not being utilized today. Disconnect feeds from PX80 PDU’s that are feeding existing RDP distribution. Remove all whips from RDP that are feeding racks.
2.2 Racks/Ladder/Troughs:
Secure six (6) pieces of ladder to concrete above ceiling that are existing and have data cable running across them that must stay in place. Disconnect and remove all existing ladder, troughs and PDU’s on 40 APC racks. Disconnect all baying straps and raise all feet from racks. Ready all equipment for removal offsite.
2.3 Removal:
Provide trucks and manpower to remove all equipment offsite. Recycle all equipment in accordance to and recycle in accordance to local and federal laws. Provide certificate of recycling if required.
Note:
• All work to be completed during normal business hours.
• Includes materials and all travel expenses.
• No permits or drawings included.
• Customer to remove all equipment and data cable prior to any work being completed.
Any remaining data cable will be cut during the removal process.
3.0. GENERAL INFORMATION.
3.1. Hours of Operation. The hours of operation are 0700 to 1600 Eastern Standard Time (EST), Monday – Friday, excluding federal holidays. If the contractor wishes to perform any services outside of the normal hours of operation, the contractor shall coordinate TSgt Damien Hart, 83d Network Operations Squadron ((83 NOS) (301) 881-2947), no later than one week prior to the scheduled event. In the event of emergency circumstances, accommodations may be made on a case by case basis.
3.1.1. Base Closure Days. If the Base Commander determines the base is closed due to snow, hurricane, or Acts of God, the contractor shall reschedule work planned for this time.
3.1.2. Federal Holidays. The Contractor shall not be required to work any of the following federal holidays:
New Year’s Day - 1 January Martin Luther King Day - 3rd Monday in January Washington’s Birthday - 3rd Monday in February Memorial Day - last Monday in May Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December
3.1.2.1. If a holiday falls on Saturday, the preceding Friday shall be observed. If a holiday falls on Sunday, the following Monday shall be observed. If a holiday falls on a scheduled service day, the contractor shall be responsible for rescheduling services for the first day post the holiday observance.
3.2. Non Mission-Essential Functions. It has been determined by the Functional Commander of this service that the requirements under this PWS are non-essential and therefore shall not be performed during a crisis, exercise or inclement weather.
3.3. English Language Requirement. All contractor personnel shall read, understand, speak and write English fluently.
3.4. Contract Manager. The Contractor shall provide a contract manager and an alternate who shall be responsible for the performance of the work; these duties can be an additional duty.
These individuals shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract and shall be designated, in writing, to the Contracting Officer (CO). The alternate contract manager shall act for the contract manager when the manager is absent.
3.4.1. The contract manager or alternate shall be available within two hours to meet on the installation or by telecom with the CO and/or with other government personnel designated by the CO during normal duty hours to discuss issues or concerns.
3.5. Communication. Contractor personnel shall maintain open and professional communication with government personnel at all times. Complaints validated by the COR shall be reported in writing to the CO and the contractor for action. Failure of the contractor to take corrective action on validated complaints raised by the COR and the CO will be considered a failure to perform.
3.6. Appearance. Contractor personnel shall present a professional, conservative, and neat appearance. Contractor personnel shall report for duty in a professional manner, in appropriate attire and having complied with socially acceptable standards of personal hygiene.
3.7. Contractor Identification. All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious are required to identify themselves as such to avoid being mistaken for Government officials. Contractors performing work at Government workplaces will provide their employees with an easily readable identification (ID) badge indicating the employee's name, the contractor's name, the functional area of assignment, and a recent color photograph of the employee.
Contractors shall require their employees to wear the ID badges visibly when performing work at Government workplaces. Contractor personnel must also ensure that all e-mails, documents, or reports they produce are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. All signature blocks on e-mails shall indicate the Contractor's name.
All e-mail address lines shall include CTR in the address line.
