Attachment_1-_Statement_of_Work.pdf

PDF 97 KB Posted

Attached to
Repair Water Meter Federal contract opportunity
Solicitation number
FA2835-17-R-0019
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Repair Water Meter, newest first.
File Type Posted
RFQ,_FA2835-17-R-0019_Repair_Water_Meter.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

For

Repair Water Meter #60392470

Location Building: 12003

By: Lenore Gerossie

WORK ORDER NUMBER: 66503

DATED: 3 March 2017

1. GENERAL INFORMATION:

This project is intended to repair water meter #60392470 in accordance with all applicable

National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the Commonwealth of

Massachusetts Building Code, United Facilities Criteria (UFC) and Massachusetts General

Law requirements, state and federal codes, base standards and manufacturer’s instructions.

Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply.

2. SCOPE: Repair Water Meter #60392470

See diagram for location

The Neptune Protectus Water meter #60392470 is not reading low water flow

Repair meter so low flow meter reads accurately

Install a meter bypass. Contractor shall make sure all valves shall be installed near the inlet and discharge of the water meter to isolate the meter from the waterline.

Contractor shall provide meters’ connection drawings

Install a gallons register on the mainline side

Provide new field calibration test to confirm completed work

Work to be done after hours or weekends

Red Lines are required

2. GENERAL REQUIREMENTS:

Work includes the following requirements:

a. Provide resolutions of any technical problems that arise during the construction.

b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.

c. Provide a full work schedule to Project POC upon approval of contract. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.

d. The Contractor is solely responsible for compliance with the Occupational Safety and

Health Act of 1974 (OSHA) and the protection of their employees and all sub-contractor employees. In performing work under this contract on a Government installation, the contractor shall report any accidents involving Air Force property/equipment damage, or contractor personnel injuries occurring on the job or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the contracting officer within five (5) days.

e. Provide three (3) copies of O & M manuals and warranty letter

f. The Period of Performance is 60 days after award of contract

g. Complete the “builder data inventory and assessment sheet” for newly installed assets, ensuring the bar code number is attached to the new equipment. Transfer bar codes from any removed equipment to the builder assessment ½ sheet form.

3. ADMINISTRATION:

Points of Contact (POC):

POC: Lenore Gerossie Phone Number. (781) 225-2960

Alternate POC: Bill Neice Phone Number. (781) 225-6157

File details come from the government source that posted it. Updated .