Attach_4_PPQ.pdf
PDF 59 KB Posted
- Attached to
- Combined Synopsis/Solicitation
- Solicitation number
- FA2550-17-R-2006
About this file
Attachment 4 Past Performance Questionnaire
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attch_7_SF1449.pdf | ||
| SSO_DD254_Attachment.docx | DOCX document | |
| attach3_DD254.pdf | ||
| Attch2WD2015_5417Rev5.pdf | ||
| Attachment_5_Sample_Consent_Letter.doc | DOC document | |
| Q&A.pdf | ||
| Attach1PWS.pdf | ||
| Attachment_6_Sample_Client_Authorization_Letter.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAST/PRESENT PERFORMANCE QUESTIONNAIRE (PPQ)
WHEN FILLED IN THIS DOCUMENT IS SOURCE SELECTION SENSITIVE INFORMATION IAW FAR 2.101 & 3.104
SECTION 1: CONTRACT IDENTIFICATION
A. Contractor:________________________________________________________________________
B. Contractor Cage Code: _________________________________
C. Contract number: ______________________________________
D. Contract type: ______________________________
E. Was this a competitive contract? Yes _____ No _____
F. Period of performance: _________________________________________________________
G. Contract cost: $____________________________
H. Description of service provided:
SECTION 2: CUSTOMER OR AGENCY IDENTIFICATION
A. Customer or agency name: __________________________________________________________ B. Customer or agency description (if applicable): __________________________________________
C. Geographic description of services under this contract, i.e. local, nationwide, worldwide, other Commands:
SECTION 3: EVALUATOR IDENTIFICATION
A. Evaluator's name: __________________________________________________________________
B. Evaluator's title: ___________________________________________________________________
C. Evaluator's phone/fax number: ________________________________________________________
Length of time (number of years/months) evaluator worked on subject contract: ____________________
SECTION 4: EVALUATION
Please indicate your satisfaction with the contractor’s performance by placing an “X” in the appropriate block using the scale provided to the right of each question. This scale is defined as follows:
CODE PERFORMANCE RATING
B BLUE/EXCEPTIONAL - During the entire period, the contractor met and exceeded many of the requirements of the contract and consistently performed at a superior level.
Performance was accomplished with very few minor problems, and the contractor took immediate and effective corrective actions for those problems that did occur.
P PURPLE/VERY GOOD - During the entire period, the contractor met all requirements and exceeded some of the requirements of the contract and consistently performed very well. Performance was accomplished with some minor problems, and the contractor took timely and effective corrective action for those problems that did occur.
G GREEN/SATISFACTORY - During the entire period, the contractor met all of the requirements of the contract and consistently performed at an acceptable level.
Performance was accomplished with some problems, and the contractor took effective corrective action for those problems that did occur.
Y YELLOW/MARGINAL – During the entire period, the contractor did not always meet some of the requirements of the contract and intervention was required to continue performance. There were instances where performance was at a less than acceptable level; performance was accomplished with some problems and some corrective actions appear only marginally effective or were not fully implemented.
R RED/UNSATISFACTORY – During the entire period, the contractor did not meet the requirements of the contract and performance was at an unacceptable level. There were a number of serious problems that required extensive oversight and involvement, and corrective actions were either ineffective or non-existent.
N/A NOT APPLICABLE - Unable to provide a rating. Contract did not include performance for this aspect, or information was not available. Do not know.
Technical Performance B P G Y R N/A
T1. How did the contractor meet the technical requirements of the specification, specifically Sensitive Compartmented Information and Special Access Program?
T2. How was the quality of technical efforts of Sensitive Compartmented Information and Special Access Program?
T3. How was the quality/integrity of technical data/report preparation efforts?
T4. How did the contractor implement current quality processes?
Program Management B P G Y R N/A
P1. How effective was overall contract management (including ability to effectively lead, manage, control and deliver on-time)?
P2. How reasonable and cooperative was the contractor when dealing with program staff (including the ability to successfully resolve disagreements/disputes)?
P3. How timely and effectively did the contractor resolve contract problems without extensive customer guidance?
P4. How well did the contractor understand/comply with customer objectives and technical requirements?
P5. How successfully did the contractor respond to emergency and/or surge situations?
P6. To what degree did the contractor implement responsive/flexible processes to improve quality and timeliness of support?
Transition/phase-in B P G Y R N/A
Transition/phase-in B P G Y R N/A
T1. How smoothly did the contractor transition resources and personnel?
T2. How effective was the contractor in maintaining continuity of mission support while transitioning/phasing in resources and personnel to support other efforts?
Employee Retention/Attraction B P G Y R N/A
E1. How effectively was the contractor able to hire/apply a qualified workforce to this effort?
E2. How effectively was the contractor able to retain a qualified workforce on this effort?
1. Please discuss each and every response for which you indicated B/E (Blue/Exceptional), P/E (Purple/Very Good), Y/M (Yellow/Marginal) or R/U (Red/Unsatisfactory) in response to the questions above (use additional sheets, if necessary).
2. Government Contracts Only: Was this contract partially or completely terminated for default or convenience or are there any pending terminations?
Yes___ Default___ Convenience___ Pending Terminations___
No ___
If yes, please explain (e.g., inability to meet cost, performance, or delivery schedules).
SECTION 5: NARRATIVE SUMMARY
Would you have any reservations about soliciting this contractor in the future or having them perform one of your critical and demanding programs?
Please provide any additional comments concerning this contractor’s performance, as desired.
Evaluator’s Signature Date
Thank you for your prompt response and assistance!
Please return this completed questionnaire to:
Mailing Address: 50 CONS/LGCB 210 Falcon parkway Suite 2116 Schriever AFB, CO 80912-2116
E-Mail to: Contracting Officer, Ms. Nicole Mintus at nicole.mintus@us.af.mil and Contract Specialists SrA Heeyuen Joo at heeyeun.joo.1@us.af.mil and Ms. Susan Wright at susan.wright.2@us.af.mil.
mailto:nicole.mintus@us.af.mil mailto:heeyeun.joo.1@us.af.mil mailto:susan.wright.2@us.af.mil
SECTION 3: EVALUATOR IDENTIFICATION
File details come from the government source that posted it. Updated .