Nat_Gas_Line_Leak_Detec_Survey_contract_AWARD_doc.pdf

PDF 482 KB Posted

Attached to
HAFB Natural Gas Line Leak Detection Survery Contract AWARD Document
Solicitation number
FA2835-18-Q-0056
Issued by

About this file

Natural Gas Line Leak Detection Survey Contract AWARD Document

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

X

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.585-752-5466

FA28359. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

FA283518P0056 19-Sep-2018

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

F2B3AQ8149A014

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

CHRISTIAN SALINAS / CONTRACTING OFFICER

See Schedule $5,000.00

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS: SEE SCHEDULE

.19-Sep-2018 YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN FA2835-18-P-0056

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE 3BRZ0 FACILITY

OFFEROR CODE

AFLCMC/PZI - FA2835

ATTN: TERRI R. RUTKIEWICZ

16 EGLIN STREET (BLDG 1604)

HANSCOM AIR FORCE BASE MA 01731

PREDICTIVE TECHNOLOGIES INC

WILLIAM G MASLACH

61 WOOD CREEK DR

PITTSFORD NY 14534-4414

DFAS-DY/CVFD - 503000

PO BOX 369024

COLUMBUS OH 43218-9024

18a. PAYMENT WILL BE MADE BY CODE F03000

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE

SEE ITEM 9

15. DELIVER TO CODE F2B3AQ 16. ADMINISTERED BY

Net 30 Days

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFP

66 ABG/CE-F2B3AQ

ROLAND HARTZ

120 GRENIER ST. BLDG 1810

HANSCOM AFB MA 01731

FAX:

TEL: 781-225-0159 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$11,000,000

NAICS:

561990

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

X

EMAIL: christian.salinas@us.af.mil

781-225-0198TEL:

31c. DATE SIGNED

19-Sep-2018

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF27

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

FA283518P0056

Section SF 1449 - CONTINUATION SHEET

PR COMPLETE

PR F2B3AQ8149A014 is complete.

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK

STATEMENT

FOR

Natural Gas Line Leak Detection

Survey

PREPARED BY:

66 CE/CEOES

7 June 2018

Natural Gas Line Leak Detection Survey

SECTION 1

1. Description of Services

1.1. Scope: The Contractor shall provide all labor, tools, equipment, hoses, gauges, test equipment, hearing protection, eye protection including prescription safety glasses, materials, supplies and parts, transportation and other incidentals necessary to travel to Hanscom AFB, MA, to perform a Gas Leak Detection Survey on approximately 11,502 LF of natural gas distribution system – See base map – Attachment 1, Natural Gas Distribution System for this survey shown in Yellow. Not included as part of this survey are: Gas distribution system in the Housing Area (shown in Green on map, Attachment 1), National Grid distribution (shown in Purple on map, Attachment 1) and the Kinder-Morgan, 24 inch Steel gas main (shown in Red on map, Attachment 1). The Contractor shall identify, report and record all leak locations and perform work in a manner that will comply with Federal, State and local regulations for leak detection surveys and reporting services.

1.2. Requested Service: The Contractor shall conduct the following: Provide a leak detection survey for the underground natural gas distribution system. Work covers all mains, laterals, valves & valve boxes, meters, risers and regulators through the use of mobile electronic gas leak detection equipment.

1.2.1. Schedules/Notifications: All work mentioned in this PWS will be accomplished between April 1 and September 1(work will not be permitted during periods where frost is present in the soil). The Contractor shall provide the Government 30 days advanced notice prior to start of the leak detection survey. The Contractor shall prepare a schedule of inspection/survey dates. The schedule shall divide the work to be done into survey sections/plots that allow for daily completions. There will be a kick off meeting to review scope and schedule prior to the start of work.

1.2.2. Survey Procedures: Contractor personnel shall follow the procedures as set forth in Title 49 Code of Federal Regulations (CFR) Part 192: Minimum Federal Safety Standards with Amendments, current edition; AFI 32-1067 and all other applicable federal and state regulations.

