25 April 2013
Bldg 102 Sun Shades Lighting
FA2823-13-R-6003
QUESTIONS AND ANSWERS
1. At spot F1, is the conduit running both ways between the sunshades?
- Not relevant to this project’s scope of work.
2. Is there a diagram of all routing on pipes underground?
- No
3. There are two panels on spot I2, should they move the extra panel over to spot I1?
- Yes, the extra (not being used) panel on spot I2 can be moved over to spot I1.
4. What are the dimensions of the Sun Shades?
- The sunshades on spots E1 and E2 are 80'X80'X30'high. The rest of the sunshades are 70'X70'X30'high.
5. Where can they store their Lift/equipment?
- The squadron will give them a location just off the flight line to store their equipment when not in use.
6. Will aircraft be moved when working on the spots?
-The government should be given 48 hours' notice and they will have the aircraft moved.
7. May we see some specs for this requirement (type of wiring)?
- All wiring to be copper with THWN type insulation.
8. Does the conduit run underground?
-Existing feeds to panel boards are routed underground.
9. Should we replace all damage covers?
- Yes
10. Should we reconnect all the disconnected ground wires?
- Yes
11. Do you have schematics or pictures of what an “acceptable” station should look like?
- No
12. Within the breaker boxes (panels) there are aluminum busts and the Air Force’ standard is copper. Should these be replaced?
- No