RFI with answers Bldg. 954 SCOW 2022-00129 17NOV22.pdf
PDF 219 KB Posted
- Attached to
- Eglin LAN DROP
- Solicitation number
- FA2823-23-Q-A004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bldg. 954 Combined PWS 15 Nov 22 (V3).docx | DOCX document | |
| (1) Combo_SGT.pdf | ||
| 96_CS Design_Guide February_2020 - Copy.pdf | ||
| Bldg. 954 Combined PWS 11 Oct 22 (V1).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACTION; NOTED: C = Concur; D = Deferred for Further Investigation; N = Not Provided / Non Agreement
______Nov 17 22__
RFI # _______ RFI SUBJECT: BLDG 954 LAN DROP______ CONTRACT # __Pending_ W/O# Pending____
Planning/Construction: __Pending___PRIME CONTRACTOR: _Pending_________
SUBCONTRACTOR: ______________ PROJECT MANAGER: _______________ PROJECT MONITOR: ________________
PROJECT: BLDG 954 LAN DROP____________________________________________________
LOCATION: _BLDG 954 EGLIN AFB________________
REQUEST: Official questions from vendors in regards to SAM NOTICE FA282323QA004 on PAGE 2___________________________________________________________________________________________________
DESIGN SPEC SECTION: ____________________________________________________________________________
DESIGN DRAWINGS: ______________________________________________________________________________
PRODUCT SUBMITTAL(S): _________________________________________________________________________
REQUESTOR’S NAME/EMAIL: ________________________________________________________
PHONE:
A = APPROVED
D = DISAPPROVED
/W COMMENTS
GOVERNMENT RESPONSE/RECOMMENDATION
ACTION
NOTED INITAL
1 Yes the ceilings are drop ceiling MAS
2 No MAS
Approx. 50‐feet of EMT for a 6awg ground wire and 2‐inch conduit for the wall penetration’s
MAS
No cable tray is installed. J‐hooks will be required. Refer to the Floor plan T001 for pathway
MAS
The 96CS does not provide cable footages. Refer to the Eglin Cyber Infrastructure
Standards and Installation Specifications for the type of cable to be used
MAS
/// /// ///Last Item/// /// ///
NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO REQUESTS FOR INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF RESPONDENT CONSIDERS THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S
REPRESENTATIVE IN ACCORDANCE WITH CONTRACT PROVISIONS.
1. Are ceilings drop ceiling?
2. Will lift be required?
3. How much conduit will be required?
4. Is there a cable tray installed?
5. We will need to know the amount of wire needed and the type.
REQUEST FOR INFORMATION OR INTERPRETATION (RFI)
This RFI is a documented process, generated by either an owner, owner’s agent, government or contractor, to obtain information or to clarify the capabilities of various products, services, design, installation, processes, standards or requirements.