1.2.3. The Contractor shall conduct a gas leak detection survey specifically to locate, classify and report any and all leaks present in the distribution system and related service lines and apparatus. Tests shall be made with mobile and/or hand held detection and recording devices that are designed and approved for natural gas leakage control surveys. All precautions necessary to prevent damage to equipment, systems and property shall be taken. There shall be no smoking, open flame, or other ignition source while conducting the survey; except that leak detection equipment such as Combustible Gas Indicator (CGI) and Flame Ionization (FI) instruments may be used by fully trained/certified technicians/operators. Review condition of bonding ground as supply enters facility.

1.2.4. The Contractor shall physically mark the location of all leaks at the time the leak is identified and record the GPS coordinates. In grass areas the Contractor shall drive a 24” wooden stake, painted yellow, at the location of the leak. On hard surfaces, the Contractor shall measure and show with measurements from at least 3 fixed objects the exact location of the leak. The Contractor shall also provide dimensions to the spread of the leakage. The gas concentration percentage around the area of spread shall also be shown and indicated for all identified areas.

1.2.5. The Contractor shall classify all leaks detected as to percentage of concentration, spread and potential hazard based on the CGI or other approved detection equipment.

1.2.6. The Contractor shall grade detected leaks per Attachment 2, SRM Rating Definitions.

1.2.7 In the event where specific parts of the gas distribution system (valves, gas lines, meters, regulators, etc.) cannot be located, the contractor shall contact the Utilities Shop Supervisor at 781- 656-3803, for assistance in locating. If the Utilities Shop is able to locate the item, it shall be included in the survey. Annotated reports/lists indicating an item could not be located will only be acceptable if the Utility Shop concurs.

1.3. Reporting

1.3.1. Report all Amber and Red grade leaks upon detection IMMEDIATELY to the 66 CES/CEOIU, Utilities Shop Supervisor at (781) 225-6057 or (781) 656-3803. At the end of each week’s survey, submit preliminary survey sheets to the Contracting Officer Representative (COR).

1.3.2. Final Reports. The Contractor shall submit a Final Report of the gas leak detection survey to the (COR) within thirty (30) calendar days after completion of the survey/site tour and shall be contained in a 3 ring binder. Final Report shall be in one hard copy and on a writeable CD in the latest version of MSWord, Excel, or both. See par. 1.3.2.3. for further drawing submittal requirements, to be included with Final Report.

1.3.2.1. Provide a narrative report that outlines the process, procedure, and equipment used to perform the survey. As an appendix to the report include calibration certificates for all equipment used to detect leaks. The Final Report shall contain a typewritten listing indicating the total linear footage of mains and service lines surveyed, the total number of valves, meters and regulators/risers surveyed. See Attachment 3, Gas Valve Listing 2017, and Attachment 4, Gas Meter Listing 2017 for reference.

1.3.2.2. Provide a typewritten listing of all leaks encountered. Leaks shall be listed in the order of repair priority with the highest given to the gas concentration level. Each leak shall be assigned a number and identifiable with the same number on the report, gas distribution maps/drawings and survey sheets. The list shall identify location with GPS coordinates and leak classification. Provide a summary table that lists the condition of the regulators, meters, and bonding grounds using the Attachment #2, SRM Rating Definitions. Provide a written narrative outlining the rational for any ratings of “Amber” or “Red”. Provide a recommended replacement year for all regulators based on Federal Gas Code for small system operators.

1.3.2.3. The Contractor shall provide all Control Field Survey Sheets and Gas Line Distribution Drawings containing all pertinent information. Submit one hard copy and a writeable CD of the drawing. Base drawing provided in pdf as Attachment #1 Natural Gas Distribution System. All leaks found by this survey shall be accurately located (on the X,Y Coordinate grid) and identified on the Attachment #1 drawing; submitted as part of the Final Report package.

1.3.2.5. Provide summary of all sustainment and/or maintenance issues discovered during the survey and provide suggested improvements and/or repairs to bring the system up to optimal operating condition.

1.3.3. Provide meeting minutes for all project meetings within 72-hours of meeting adjournment.

1.4. Quality Assurance: According to the contract’s inspection clause, the Government will evaluate the Contractor’s performance under this contract. The COR is a representative of the Contracting Officer (CO) and will participate in the administration of this contract. Any matter concerning a change to the scope, prices, terms or conditions of this contract shall be referred to the CO. All services to be performed by the Contractor shall be subject to review by the CO or COR. The Contractor shall provide an answer to a submitted Corrective Action Report (CAR) and Customer Complaint Form from the COR within one (1) working day from receipt. The Contractor shall provide written response addressing the root cause, corrective action and preventive actions (s).

