25 April 2013

Bldg 102 Sun Shades Lighting

FA2823-13-R-6003

QUESTIONS AND ANSWERS

1. At spot F1, is the conduit running both ways between the sunshades?

- Not relevant to this project’s scope of work.

2. Is there a diagram of all routing on pipes underground?

- No

3. There are two panels on spot I2, should they move the extra panel over to spot I1?

- Yes, the extra (not being used) panel on spot I2 can be moved over to spot I1.

4. What are the dimensions of the Sun Shades?

- The sunshades on spots E1 and E2 are 80'X80'X30'high. The rest of the sunshades are 70'X70'X30'high.

5. Where can they store their Lift/equipment?

- The squadron will give them a location just off the flight line to store their equipment when not in use.

6. Will aircraft be moved when working on the spots?

-The government should be given 48 hours' notice and they will have the aircraft moved.

7. May we see some specs for this requirement (type of wiring)?

- All wiring to be copper with THWN type insulation.

8. Does the conduit run underground?

-Existing feeds to panel boards are routed underground.

9. Should we replace all damage covers?

- Yes

10. Should we reconnect all the disconnected ground wires?

- Yes

11. Do you have schematics or pictures of what an “acceptable” station should look like?

- No

12. Within the breaker boxes (panels) there are aluminum busts and the Air Force’ standard is copper. Should these be replaced?

- No