MISC_5_Cable_Project_SOW.docx

DOCX document 676 KB Posted

Attached to
Hanscom Fiber Optic 5 Cables Federal contract opportunity
Solicitation number
FA283518R0061
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

SOW

View the file

Other files for this federal contract opportunity

Other files attached to Hanscom Fiber Optic 5 Cables, newest first.
File Type Posted
Fiber_Optic_QA__08202018_UPDATED_23_AUG.XLSX XLSX spreadsheet
Combined_Synopsis_Solicitation_-_Fiber_Optic_5_Cables_UPDATED_V3.docx DOCX document
Fiber_Optic_QA__08202018.XLSX XLSX spreadsheet
Combined_Synopsis_Solicitation_-_Fiber_Optic_5_Cables.docx DOCX document
Bid_Schedule_5_Cable_Projects2.xlsx XLSX spreadsheet
Combined_Synopsis_Solicitation_-_Fiber_Optic_5_Cables.docx DOCX document
WD_15-4047_(Rev.-8).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW)

For

Five Cable Projects

66th Air Base Group Communications and Information Division (66ABG/SC)

Hanscom AFB MA

Date: 26 JULY 2018

Prepared by:

66ABG/SC

Hanscom AFB, MA 01731

Overview:

The 66th Air Base Group Communications and Information Division (66ABG/SC) provides Hanscom AFB with network services to all the buildings. The 66ABG/SC division has five cable requirements:

1. Bldg. 1106 Conference Room upgrade: Additional drops to small conference rooms.

2. Bldg. 1107: Re-route Bldg. 1612 cable through basement to the consolidated fiber node in 1107. Contract will need to include trenching and penetration of conduits into the basement.

3. Bldg. 1435: Install plenum CAT 6 cable runs in Rm. 105 data center and install cable management trays below raised flooring and above network racks.

4. Bldg. 1646A basement: Install Fiber Optic management trays.

5. Bldg. 1646A Core Switch Tie Cable: 48 pair Single Mode and 24 pair Multimode tie cable from MPLS room to 1646A basement.

Location Material shall be delivered to:

66 AGB/SC

132 Grenier Street Bldg. 1814 Hanscom AFB, MA 01731 Attn: Dennis Menick x50022

Points of Contact

Project Manager:

Name: Dennis Menick Email: dennis.menick@us.af.mil Telephone: 781-225-0022

1107 Cable Engineer POC:

Name: Don Doolin Email:donald.doolin.ctr@us.af.mil Telephone: 781-225-6033

Contracting Officer:

Name: Jason Bergeron Email: jason.bergeron.3@us.af.mil Telephone: 781-225-0210

Optional Site Visit Site Visit to view working area will be held on Tuesday, August 14th at 10:00am EDT. Please contact the above Points of Contact Project Manager and Contracting Officer if you plan on attending. Site Visit information will be forwarded along once your response is received.

General Requirement

· Require, in advance, names of all technicians that will be working on this project, for Facility Security. All technicians must be US citizens and have proof of ID. All drivers shall have a valid driver license and proof of insurance in order to drive on Hanscom AFB. All documentation will be checked before a visitor’s pass will be issued.

· All work shall adhere to all applicable standards and codes.

· Working hours shall be 7:00 am to 3:00 pm (adjustments can be made), Monday-Friday. No work will be done on days the base is closed, to include, but not limited to Holiday and closure due to storms. Saturdays work shall be scheduled in advance with Project Manager.

· Any cable conveyance material the site has on hand (floor mounted stanchions, uni-strut, etc) may be utilized after coordinating with facilities manager.

Projected Implementation Dates: To be completed no later than 30 April 2019

BID Schedule:

CLIN 0001 B1106 Conference Room upgrade CLIN 0002 Re-route B1612 cable through basement to the consolidated fiber node in B1107 CLIN 0003 B1435 plenum CAT 6 and cable management trays below raised flooring and above network racks.

CLIN 0004 B1646A Install Fiber Optic management trays CLIN 0005 B1646A Core Switch Tie Cable

CLIN 0001 B1106 Conference Room upgrade Bldg. 1106 Conference Room upgrade: Additional drops to small conference rooms:

· Provide and install a total of One Hundred and Forty Eight (148) category 6 Plenum rated communications cabling to the various conference rooms, front/back lobby and office area.

· One Hundred and Eleven (111) will be designated as NIPR network class station cabling (yellow cable code).

· Thirty Seven (37) will be designated as GPN network class station cabling (Blue cable code)

· All station cabling on the end user TO’s will be category 6 plenum rated cable terminated onto standard RJ-45 Style Modular Keystone jacks color coded to the appropriated network (Blue/GPN Yellow/NIPR) and in either a flush 4/6/8 gang wall plate or a standard plastic work boxes dependent on the actual room/location (wall/table etc.).