1.5. Continuation of Essential Services during Crisis: This requirement has been determined not to be essential, and does not require continued support during a crisis as defined in DFARS Clause 252.237-7023.

1.6. Hours of Operation: The Contractor shall perform work Monday through Friday under this contract during the following hours: 07:00 a.m. until 3:30 p.m., excluding Federal Holidays. Work required to be performed outside of these hours shall only be done after approval from the Contracting Officer.

1.7.1 Federal Holidays:

New Year’s Day - 1 January Martin Luther King Day - 3rd Monday in January Washington’s Birthday - 3rd Monday in February Memorial Day - last Monday in May Independence Day - 4 July

Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December

If these holidays fall on Saturday, the preceding Friday shall be observed. If these holidays fall on Sunday, the following Monday shall be observed. If a holiday falls on a scheduled service day, the Contractor shall be responsible for rescheduling services for the first day followingthe holiday observance.

1.8. Contractor Personnel: The Contractor shall not employ persons on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security and general well-being or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest, nor shall the Contractor employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the Contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies contained in AFI 64-106, Air Force Industrial Labor Relations Activities. The Contractor shall be prohibited from employing off-duty COR’s who are surveilling any contracts/subcontracts awarded to the Contractor. All contract employees depending on particular condition, occasion or place, or job assignment shall require professional, suitable attire. All Contractor employees shall conduct themselves in a professional, courteous manner. The selection, assignment, reassignment, transfer, supervision, management, and control of Contractor employees in performance of this PWS shall be the responsibility and prerogative of the contractor; however, the Contractor shall comply with the requirements set forth in this PWS and Hanscom AFB regulations concerning conduct of employees as referenced herein. The Contractor shall employ and maintain a technically trained and experienced work force.

1.9. Environmental Protection Health and Safety on a Government Installation:

1.9.1. In performing work under this contract on a Government installation, the contractor shall comply with federal, state and local regulations regarding environmental, occupational safety and health and the specific health and safety requirements established by this contract. The contractor shall notify the COR of any injuries that occur to contractor personnel while on the installation. The contractor shall notify the COR of damage to government property or equipment during the execution of the contract.

1.9.2. The contractor shall be knowledgeable of all applicable federal, state and local laws, regulations and requirements regarding environmental protection and occupational safety and health.

1.10. Spills: Upon occurrence of any spills that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the contractor shall use a base telephone to receive help from Hanscom AFB 911. If using a cell phone, Contractor shall request Hanscom AFB 911. The Contractor shall report all environmental violations to the COR. The Contractor shall submit a typed or written report about the incident within four (4) clock hours of the occurrence of said incident. The Contractor shall provide five (5) copies of the written report. The Contractor shall provide one copy to the CO, two copies to the COR, a copy for the Unit Environment Coordinator (UEC) and a copy for record.

The format of the report shall be left up to the Contractor, but the report shall contain the following information.

1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and the rate of discharge 6.) Any damages or injuries involved 7.) Extent of the area impacted 8.) Potential hazards 9.) Action taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment) and whether 911 was called and which agencies responded.

1.11. Housekeeping: The Contractor shall keep the work areas clean and neat in accordance with Industry Standards, Occupational, Safety and Health Administration (OSHA), fire and safety standards and this PWS.

1.12. Privately Owned Motor Vehicles (POV): Contractor personnel shall comply with the directives pertaining to operation of POVs on Hanscom AFB per AFI 31-204 (in its entirety), Motor Vehicle Traffic supervision.

1.13. Visitor Pass: The Contractor shall comply with requirement and procedures IAW FAR 5353.242-9000, Contractor Access to Air Force Installations. Prior to coming to Hanscom AFB to perform any work, Contractor shall contact the Civil Engineering Government Representative to coordinate access to the base as well as to the building (s) where the work shall be performed.

