AJXF_16-1523_Repair_Roof_Bldg_1934-Pricing_Schedule.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Repair Roof and Structure
- Solicitation number
- FA2860-16-R-0022
About this file
Section J- Attachment 2 Pricing Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AJXF_16-1523_Repair_Roof_Bldg_1934_RFP.doc | DOC document | |
| AJXF_16-1523_Repair_Roof_Bldg_1934-SOW.doc | DOC document | |
| Wage_Determination_February_2016.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STND 3052 (FRONT)
| CONSTRUCTION COST ESTIMATE BREAKDOWN | Pricing Schedule April 2015 | ||||||||
| CONTRACTOR | ADDRESS | ||||||||
| SUGGESTED CONTRACTOR ESTIMATE SHEET | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| BLDG 1934 Replace flat roof, repair structure | $0.00 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| AJXF 16-1523-00 | JOINT BASE ANDREWS | ||||||||
| UNIT | MATERIAL COST | LABOR COSTS | |||||||
| Line | ITEM | OF | QUANTITY | MANHOURS | AVERAGE | LINE | |||
| NO. | MEASURE | UNIT | TOTAL | MANDAYS | RATE | TOTAL | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (10) |
| DEMOLITON | LS | 0.00 |
| Lift equipment | MO | 2.00 |
| Dumpster | Week | 3.00 |
| remove metal decking | SF | 1500.00 |
| remove steel joist and girder | ea | 2.00 |
| Remove gravel | SF | 3010.00 |
| Remove roofing | SF | 3010.00 |
| Remove Insulation | SF | 3010.00 |
| Remove flashing | SF | 500.00 |
| Haul debris | CY | 200.00 |
| Dump Charge | TON | 50.00 |
| NEW WORK | ||
| Install new girder | LF | 50 |
| Install new steel joist | ton | 0.5 |
| Install new metal roof deck | SF | 1500 |
| Install new PVC Roof | SQ | 31 |
| Install new cover board | SF | 3010 |
| Install new insulation | SF | 3010 |
| Install new flashings | SF | 500 |
| lift truck/crane | MO | 3 |
| Forklift | Ea | 2 |
| walk pads | SF | 0.00 |
| SUBTOTAL | ERROR:#VALUE! |
| ERROR:#VALUE! | |
| OVERHEAD (%) | |
| PROFIT (%) | |
| BOND (%) |
TOTAL
&K000000Page &P of &N
STND 3052 (BACK)
| TOTAL MATERAL COSTS | |||
| TOTAL LABOR COSTS | |||
| TOTAL OTHER DIRECT COSTS | |||
| TOTAL DIRECT COSTS | |||
| OVERHEAD | ERROR:#VALUE! | ||
| SUBTOTAL | ERROR:#VALUE! | ||
| PROFIT | ERROR:#VALUE! | ||
| TOTAL PRICE | ERROR:#VALUE! | ||
| DATE: | FIRM NAME: | ||
| TITLE: | BY: | ||
| (Signature) |