Remove Remnants of Stairs at Fourth Cliff Recreation Area
Solicitation number
FA283519RA023
Issued by

About this file

Government Statement of Work

View the file

Other files

File Type Posted
Solicitation_-_FA283519RA023.pdf PDF
Stair_Remnants_Photos.pdf PDF
Wage_Determination_22_Feb_19.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

For

Remove Remnants of Stairs Location Building: 4th Cliff

By: Lenore Gerossie

WORK ORDER NUMBER: 66833

DATED: 19 April 2019

1. GENERAL INFORMATION:

This project is intended to remove remnants of stairs, rails, pilings and landings in accordance with all applicable National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the Commonwealth of Massachusetts Building Code, Minor Activities Permit and Massachusetts General Law requirements, Unified Facilities Criteria (UFC) state and federal codes, base standards and manufacturer’s instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply.

2. SCOPE: Remove Remnants of Stairs

See attached pictures of stairs Minor Activities Permit must be posted during work on stairs Cut pilings to a height of about 5 feet Remove all stairs, rails, and landings Care shall be taken to cause the least amount of disturbance to the area.

Under no circumstance is sand or cobble to be removed from any beach and brought elsewhere: this would be a violation of DEP regulations and the Scituate Bylaw The work should be completed without impact or disturbance to any abutting properties All stairs, rails and landings to be removed and disposed of off site Danger sign to remain on pilling

3. GENERAL REQUIREMENTS:

Work includes, but is not limited to the following:

a. Provide resolutions of any technical problems that arise during the construction.

b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.

c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.

d. The Contractor is solely responsible for compliance with the Occupational Safety and

Health Act of 1974 (OSHA) and the protection of their employees and all sub-contractor employees. In performing work under this contract on a Government installation, the contractor shall report any accidents involving Air Force property/equipment damage, or contractor personnel injuries occurring on the job or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the contracting officer within five days.

e. Any modifications and addition on a facility that contains Lightning Protections System (LPS) This includes paint projects, roofing projects, projects requiring roof penetrations, installation of new HVAC or other metallic equipment, antenna installation, or other work.

Additions and modifications to the facility envelope require re-evaluation of the LPS for the completed facility as a whole. The LPS required by the addition or modification shall not be a simple addition to the LPS. The LPS must be considered a single entity and must comply with requirements of a single LPS upon completion. The LPS shall be inspected by a commercial, third-party inspector whose sole work is lightning protection, and shall be certified by this third-party inspector as compliant with AFI 32-1065 and NFPA 780, in that priority order. Projects calling for an LPS addition to an existing LPS project shall consider the configuration of the final LPS in the initial design. Projects of this type shall ensure the final LPS as a whole is compliant with AFI 32-1065 and NFPA 780, in that priority order. The same third-party inspector requirements shall apply.

f. Complete the “builder data inventory and assessment sheet” for newly installed assets, ensuring the bar code number is attached to the new equipment. Transfer bar codes from any removed equipment to the builder assessment ½ sheet form

g. Provide three (3) copies of O & M manuals and warranty letter

h. Period of Performance 60 days after award of contract

4. ADMINISTRATION:

Points of Contact (POC):

POC: Lenore Gerossie Phone Number. (781)225-2960 Alternate POC: Roland Hartz Phone Number. (781) 225-5924