A list of the names of the workers shall be required to gain access, and passes shall be distributed at the visitor’s building at Vandenberg Gate. Workers shall have proof of identification as well as a valid driver’s license. If bringing a vehicle on base, the Contractor will need proof of registration and insurance of that vehicle. Contractor employees must have identification that readily identifies them as contractors. During the course of the contract, certain areas/sites may be restricted or closed to Contractor personnel. The Contractor shall comply with all requirements for entry. In addition, unscheduled gate closures may occur at any time and personnel entering or exiting the installation may experience delays.

In order to maintain accountability once gaining access onto Hanscom AFB, Contractor shall immediately sign the logs at Building 1810, indicating time and date of arrival. Before departure, Contractor shall again sign the logs indicating the departure time, as well as the work performed and the buildings worked in. A copy of a signed work receipt on Contractor’s letterhead detailing work performed shall also be given to the Civil Engineering Government Representative or left in the log book prior to departure

1.14. Foreign National(s): The Contractor shall notify the COR before sending a Foreign National representative to perform services. Special rules apply for foreign national(s) visiting a US Government facility.

1.15. Health and Safety on Government Installation: In performing work under this contract on a Government installation, the Contractor shall comply with federal, state and local regulations regarding occupational safety and health and the specific health and safety requirements established by this contract. The Contractor shall notify the COR of any injuries that occur to Contractor personnel while on the installation. The Contractor shall notify the COR of damage to Government property or equipment during the execution of the contract.

1.16. Emergency Procedures: Contractor employees shall follow the direction of Government employees in regards to emergency evacuation procedures, i.e. fire, tornado, active shooter and bomb threats. It is the Contractors’ responsibility to account for their employees following an emergency evacuation. Contractor personnel shall participate with government personnel in all fire and tornado drills, and at no additional cost to the government.

1.17. Partnering Agreement: The Contracting Officer may require a partnering agreement between the Government and the Contractor to ensure joint cooperation and a sound partnership of all parties involved in the execution of this contract. Partnering is the creation of a Government- Contractor relationship that promotes achievement of mutually beneficial goals. It involves an agreement in principle to share the risks involved in completing the project and to establish and promote a nurturing partnership environment. Representatives from each organization are encouraged to participate in developing the partnering agreement. Suggested representation is the Civil Engineer Manager, the Government Inspector, the Government Contract Administrator, the Contractor’s manager and the Contractor’s quality control person. All costs for the partnership agreement should be shared equally between the Government and Contractor. This group is responsible for developing a formal partnering agreement that should be signed by all parties involved. The agreement should contain as a minimum: specific goals to be reached and a list of objectives to reach the goals, a set of metrics to evaluate the objectives, a frequency for meetings to review the metrics, and a statement of cooperation to execute the terms of the agreement.

SECTION 2

2. Performance Assessment

The Contractor shall be aware that the absence of any contract requirement from the Service Summary does not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Contractor shall ensure the following service summary requirements are accomplished.

2.1.

Performance Objective

PWS

Para.

Performance Threshold

Method of Assessment

SS 1: Provide Gas Distribution System Leak Detection Survey.

1.2 95% Compliance Visual inspection

SS 2: Submit reports to COR within 30 days of completion of survey.

1.3.2 95% Compliance Review upon receipt.

SECTION 3

3. Government Furnished Property and Services

3.1. Government Furnished Property (GFP): Government Furnished Property is not applicable to the in the performance of this contract.

3.2. Reserved.

3.3. Government Furnished Services: Government Furnished Services are applicable during the performance of this contract.

3.3.1. Security Police: The Government will provide general on-base Security Forces service.

The Security Forces’ telephone number is 911 for emergencies, for crime in progress 781-225- 5613 and 781-225-5613 for non-emergency calls.

3.3.2. Fire and Emergency Services: The Government will provide general on-base fire protection services. The Contractor shall comply with fire prevention rules and regulations enforced by the Hanscom AFB Fire Prevention Branch. Call 911 for emergencies. For routine fire prevention matters and/or calls to dispatch, call 781-225-3330.

Note: Calling 911 from a cell phone will be received by off base emergency 911 systems, causing a delay in response time by emergency personnel. When possible use a base telephone to receive on base help.