3.8. Conflict of Interest. The contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest.
The contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such a person seeks and receives approval in accordance with the Department of Defense (DoD) Directive 5500.7 and Air Force policy. If prior military, personnel must have been discharged under honorable conditions with no administrative actions taken against them.
3.9. Security Requirements for Unclassified Contracts. The contractor shall ensure the necessary pass and identification items required for contract performance are obtained for all personnel.
3.9.1. Listing of Personnel. The contractor shall maintain a current listing of personnel. The list shall include the employee’s name, social security number and level of security clearance. The list shall be validated and signed by the company’s Facility Security Officer (FSO) and provided to the sponsoring agency’s security manager and the CO. An updated listing shall be provided when an employee’s status or information changes.
3.9.2. Temporary Base Access Passes. The contractor shall ensure that each employee obtains the following pass and identification items: all necessary cards, passes, buttons, decals, or other items required for access to the areas and the installation. Upon contract award and the replacement of any employees, the contractor will be required to complete a base access request form which will be submitted to the CO.
3.9.3. Pass and Identification. All prospective contractors shall undergo a verification process to determine the trustworthiness and suitability prior to being granted access to federal property.
Limited access with escort may be granted (at the installation's discretion) for an interim period while investigations are being conducted. IAW 18 USC 1382, the authority of the Installation Commander to control and deny a Contractor employee entry to all or part of the installation is absolute.
3.9.4. Employee clearance requirements. As a minimum, contractor personnel must be able to obtain and maintain a TIER 1, favorable suitability/fitness determination under 5 CFR 731 or equivalent. The Government will submit background investigations for positions that require a Common Access Card (CAC) and/or IT access only. Prior to CAC issuance, an FBI fingerprint check must be completed without adverse comment, and the T1 Investigation or equivalent must be initiated. CACs will not be issued before the fingerprint check results have been completed and the investigation has been opened/scheduled at Office of Personnel Management (OPM).
Contractor personnel receiving unfavorable T1 Investigations shall not be employed. The sponsoring Government agency will submit requests for investigation on AF Form 2583, Request for Personnel Security Action, at no additional cost to the contractor.
3.9.5 Physical Security (Security of Government Property). The contractor shall safeguard all government property, including controlled forms provided for contractor use. At the close of each work period, government equipment, facilities, and squadron assets and materials shall be secured.
3.9.6. Entry Procedures to Controlled/Restricted Areas. The contractor shall implement local base procedures for entry to Air Force (AF) controlled/restricted areas where contractor personnel will work.
3.9.7. Reporting Requirements. The contractor shall comply with the requirements of Volume 1, AFI 71-101, Criminal Investigations, and paragraph 1.1 of Volume 2, Protective Service Matters. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware that may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information. The contractor personnel’s immediate supervisor shall brief him/her upon initial on-base assignment and as required thereafter.
3.9.8. Retrieving Identification Media. The contractor shall return all identification media to the sponsoring agency’s security office or the CO upon completion/termination of the contract or upon departure of any personnel during the course of the contract. Failure to do so may delay payment to the contractor. Final payment may be withheld until identification media is returned.
3.10. Traffic Laws. The contractor and/or contractor personnel shall comply with the installation traffic code as specified in Maryland State Law and Air Force Instruction (AFI) 31-218, Motor Vehicle Traffic Supervision (current edition). The Contractor and/or contractor personnel shall comply with current instruction on cell phone use while on any military installation.
3.11. Weapons, Firearms, and Ammunition. Contractor personnel are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately-owned vehicle while on any military installation. This prohibition includes any individual who may otherwise possess any legally issued concealed weapons permit.
3.12. Smoking in Air Mobility Command (AMC) Facilities. Contractors are advised that the AMC Commander has placed restrictions on the smoking of tobacco products in AMC facilities.
Contract personnel and visitors are subject to the same restrictions as Government personnel.
Smoking is permitted only in designated smoking areas.
