RFI with answers Bldg. 954 SCOW 2022-00129 17NOV22.pdf

PDF 219 KB Posted

Attached to
Eglin LAN DROP
Solicitation number
FA2823-23-Q-A004
Issued by

View the file

Other files

File Type Posted
Bldg. 954 Combined PWS 15 Nov 22 (V3).docx DOCX document
(1) Combo_SGT.pdf PDF
96_CS Design_Guide February_2020 - Copy.pdf PDF
Bldg. 954 Combined PWS 11 Oct 22 (V1).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACTION; NOTED: C = Concur; D = Deferred for Further Investigation; N = Not Provided / Non Agreement

______Nov 17 22__

RFI # _______ RFI SUBJECT: BLDG 954 LAN DROP______ CONTRACT # __Pending_ W/O# Pending____

Planning/Construction: __Pending___PRIME CONTRACTOR: _Pending_________

SUBCONTRACTOR: ______________ PROJECT MANAGER: _______________ PROJECT MONITOR: ________________

PROJECT: BLDG 954 LAN DROP____________________________________________________

LOCATION: _BLDG 954 EGLIN AFB________________

REQUEST: Official questions from vendors in regards to SAM NOTICE FA282323QA004 on PAGE 2___________________________________________________________________________________________________

DESIGN SPEC SECTION: ____________________________________________________________________________

DESIGN DRAWINGS: ______________________________________________________________________________

PRODUCT SUBMITTAL(S): _________________________________________________________________________

REQUESTOR’S NAME/EMAIL: ________________________________________________________

PHONE:

A = APPROVED

D = DISAPPROVED

/W COMMENTS

GOVERNMENT RESPONSE/RECOMMENDATION

ACTION

NOTED INITAL

1 Yes the ceilings are drop ceiling MAS

2 No MAS

Approx. 50‐feet of EMT for a 6awg ground wire and 2‐inch conduit for the wall penetration’s

MAS

No cable tray is installed. J‐hooks will be required. Refer to the Floor plan T001 for pathway

MAS

The 96CS does not provide cable footages. Refer to the Eglin Cyber Infrastructure

Standards and Installation Specifications for the type of cable to be used

MAS

/// /// ///Last Item/// /// ///

NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO REQUESTS FOR INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF RESPONDENT CONSIDERS THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S

REPRESENTATIVE IN ACCORDANCE WITH CONTRACT PROVISIONS.

1. Are ceilings drop ceiling?

2. Will lift be required?

3. How much conduit will be required?

4. Is there a cable tray installed?

5. We will need to know the amount of wire needed and the type.

REQUEST FOR INFORMATION OR INTERPRETATION (RFI)

This RFI is a documented process, generated by either an owner, owner’s agent, government or contractor, to obtain information or to clarify the capabilities of various products, services, design, installation, processes, standards or requirements.

Date/Time:

Page(s)__1__