3.3.3. Utilities: The Government will furnish utility services. These utilities include natural gas, electricity, water and sewer for the sole purpose of accomplishing this contract. If the Contractor requires additional utility services, it shall be the Contractor’s responsibility to provide such services. Contractor shall use due care and diligence in efforts to conserve utilities in order to reduce utility costs.

3.3.4. Refuse Collection: The Government will provide refuse collection services limited to the extent provided in the Base Refuse Collection Contract for Government provided facilities. The Government will only allow non-hazardous refuse to be emptied into the nearest authorized refuse dumpster for trash collection. Government dumpsters shall not be used for collection of Contractor debris.

3.3.5. Workspace: The Government will provide adequate workspace around the equipment area.

4. Attachments

Attachment 1: Natural Gas Distribution System Attachment 2: SRM Rating Definitions Attachment 3: HAFB Gas Valve Listing for 2017 Attachment 4: HAFB Gas Meter Listing for 2017

Hanscom Air Force Base (HAFB) Gas Valve Listing Updated 2017

Building Size Location

1548 TB 1" Furnace Burner #1

1548 TB 1" Furnace Burner #2

1548 TB 1" Furnace Burner #3

1548 Gym 6" Main gas line to mech rm

1548 Gym 2" Boiler #1 Mech Rm

1548 Gym 2" Boiler #2 Mech Rm

1548 Gym 1 1/4" Furnace in mech rm

1548 Gym 1 1/2" RTU #8

1548 Gym 2" RTU #1

1548 Gym 1 1/2" RTU #5

1548 Gym 2" RTU #4

1548 Gym 2" RTU #6

1548 Gym 2" RTU #9

1548 Gym 2" RTU #2

1548 Gym 2" RTU #10

1548 Gym 1 1/2" RTU #7

1548 Gym 2" RTU #3

1548 Gym 2" Dryer feed in laundry room

1548 Gym 1" Dryer in laundry room

1548 Gym 1 1/4" Furnace in office storage room

1548 Gym 1" Modine in laundry room

1550 3/4" Furnace mech rm

1550 3/4" Water heater feed in mech rm

1550 3/4" Water heater #1 mech rm

1550 3/4" Water heater #2 mech rm

1550 2" Pool heater mech rm

1550 2" Outside on main

1550 3" Outside on Poolpak

1428 3/4" Furnace in the closet

1993 1 1/2" Meter bypass mech rm

1993 1 1/2" Before meter mech rm

1993 1 1/2" After meter mech rm

1993 1" Water heater mech rm

1993 1" Boiler mech rm

1999 1 1/2" Outside on main

1999 2" Furnace outside

1999 1" Water heater mech rm

1999 3/4" Boiler mech rm

1999 3/4" Behind stove in kitchen

1999 1" Feed to kitchen mech room

1709 BX 1/2" RTU #1

1709 BX 1/2" RTU #2

1709 BX 1/2" RTU #3

1709 BX 1/2" RTU #4

1709 BX 1/2" RTU #5

1709 BX 1/2" RTU #6

1709 BX 1/2" RTU #7

1709 BX 1/2" RTU #8

1709 BX 1/2" RTU #9

1709 BX 1/2" RTU #10

1709 BX 1/2" RTU #11

1709 BX 1/2" RTU #12

1709 BX 1/2" RTU #13

1709 BX 1/2" RTU #14

1709 BX 1/2" RTU #15

1709 BX 1/2" RTU #16

1709 BX 1/2" RTU #17

1709 BX 1/2" RTU #18

1709 BX 1/2" RTU #19

1709 BX 1/2" RTU #20

1709 BX 1/2" Infrared heater #1 loading dock

1709 BX 1/2" Infrared heater #2 loading dock

1709 BX 1/2" Infrared heater #3 loading dock

1709 BX 3/4" Water heater janitors closet near bathrooms

1709 BX 3/4" Water heater janitors closet Burger King

1709 BX 3/4" Behind stove in Burger King kitchen

1994 3" Gas meter bypass Mech rm

1994 3" Before gas meter mech rm

1994 3" After gas meter mech rm

1994 3/4" Boiler #3 Burner #1

1994 3/4" Boiler #3 Burner #2

1994 3/4" Boiler #2 Burner #1

1994 3/4" Boiler #2 Burner #2

1994 3/4" Boiler #1 Burner #1

1994 3/4" Boiler #1 Burner #2

1994 3/4" Water heater #1

1994 3/4" Water heater #2

1994 3/4" Kitchen feed Mech rm

1604 1" Outside Generator

1604 3" Boiler #2 Mech rm