· All station cabling will be installed as home runs originating from the customer’s existing networking closet/rack. J-Hooks will support the cabling every 4 to 5 feet or by using the existing supports, cable trays etc.

· All patch panels shall be mechanically printed. The cabling sequence for the Category 6 products will be 568B. All cables passing through firewalls/floors will be sleeved and fire stopped accordingly to the NFPA/NEC.

· The contractor will utilize the customer’s existing rack. All station cabling will be terminated onto a standard 48 port category 6 rated patch panel.

· A Certified Level Three tester (i.e. Fluke, Wire scope) shall be used for all copper testing and an OTDR for all fiber optic testing/certification.

· The Contractor will supply a copy of the marked up “as builds”, an electronic copy (CD) and printed copy of all test results in a three ring binder.

· All testing shall be in accordance of UFC DOD; BICSI EIA/TIA.

· All work comes with a minimum 1-Year guarantee.

· The Contractor will follow the guidelines of the Telecommunications Distribution Methods Manual for all of our installations. This installation shall comply with current EIA/TIA 568B and 569-C Specifications unless otherwise requested by the customer.

· Identification/Marking. The Contractor shall clearly mark all cables.

CLIN 0001 Suggested List of Materials (LOM) *List of Materials-Note; the following is a SUGGESTED ONLY LOM.

*The contractor will provide all EXPENDABLE/CONSUMABLE materials.

*PART #
ESTIMATED UNIT
DESCRIPTION
QUANTITY
M58281RB - 6 LAN™ Cat 6
26
6 LAN™ Cat 6 Premise Cable, Plenum, Blue, Yellow 1000 Ft Box
Each 1K
1-2111475-0
6
Cat6 RJ45 UTP Keystone Jack - Blue
25 pack
HD^=48
4
HD® 6 UTP Patch Panel, 48-Port
Each
CAT32HP
4
CADDY® CAT HP J Hook, Pregalvanized Steel, 2 in. Dia.
Box of 25
Consumables
1
Misc.
1

CLIN 0002 Re-route B1612 cable through basement to the consolidated fiber node in B1107 Bldg. 1107: Re-route Bldg. 1612 cable through basement to the consolidated fiber node in 1107. Contract will need to include penetrations / core holes sleeved fire stopped conduits from the basement.

· Provide Labor and materials to reroute both B1612 to B1107 fiber optic cables (12MM/24SM) from under the raised floor old Air Force Data Center (adjacent to B1107 New Data center) remove/pull back to basement easement below and reroute to back into the B1107 new data center.

· Contractor will be required to core and install four conduits (concrete encased/welded) with inner-duct from the outside hand hole into the basement of 1107.

· Contractor will be required to core two (2) additional holes (2-4” sleeved/fire stopped) through the data center’s concrete floor prior in order to gain access into the area. Holes should located on the south end of the communications room.

· Both fiber optic cables will be re-terminated. All fiber optic patch panels shall be rack mounted. Fiber Optic Patch Panels will not have a sliding tray or other moving parts which move the terminated fiber strands. All fiber optic LIU’s will be Corning product line CCH 2U or 4U, (high density preferable) all fiber optic connectors shall be Fusion Spliced LC style fiber optic pigtails/3 meter. TIA - 604 (FOCIS) 2-6.1.3.1 WBDG UFC.

· A Certified Level Three tester (i.e. Fluke, Wire scope) shall be used for all copper testing and an OTDR for all fiber optic testing/certification.

· The Contractor will supply a copy of the marked up “as builds”, an electronic copy (CD) and printed copy of all test results in a three ring binder.

· All testing shall be in accordance of UFC DOD; BICSI EIA/TIA.

· All work comes with a minimum 1-Year guarantee.

· The Contractor will follow the guidelines of the Telecommunications Distribution Methods Manual for all of our installations. This installation shall comply with current EIA/TIA 568B and 569-C Specifications unless otherwise requested by the customer.

· The contractor will be responsible for a mandatory site survey prior to the start of work.

CLIN 0002 Suggested List of Materials (LOM) *List of Materials-Note; the following is a SUGGESTED ONLY LOM.

*The contractor will provide all EXPENDABLE/CONSUMABLE materials.

*Part
Estimated Unit
Description
Quantity
CORNING | CCH-04U
2
Corning Rack Mount 2/4 RU 12 panel Fiber Optic Enclosure- preloaded panels/inserts High Density For LC / SM/UPC Fusion Spliced Pigtails
Each
#FOPT50S1-SC-12YL-3
3
12 Strand 9/125 Fiber Optic Pigtail 3m LC/UPC Single Mode (Each pkg. contains 12 strands)
Each

BERK-TEK |

10059632

CATEGORY 5E

350 MHz 1K

3
UTP Cable, Plenum, 24 AWG, Cat 5E, 25-Pair, 1000’ Length, Bare Copper Conductor, FEP Insulation, Flame Retardant Fluoropolymer Jacket, Gray, Indoor
Each/Roll
Miscellaneous Materials:
1
Consumables
Each

CLIN 0003 B1435 plenum CAT 6 and cable management trays below raised flooring and above network racks.