3.13. ENVIRONMENTAL MANAGEMENT: Joint Base Andrews is dedicated to the conservation, protection, and enhancement of the environment. The contractor shall comply with all: federal laws and regulations; state and local laws, ordinances, and regulations; and Installation policies and procedures. Joint Base Andrews (JBA) Installation specific policies and procedures:
3.13.1. Joint Base Andrews (JBA) – Andrews Air Force Base. The contractor must comply with all provisions of the JBA Environmental Special Conditions. If you have any questions, please contact your project manager or the 11th Contracting Officer first and have them contact the 11th CES Environmental Element on your behalf.
4.0. SERVICES SUMMARY (SS). The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The SS and the contractor’s Quality Control Plan provide information on contract requirements, the expected level of contractor performance and the expected method of government surveillance and confirmation of services provided. These thresholds are critical to mission success.
Procedures as set forth in the Federal Acquisition Regulation (FAR) 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies. The absence of any contract requirements from the SS shall not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Government has the right to inspect all services required in the contract.
Item Performance
Objective
PWS
Para
Performance Threshold
Method of Surveillance
SS-1 In-Row Cooler, Electrical, and Refrigerant Disconnect and Removal
1 Satisfactorily disconnect and removal
Gov’t personnel’s verification of disconnect and removal
4.1. Performance Evaluation. The purpose of the Services Summary is to define performance evaluation and payment procedures. The Performance Objective (column 1) describes what the government will survey. Performance of a service will be evaluated to determine whether or not it meets the Performance Threshold (PT) of the contract. When the PT is exceeded, the COR will document the performance issue in a Corrective Action Report (CAR) or a Performance Assessment Report (PAR) and provide it to the Contracting Officer to finalize it and issue the report to the contractor.
4.1.1. The Government will periodically evaluate the contractor’s performance by appointing a representative(s) to monitor performance to ensure services are received. The government representative will evaluate the contractor’s performance through inspections of reports and contractor services documentation. The Government may inspect each task as completed or increase the number of quality assurance inspections if deemed appropriate because of repeated failures or because of repeated customer complaints. Likewise, the Government may decrease the number of quality assurance inspections if performance dictates.
4.1.2. If any of the services do not conform to contract requirements, the Government may require the contractor to perform the services again in conformity with contract requirements at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the Government may:
- Require the contractor to take necessary action to ensure that future performance conforms to contract requirements; and
- Reduce the contract price to reflect the reduced value of the services performed.
4.1.3. Failing to meet the performance threshold as outlined in the SS for any of these performance objectives in any one month period may result in an immediate Progress Meeting with the Multi-Functional Team (MFT). All remedies shall be in accordance with the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance.
4.2. Quality Control. The contractor shall develop and maintain a quality control program to ensure services are performed in accordance with this contract and PWS as required.
4.3. Quality Assurance. The Government shall inspect and evaluate the contractor’s performance to ensure services are received in accordance with requirements set forth in this contract. The 83 NOS personnel shall inspect by watching actual task performance, physically checking an attribute of the completed task, checking management information reports, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this PWS. When a performance threshold has not been met or contractor performance has not been accomplished, the 83 NOS personnel will initiate a Corrective Action Report (CAR) or Performance Assessment Report (PAR), and provide the Contracting Officer a Contract Discrepancy Report (CDR) for issuance to the contractor. The contractor shall respond to the CDR in accordance with instructions provided and return it to the Contracting Officer no later than the suspense given by the CO.
4.4. Surveillance Methods. Government personnel will verify the: disconnection and ensure the ACRC100s InRow units are put in a safe condition; disconnect/remove electrical feeds as necessary to ensure safety; shutoff supply/return lines from existing CDU in room; drain and disconnect supply and return lines and remove liquid glycol mix as required from liquid cooled units, cap off lines above units and in the ceiling; disconnect condensate lines and remove from underfloor drain; and remove glycol mix from facility and dispose of in accordance to local and federal laws.
4.4.1. 100% Surveillance. This method requires the 83 NOS personnel to inspect the service each time it occurs. Results shall be annotated on the inspection checklist. Any deficiency shall be documented and the contractor shall re-perform service as directed. Any unsatisfactory inspection identified but re-performed acceptably, shall still be counted as an unsatisfactory inspection for trending purposes.