1604 3" Boiler #1 Mech rm

1604 1" Boiler #1 Mech rm

1604 1" Boiler #2 Mech rm

1604 3" RTU #1

1604 3" RTU #2

1201 1/2" Pressure guage on the main

1201 1/2" Pressure guage on the main

1201 6" Before rockwell meter

1201 4" Between boilers 1 & 2

1201 3" Boiler #1 feed

1201 4" Boiler #1 feed

1201 1" Boiler #1 Pilot feed

1201 3/4" Boiler #1 Pilot #1

1201 3/4" Boiler #1 Pilot #2

1201 2" Boiler #1 Burner #1

1201 2" Boiler #1 Burner #2

1201 3" Boiler #2 feed

1201 4" Boiler #2 feed

1201 1" Boiler #2 pilot feed

1201 3/4" Boiler #2 pilot #1

1201 3/4" Boiler #2 pilot #2

1201 2" Boiler #2 Burner #1

1201 2" Boiler #2 Burner #2

1201 3" Boiler #3 feed

1201 4" Boiler #3 feed

1201 1" Boiler #3 pilot feed

1201 3/4" Boiler #3 pilot #1

1201 3/4" Boiler #3 pilot #2

1201 2" Boiler #3 burner #1

1201 2" Boiler #3 burner #2

1201 3" Boiler #4 feed

1201 4" Boiler #4 feed

1201 1" Boiler #4 pilot feed

1201 3/4" Boiler #4 pilot #1

1201 3/4" Boiler #4 pilot #2

1201 2" Boiler #4 burner #1

1201 2" Boiler #4 burner #2

1201 1 1/2" Gas chiller feed aside boiler #4

1201 2" Gas chiller feed

1201 2" Gas chiller feed

1445 1/2" Reznor heater #1

1445 1/2" Reznor heater #2

1445 1/2" Reznor heater #3

1445 1/2" Reznor heater #4

1444 1 1/4" Furnace mech rm

1444 1/2" Water heater mech rm

1425 2" before RTU

1425 2" RTU

1425 2" Mech rm feeds pizza oven, laundry house

1425 2" Mech rm feeds pizza oven, laundry house

1425 1 1/2" Mech rm feed pizza oven

1425 1 1/2" Mech rm feed kitchen ovens

1425 3/4" Kitchen steam cooker

1425 3/4" Kitchen grill

1425 3/4" Kitchen frymaster

1425 3/4" Kitchen stove and broiler

1425 3/4" Kitchen 6 burner stove

1425 1" Kitchen ovens

1425 1" Kitchen ovens

1425 1" Kitchen dual frymaster

1425 3/4" Kitchen pizza oven

1425 1/2" Kitchen pizza oven

1603 4" West side of the Building

Hanscom Air Force Base (HAFB) Gas Meter Listing for 2017

BLDG# BUILDING METER NO MAKE / MODEL METER LOCATED

PREVIOUS

READING

CURRENT

READING

MONTHLY

USAGE

MULTIPLIER COMMENTS

DATE

READ

PRIORITY REIM

1201 Steam Plant 812618 Rockwell MK‐II NW Corner near Smoke

Stack #1 X1000 2 N

1201 Steam Plant 9903242 Mercor Mini NW Corner near Smoke

Stack #1 X10000 1 Y

1425 Officers Club 0441501016136 Romet LTD 3000 Handicap Ramp X100 2 N

1444 Dog Kennel 5695652 Elster AC‐250 Left front side bldg X100 2 N

1445 SF Storage Bld 5695658 Elster AC‐250 Right side of bldg X100 2 N

1505 Mass National Guard D0006247 Itron Datus FM3 Back of Bldg X100 1 Y

1548 Tennis Court 47471 Romet RM 5000 Pad Left of Bubble X100 Deduct from LSC 2 N

1548 Fitness center 63902 Romet RM2000‐TC Front of building X100 Deduct from LSC 2 N

1550 Swimming Pool 327289 Roots 3M‐175 Outside Mech Rm X100 Deduct from MFH 2 N

1603 Base Chapel 154949 Romet Ltd RM 3000 SW Corner of Bldg at

Mech Rm x100 New Meter 2 N

1604 CONS/LGCA 905827 Outside Mech Rm X100 1 Y

1610 Credit Union B9002626 Roots Next to Gen set X100 1 Y

1709A Commissary 9012764 Roots Loading Dock X100 1 Y

1709B BX 8372481 Roots Loading Dock X100 1 Y

1900 Main Clinic 9548485 Roots B9002587904 Mech Room No Register est by C. Phan 1 Y

1993 Youth Center 097050 Roots 1.5M‐175 Mech Room X100 Deduct from LSC 2 N

1994 Child Care Center LS 4134 Romet 3000 Mech Room X100 Deduct from MFH 2 N

1996 School Kitchen 521504145 GE/Dresser ES3 index Mechanical Rm New Meter 1 Y

1996 School 1543686 Roots/5M17‐5 Mechanical Rm New Meter 1 Y

1999 After School Care D0005605 Itron Datus III In fenced Area X100 Deduct from MFH 2 N