Bldg. 1435: Install plenum CAT 6 cable runs in Rm. 105 data center and install cable management trays below raised flooring and above network racks.

· Provide and install underfloor cable tray i.e. 10’x12”x2” with associated 90 degree bends, intersections and center divider. The underfloor cable tray will be set up in a manner to anchor/secure to existing floor pedestals of data center floor.

· All cable tray will be bonded to an appropriate ground per NEC, NFPA, EIA, TIA, and BICSI.

· Provide and install above networking racks/rows 10’x12”x2” cable tray with the associated 90’s, intersections, waterfalls and a center divider. The above network cable tray shall be anchored by means of threaded rod with hanger strut secured to the tray itself from the ceiling/iron. Elevations shall be determined upon a mandatory site survey/contractor walk thru.

CLIN 0003 Suggested List of Materials (LOM) *List of Materials-Note; the following is a SUGGESTED ONLY LOM.

*The contractor will provide all EXPENDABLE/CONSUMABLE materials.

*Part#
Estimated Unit
Description
Quantity
36811-x12
32
Basket Tray
Ea.
34737-502
128
Pedestal Bracket
Ea.
34734-X12
128
L Bracket
Ea.
34728-502
4
Carriage Bolts
pkg 50
34737-501
4
Clamp
pkg 50
34838-001
2
Ground Lug
pkg 50
34740-501
4
90 Splice Bar Kit
pkg 50
34739-501
4
Splice Bar
pkg 50
34728-501
6
Splice Washer
pkg 50
34834-501
4
Spring Splice Kit
pkg 50
34738-501
4
Standard Splice Kit
pkg 50
34746-501
16
Clamp Washer
pkg 50
34839-001
1
Cable Tray Cutting Tool
Ea.
34729-X12
50
Center Support Bracket
Ea.
34741-X01
25
Radius Drop
Ea.

CLIN 0004 B1646A Install Fiber Optic management trays Bldg. 1646A Basement: Install Fiber Optic management trays.

· Provide and install Fiber Runner Cable Management System in the basement of B1646 Data Center for the organization of both Single and Multimode fiber optic cabling.

CLIN 0004 Suggested List of Materials (LOM) *List of Materials-Note; the following is a SUGGESTED ONLY LOM.

*The contractor will provide all EXPENDABLE/CONSUMABLE materials.

*Item
Est. Quanity
FR4X4
54’ feet
FRSHC4
54’ feet
FRBC4X4 (COUPLER)
10 count
FRT4X4
2 count
FRTSC4
2 count
FREC4X4
2 count
FRRA4X4
2 count
FRRASC4
2 count
FRFWCSC4
2 count
FRVT4X4
8 count
FRLPR42 Low Profile Reducer
8
FOV452X2 Outside Vertical 45° Angle Fitting
8
FIV452X2 Inside Vertical 45° Standard Fitting
8
HC2 Fiber Runner® Hinged Cover
8
FZBA1.5X4 Adjustable “Z” Bracket (not visible)
32
H2X2 Fiber Runner® Hinged Slotted Channel
8
FBC2X2 Quik Lock™ Coupler
8
FLRB BRACKET CLAMP ONTO LADDER TRAY
20
FRSP Spill-Over
4
2. FBC2X2 Quik Lock™ Coupler
4
3. FIDT2X2 Transition to1.5'' ID Slit Corrugated Loom Tubing
4
CLT150F 1.5'' Slit Corrugated Loom Tubing
50"

CLIN 0005 B1646A Core Switch Tie Cable Bldg. 1646A Core Switch Tie Cable: 48 pair Single Mode and 24 pair Multimode tie cable from MPLS room to 1646A basement.

1. Provide and install one (1) Corning 48 pair (96) Strand Single Mode (SM-8.3/125um), with no factory splices armored indoor/outdoor rated fiber optic cable.

2. Provide and install one (1) Corning 24 pair (48) Strand Multi Mode (MM-62.5/125), with no factory splices armored indoor/outdoor rated fiber optic cable

3. The Fiber Optic Cable to be installed will be installed as a ‘Home Run’ between MPLS room to 1646A basement pathway system as one continuous backbone run/TIE cable without any splices to include bonding and grounding per NEC.

4. The fiber optic cable will be terminated at a predesignated rack location within each of the building’s corresponding MDF’ S (Exact Rack Location/elevation by Base Comm. TBD).The Fiber Optic Cable will be terminated onto a rack mounted, 19” Fiber Optic Termination Panel/LIU (FODP) (Light Interface Unit).

