- Replace Double Doors B1305
- Solicitation number
- FA2835-18-R-0010
About this file
This project intend to replace double doors on B1305.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1_FA283518R0010.pdf | ||
| 1305-picture.pdf | ||
| 1305-1_Drawing.pdf | ||
| 1305-2_Drawing.pdf | ||
| 1305-3_Drawing.pdf | ||
| 6_22_18_DBA.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Replace Two Sets Of Exterior Double Doors
Location Building: 1305
By: Patrick LeBorgne
WORK ORDER NUMBER: 67198
DATED: 30 April 2018
1. GENERAL INFORMATION:
This project is intended to replace two sets of exterior double doors in accordance with all applicable National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the
Commonwealth of Massachusetts Building Code and Massachusetts General Law requirements, Unified Facilities Criteria (UFC) state and federal codes, base standards and manufacturer’s instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply. Effective immediately: Due to safety concerns the use of manhole fixed ladders on Hanscom AFB is prohibited for the purpose of entry and egress is prohibited. An alternative means is authorized (i.e. appropriate portable ladder/personnel lowering device).
2. SCOPE:
Prior to starting any work, all work shall be coordinated with Base Civil Engineering (781)
225-2997 and SSgt Wright (781) 225-5377 from Security Forces Electronic Security
Systems NCOIC to coordinate the installation of wiring and magnetic locking devices by
Advantor during the installation of the doors.
Doors must meet all Unified Facilities Criteria (UFC) DOD Minimum Antiterrorism
Standards For Buildings and DOD Minimum Force Protection Standards For Buildings.
Doors must meet all UFC-3-600-01 and NFPA standards.
Contractor must provide submittals to Base Civil Engineering for approval.
Please refer to drawings provided.
Field measurements are required.
Contractor shall provide As-Built drawings.
Work shall include everything required to complete the job and shall include but will not be limited to:
o Removing and properly disposing of two sets of double doors, including door frames, transom glass above the two sets of double doors, doors with glass, hinges, panic hardware, exterior door handles, door closers, thresholds, and all associated door hardware. The existing double doors do not have a removable center mullion with strikes for rim panic hardware.
o Installing two new sets of double doors. The two new sets of double doors shall include: door frames, transom glass above the two sets of double doors, doors with glass, hinges, rim panic hardware, exterior door handles, removable center mullion with strikes for rim panic hardware, door closers, thresholds, and all necessary door hardware.
The overall outside door frame measurement for each set of double doors including the transom glass is approximately 76” wide by 108” high, the transom glass above the two sets of double doors measures approximately
72” wide by 18” high and has 1” insulated tempered glass, the existing door openings inside the door frame measure approximately 72” wide by 84” high.
The two new sets of double doors shall have:
o Primed and painted metal frames with a jamb width of approximately 10-3/4” (paint shall be bronze in color).
o Transom glass above the two sets of double doors which are approximately 72” wide by 18” high with 1” insulated tempered glass and fragmentation film.
o Doors made of bronze anodized aluminum matching the front entrance doors.
o Door glass matching the front entrance door glass (each door has door glass approximately 26” wide by 36-1/2” high with 1” insulated tempered glass and a fragmentation film).
o Continuous door hinges matching the hinges on the main entrance doors or they shall be an approved equal.
o Rim panic hardware that can be dogged, matching the rim panic hardware on the main entrance doors or they shall be an approved equal.
o Exterior door handles matching the exterior door handles on the main entrance doors or they shall be an approved equal.
o Removable mullions with strikes for panic hardware with rim devices matching the removable mullion with strikes for panic hardware with rim devices on the main entrance doors or they shall be an approved equal.
o Door closers matching the door closers on the main entrance doors or they shall be an approved equal.
o Thresholds matching the thresholds on the main entrance doors or they shall be an approved equal.
o Cylindrical keyed bypass locks that accept an interchangeable core
(small format 7 pin) for the primary active door. The two new sets of double doors shall be right hand reverse active.
o Sealing the two new sets of double doors to the building, with an approved sealant, ensuring that the two new sets of double doors are weather tight.
3. GENERAL REQUIREMENTS:
Work includes, but is not limited to the following:
a. Provide resolutions of any technical problems that arise during the construction.
b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.
c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.
d. The Contractor is solely responsible for compliance with the Occupational Safety and
Health Act of 1974 (OSHA) and the protection of their employees and all sub-contractor employees. In performing work under this contract on a Government installation, the contractor shall report any accidents involving Air Force property/equipment damage, or contractor personnel injuries occurring on the job or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the contracting officer within five days.
e. Any modifications and addition on a facility that contains Lightning Protections System
(LPS) This includes paint projects, roofing projects, projects requiring roof penetrations, installation of new HVAC or other metallic equipment, antenna installation, or other work.
Additions and modifications to the facility envelope require re-evaluation of the LPS for the completed facility as a whole. The LPS required by the addition or modification shall not be a simple addition to the LPS. The LPS must be considered a single entity and must comply with requirements of a single LPS upon completion. The LPS shall be inspected by a commercial, third-party inspector whose sole work is lightning protection, and shall be certified by this third-party inspector as compliant with AFI 32-1065 and NFPA 780, in that priority order. Projects calling for an LPS addition to an existing LPS project shall consider the configuration of the final LPS in the initial design. Projects of this type shall ensure the final LPS as a whole is compliant with AFI 32-1065 and NFPA 780, in that priority order. The same third-party inspector requirements shall apply.
f. Complete the “builder data inventory and assessment sheet” for newly installed assets, ensuring the bar code number is attached to the new equipment. Transfer bar codes from any removed equipment to the builder assessment ½ sheet form
g. Provide three (3) copies of O & M manuals and warranty letter
h. Period of Performance 90 days after award of contract
4. ADMINISTRATION:
Points of Contact (POC):
POC: Patrick LeBorgne Phone Number. (781) 225-2997
Alternate POC: Bill Neice Phone Number. (781) 225-6157