MFH Military Family Housing 16120680 Sensus T‐30 Marrett St X100 1 Y

MFH Military Family Housing D0006472 Itron Datus FM3 Marrett St X100 1 Y

ADDITIONAL COMMENTS:

ALL GAS METERS READ IN CUBIC FEET Meters owned by Nat'l Grid

MULTIPLIERS HAVE BEEN INCLUDED IN READINGS

BUILDINGS NOT READ

1140 MIT 9523033 Roots 1.5M‐175 Mech Room No Register System is Off

LSC Lincoln School D0005427 Itron Datus FM2 Across From Bldg 1999 X100 Deduct from MFH Not working

1998 Community Center 5290955 Rockwell R175 Behind Building BELONGS TO M.F.H.

Removed for service

DO NOT READ

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot $5,000.00 $5,000.00 Natural Gas Distribution System

FFP

Yearly Natural Gas Line Leak Detection Survey and Final Report FOB: Destination

PURCHASE REQUEST NUMBER: F2B3AQ8149A014

NET AMT $5,000.00

ACRN AA

CIN: F2B3AQ8149A0140000AA

$5,000.00

1001 1 Lot $5,000.00 $5,000.00 OPTION Natural Gas Distribution System

FFP

Yearly Natural Gas Line Leak Detection Survey and Final Report

2001 1 Lot $5,000.00 $5,000.00 OPTION Natural Gas Distribution System

FFP

3001 1 Lot $5,000.00 $5,000.00 OPTION Natural Gas Distribution System

FFP

4001 1 Lot $5,000.00 $5,000.00 OPTION Natural Gas Distribution System

FFP

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government 4001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 30-SEP-2018 TO

29-SEP-2019

N/A 66 ABG/CE-F2B3AQ

ROLAND HARTZ

120 GRENIER ST. BLDG 1810

HANSCOM AFB MA 01731

781-225-2934

F2B3AQ

1001 POP 30-SEP-2019 TO

29-SEP-2020

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 30-SEP-2020 TO

29-SEP-2021

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 30-SEP-2021 TO

29-SEP-2022

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 30-SEP-2022 TO

29-SEP-2023

N/A (SAME AS PREVIOUS LOCATION)

ACCOUNTING AND APPROPRIATION DATA

AA: 5783400 308 18JD 374436 010000 53313 22178F 503000 F03000 WO:A11868

AMOUNT: $5,000.00

ACRN CLIN/SLIN CIN AMOUNT

AA 0001 F2B3AQ8149A0140000AA $5,000.00

CLAUSES INCORPORATED BY REFERENCE

52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2016

52.204-13 System for Award Management Maintenance OCT 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.209-5 Certification Regarding Responsibility Matters OCT 2015 52.212-4 Contract Terms and Conditions--Commercial Items JAN 2017 52.219-14 Limitations On Subcontracting JAN 2017 52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 52.232-1 Payments APR 1984 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.232-40 Providing Accelerated Payments to Small Business Subcontractors

DEC 2013

52.233-3 Protest After Award AUG 1996 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

OCT 2016

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7007 Limitation Of Government's Obligation APR 2014 252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

CLAUSES INCORPORATED BY FULL TEXT

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS—COMMERCIAL ITEMS (DEVIATION 2013-O0019) (JUL 2018)

(a) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph

(a) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records -- Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(b)

(1) Notwithstanding the requirements of any other clause in this contract, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (b)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

(ii) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iii) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (1) of FAR clause 52.222-17.