4.4.2. Periodic Surveillances. This method requires the 83 NOS personnel to employ a spot check style of evaluation based on the contractor’s schedule. Periodic surveillances will be conducted on a scheduled basis (daily, weekly, monthly) and may be adjusted, based on quality trends. Any unsatisfactory inspection (defect) result shall be recorded, and the contractor shall re-perform the service after notification by the 83 NOS personnel.
4.4.3. Customer Complaint. This method requires the customer to fill out a locally generated form provided by the Contracting Officer. The CO will verify the complaint and notify the contractor of valid complaints. The contractor shall acknowledge the complaint within two hours and inform the CO of his recommendation. Any deficiency shall be documented and the contractor shall re-perform service immediately, if appropriate, or within 24 hours at no increase in contract amount. The contractor shall respond to the Customer Complaint in accordance with the instructions provided and return it to the Contracting Office within 5 calendar days of receipt.
Any unsatisfactory inspection identified but re-performed acceptably, shall still be counted as an unsatisfactory inspection.
4.5. Periodic Progress Meetings. The Contracting Officer, Functional Commander, or other government personnel as appropriate, and the contractor shall periodically meet to discuss the contractor’s performance. The following issues shall be discussed: observed positive performance and steps taken by the contractor to prevent unsatisfactory performance, any modifications required of the contract, opportunities to improve performance, unsatisfactory inspections and trends against each performance objective.
The minutes of these meetings will be reduced to writing, signed by the Contracting Officer and any other signatures as deemed appropriate, and distributed to the functional area and the contractor. Should the contractor not concur with the minutes, the contractor will provide a written notification to the Contracting Officer identifying areas of non-concurrence for resolution within 10 days of receipt.
5.0. GOVERNMENT AND CONTRACTOR FURNISHED PROPERTY, SUPPLIES
AND/OR SERVICES.
There is no Government-furnished property for this Contractor that meets the intent of FAR Part 45. There is Government equipment that will remain in the control and accountability of the Government.
Equipment Inventory. An inventory of Government equipment to be used by the contractor to perform this requirement shall be done within five (5) calendar days after the start of the contract period, and not later than ten (10) calendar days before the completion of the contract period (including any option periods). The Contractor and 83 NOS personnel shall conduct a joint inventory of all Government equipment and the Contractor shall sign a hand receipt for all equipment provided by the Government. During joint inventory, any items of equipment missing or not in working order shall be recorded and the Contracting Officer notified in writing.
The Contractor and the Government representative shall jointly determine the working order and condition of all equipment and document their findings on the inventory.
5.1. Contractor Furnished Items and Services. Except for those items or services specifically stated in this PWS to be government-furnished, the contractor shall furnish everything required to perform this contract in accordance with all of its terms and conditions. It is the contractor’s responsibility to ensure contractor personnel are familiar with and understand the contents of this PWS as well as the company’s handbooks/handouts, etc. prior to beginning work.
5.2. Telephone Service. The Government will provide telephone service through a land line.
Use of a government- supplied telephone is provided solely for official use government business and shall not be used to transact personal business by contractor personnel.
5.3. Utilities. The Government will furnish electricity, water and sewage services as necessary for accomplishment of work in accordance with this contract. The contractor shall adhere to all base level utility conservation practices or requirements. The contractor shall be responsible for operating under conditions that prevent waste of utilities.
5.4. Security, Fire and Medical Services. The Government will provide police and fire protection. In the event of a medical emergency, base ambulance services for transporting an injured employee to a local hospital is available on a cost reimbursement basis.
| PERFORMANCE WORK STATEMENT |
| FA4800-XX-X-XXXX |
| 83d Network Operations Squadron |
| Operation Location-Bravo (OL-B) |
| Andrews Air Force Base |
| Joint Base Andrews, MD |
| TABLE OF CONTENTS |