Attachment_1-_Statement_of_Work.pdf
PDF 97 KB Posted
- Attached to
- Repair Water Meter Federal contract opportunity
- Solicitation number
- FA2835-17-R-0019
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ,_FA2835-17-R-0019_Repair_Water_Meter.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
For
Repair Water Meter #60392470
Location Building: 12003
By: Lenore Gerossie
WORK ORDER NUMBER: 66503
DATED: 3 March 2017
1. GENERAL INFORMATION:
This project is intended to repair water meter #60392470 in accordance with all applicable
National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the Commonwealth of
Massachusetts Building Code, United Facilities Criteria (UFC) and Massachusetts General
Law requirements, state and federal codes, base standards and manufacturer’s instructions.
Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply.
2. SCOPE: Repair Water Meter #60392470
See diagram for location
The Neptune Protectus Water meter #60392470 is not reading low water flow
Repair meter so low flow meter reads accurately
Install a meter bypass. Contractor shall make sure all valves shall be installed near the inlet and discharge of the water meter to isolate the meter from the waterline.
Contractor shall provide meters’ connection drawings
Install a gallons register on the mainline side
Provide new field calibration test to confirm completed work
Work to be done after hours or weekends
Red Lines are required
2. GENERAL REQUIREMENTS:
Work includes the following requirements:
a. Provide resolutions of any technical problems that arise during the construction.
b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.
c. Provide a full work schedule to Project POC upon approval of contract. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.
d. The Contractor is solely responsible for compliance with the Occupational Safety and
Health Act of 1974 (OSHA) and the protection of their employees and all sub-contractor employees. In performing work under this contract on a Government installation, the contractor shall report any accidents involving Air Force property/equipment damage, or contractor personnel injuries occurring on the job or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the contracting officer within five (5) days.
e. Provide three (3) copies of O & M manuals and warranty letter
f. The Period of Performance is 60 days after award of contract
g. Complete the “builder data inventory and assessment sheet” for newly installed assets, ensuring the bar code number is attached to the new equipment. Transfer bar codes from any removed equipment to the builder assessment ½ sheet form.
3. ADMINISTRATION:
Points of Contact (POC):
POC: Lenore Gerossie Phone Number. (781) 225-2960
Alternate POC: Bill Neice Phone Number. (781) 225-6157