5. All fiber optic patch panels shall be rack mounted. Fiber Optic Patch Panels will not have a sliding tray or other moving parts which move the terminated fiber strands. All fiber optic LIU’s will be Corning product line (or equal) CCH 2U or 4U, (preloaded panels, high density LC) all fiber optic connectors shall be Fusion Spliced LC style fiber optic pigtails/3 meter. TIA – 604 (FOCIS) 2-6.1.3.1 WBDG UFC

6. All test results should be submitted for approval, prior to installation acceptance. All Single Mode attenuation tests will be performed at 1310 Nano Meters (Nm) and 1550 Nano Meters (Nm) wavelengths and in both directions. Multimode fiber is to be tested at 850 and 1300 nm, while in compliance of EIA/TIA-568C standards. The deliverables package should include a soft copy of the test results on a CD with the test results in .pdf format.

7. The contractor will be required to schedule and perform a site survey and route walk thru with SC personnel to confirm OSP underground duct spacing, pathway confirmation, racking locations, elevations.

CLIN 0005 Suggested List of Materials (LOM) *List of Materials-Note; the following is a SUGGESTED ONLY LOM.

*The contractor will provide all EXPENDABLE/CONSUMABLE materials.

* Part #
Estimate Unit
Quantity

AALTOS Loose Tube, Gel-Free, All-Dielectric Cable with Fast Access(TM) Technology, 96 fiber, 48 Pair - Single-mode (OS2)

(96-L-8.3/125), no factory splices

750
Ft
12 Strand 9/125 Fiber Optic Pigtail 3m LC/UPC Single Mode (Each pkg. contains 12 strands)
16
Pkg
12 Strand 62.5/125 Fiber Optic Pigtail 3m LC/UPC Multi-mode (Each pkg. contains 12 strands)
8
Pkg

ALTOS Loose Tube, Gel-Free, All-Dielectric Cable with Fast Access (TM) Technology, 48 fiber, 24 Pair - Single-mode (OS2)

750
Ft
Corning Rack Mount 4RU 12 panel Fiber Optic Enclosure- preloaded panels/inserts High Density For LC / SM/UPC Fusion Spliced Pigtails
2
Ea.
Miscellaneous Consumables
1
Ea.

Service Outages.

The Contractor shall be responsible for preventing any unscheduled (i.e. cutting or disabling any in-service cables or equipment.), Contractor-caused, interruptions of communications capabilities that are properly identified. The Contractor shall coordinate planned outages with the site POC at least 4 weeks in advance of the outage if the implementation necessitates disruption of service, (e.g., communications, electrical, or other utilities).

Active Circuits A phased communications plan developed by the contractor and government will be required to address the needs of building 1612 (CLIN 2). Government will provide assistance in scheduling and coordinating with base users.

Red-Line and As-Built Drawings.

The Contractor shall submit drawings showing the as-built configuration in format specified by base SCOI project manager. The Contractor shall provide As-Built Rack Elevation, Inside Cable Plant and Outside Cable Plant drawings and distribute in accordance with (CDRL A001).

Test and Acceptance/Installation Test Plan.

The Contractor shall provide a test plan as to how the system shall be tested to demonstrate to the Government that the system is fully operational and meets or exceeds the specified requirements and that the system is fully ready to be placed into service (CDRL A002). The Contractor shall test the system to demonstrate to the Government quality assurance evaluation of the system. These tests shall be accomplished prior to the system being placed into service.

· All Single Mode attenuation tests will be performed at 1310 Nano Meters (Nm) and 1550 Nano Meters (Nm) wavelengths and in both directions against EIA/TIA-568C standards.

· Test results should be submitted for approval, prior to installation acceptance.

· Confined space safety requires air testing data to be submitted to the base safety upon completion of the project (If applicable).

Acceptance/Installation Test Report.

The Contractor shall provide an installation test report of the results of the testing accomplished under the installation test plan (CDRL A003).

· These test results will be saved and printed for submission to the 66 ABG/SC or other customer designate.

· The deliverables package should include a hard copy of the test results and a CD with the test results in .pdf format.

Final Acceptance.

· The Contractor shall schedule a final project walk-through with the Base POC.

· This should be scheduled two calendar days prior to acceptance.

Data Deliverables

· The Government reserves the right to review all data deliverables for a period of 10 working days prior to acceptance. No data deliverable will be assumed to be acceptable by the Government until the 10 day period has passed, unless the Government explicitly states otherwise.

CDRL

Number

Deliverable Title
Number / Format
Due Date
A001
As-Built Rack Elevation, Inside Cable Plant and Outside Cable Plant drawings
Standard Distribution
Acceptance
A002
Test Plan
Standard Distribution
Prior to system put into service
A003
Installation Test Report
Standard Distribution
Prior to system put into service

10 | Page image1.emf

File details come from the government source that posted it.