(iv) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(v) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).

(vi) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

(vii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

(viii) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

(ix) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).

(x) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xi) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67).

(xii) X (A) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O. 13627).

___ (B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 E.O. 13627).

(xiii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)

(xiv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)

(xv) 52.222-54, Employment Eligibility Verification (Oct 2015).

(xvi) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).

(xvii) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xviii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xix) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of Clause)

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.

(End of clause)

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days;

provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years, 6 months.

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://Farsite.hill.af.mil

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

COMBO

(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F03000 Issue By DoDAAC FA2835 Admin DoDAAC FA2835 Inspect By DoDAAC F2B3AQ Ship To Code F2B3AQ Ship From Code 3BRZ0 Mark For Code ____ Service Approver (DoDAAC) F2B3AQ Service Acceptor (DoDAAC) F2B3AQ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____

(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

Terri.rutkiewicz@us.af.mil Roland.hartz.1@us.af.mil

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

66cpts.fmz.systems@us.af.mil

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

5352.201-9101 OMBUDSMAN (24 SEP 2015)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, concerned parties may contact the Center/MAJCOM ombudsmen, Lt Col Peter Sandness Ombudsman

AFLCMC/AQ‐AZ

Acquisition Excellence Directorate

(937) 255‐5512 or DSN 5512 Email: peter.sandness@us.af.mil 2640 Loop Road West Wright Patterson AFB OH 45433‐7630

Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU or AFISRA level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS)

(Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number

(571) 256-2397, facsimile number (571) 256-2431.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.

5352.223-9000 ELIMINATION OF USE OF CLASS I OZONE DEPLETING SUBSTANCES (ODS) (NOV 2012)

(a) Contractors shall not:

(1) Provide any service or product with any specification, standard, drawing, or other document that requires the use of a Class I ODS in the test, operation, or maintenance of any system, subsystem, item, component, or process; or

(2) Provide any specification, standard, drawing, or other document that establishes a test, operation, or maintenance requirement that can only be met by use of a Class I ODS as part of this contract/order.

[Note: This prohibition does not apply to manufacturing.]

(b) For the purposes of Air Force policy, the following products that are pure (i.e., they meet the relevant product specification identified in AFI 32-7086) are Class I ODSs:

(1) Halons: 1011, 1202, 1211, 1301, and 2402;

(2) Chlorofluorocarbons (CFCs): CFC-11, CFC-12, CFC-13, CFC-111, CFC-112, CFC-113, CFC-114, CFC-115, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, and CFC-217, and the blends R-500, R-501, R-502, and R-503; and

(3) Carbon Tetrachloride, Methyl Chloroform, and Methyl Bromide.

[NOTE: Material that uses one or more of these Class I ODSs as minor constituents do not meet the Air Force definition of a Class I ODS.]

5352.223-9001 HEALTH AND SAFETY ON GOVERNMENT INSTALLATIONS (JUN 1997)

(a) In performing work under this contract on a Government installation, the contractor shall:

(1) Comply with the specific health and safety requirements established by this contract;

(2) Comply with the health and safety rules of the Government installation that concern related activities not directly addressed in this contract;

(3) Take all reasonable steps and precautions to prevent accidents and preserve the health and safety of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and

(4) Take such additional immediate precautions as the contracting officer may reasonably require for health and safety purposes.

(c) The contracting officer may, by written order, direct Air Force Occupational Safety and Health Standards (AFOSH) and/or health/safety standards as may be required in the performance of this contract and any adjustments resulting from such direction will be in accordance with the Changes clause of this contract.

(d) Any violation of these health and safety rules and requirements, unless promptly corrected as directed by the contracting officer, shall be grounds for termination of this contract in accordance with the Default clause of this contract.

5352.242-9000 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (JUN 2002)

(a) The contractor shall obtain base identification and vehicle passes for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.