5_GLEN_15-3307_Form_66.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
SYNOPSIS GLEN 15-3307
Solicitation number
FA2550-17-R-1015
Issued by

About this file

AF 66

View the file

Other files

File Type Posted
2_GLEN_15-3307_SOW.pdf PDF
1_FA255017R1015_GLEN15-3307_1442.pdf PDF
3_GLEN_15-3307_Specifications.pdf PDF
4_Design_Guide_Version_March_2016.pdf PDF
Synopsis_GLEN_15_3307.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALS (Paving IDIQ)PROJECT NO.PROJECT NAMESOLICITATION /CONTRACT NUMBER
GLEN 15-3307Repair West Drainage at South Perimeter
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERNote: 3 copies required per submittal. Government will retain all submittals.CERTIFICATE OF COMPLIANCESHOP DRAWINGSCOLOR SELECTIONMANUFATURUR'S RECOMMENDATIONCATALOG DATAO&M RECOMMENDATIONSCALCULATIONSWARRANTYDRAWINGSREPORTTEST RESULTSREQUIRED SUBMISSION DATEDATE TO CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSAPPROVEDDISAPPROVEDCONTRACTOR SUBMITTALFINAL APPROVALREMARKS
GENERAL
1Approved Form 103, BCE Work Clearance RequestXPrior to commencement of workWith Map Accurately Showing Work Area
2Project Specific SDSXNTP + 5 daysPrior to Mobilization
3Form-3064 Contract Progress ScheduleXBid Submittal
4Form-3065 Contract Progress ReportXEach Draw
5Health, Safety, and Environment Plan(s)1NTP + 5 days
6Traffic Control Plans - For Each Phase of Construction11NTP + 10 days
7Contractor's QA/QC Plan1NTP + 5 days
8Business Telephone and Directory1NTP + 5 days
9Site Visit Meeting Minutes1NTP + 5 days
10Construction Schedule1NTP + 5 days and weekly updates
11Salvageable Material1NTP + 5 days
12Monthly Solid Waste Reporting1Monthly Reports
13Hydrant Connection request110 days prior to any work
14Utility Outage Request110 days prior to the proposed outage
15Traffic Change Request110 days prior to commencing with construction activities
CIVIL
16Current Backflow Preventer Inspection Cert.1110 days prior to any work
17Joint layout Plan110 days prior to any work
18Select Fill / Class 6 Sieve Analysis11NTP+5 days
19Select Fill Chem. Analysis (Where Applicable)11NTP+5 days
20Soil Compaction Test Results11Within 3 days after test results are made available
21Concrete Mix Design per ACI11NTP+5 daysIncluding Break History
22Concrete Batch Tickets, Each Truck11Following day
23Concrete 7 and 28 Day ACI Compressive Strength Test Results11Within 3 days after test results are made available
24Product Data - Expansion Joint Sealant11NTP+5 days
25Concrete Aggregate Sieve Analysis11NTP+5 days
26Concrete Curing Compounds, Admixtures, Joint Sealants, Expansion Joints, and Asphalt Crack Sealant Materials11NTP+5 days
27Sampling and Testing, Aggregate Base - Sieve Results, Field Density Tests11Within 3 days after test results are made available
28Structural Steel Certifications1NTP+21 days
29Steel Pile Certifications11NTP + 21 days
30Welder CertificationsXXXNTP+5 days
31Steel Grate Shop DrawingsXXXNTP+5 days
32Guardrail Materials and Method of InstallationXXXNTP+5 days
33SWPP and Dewatering Plan11NTP+5 days
34Soil Density Test Results11Test + 1 day
CLOSEOUT
35O&M Maintenance data, manuals and Manufacturer's Warranties1Install + 4 days
36DD1354 Transfer of Real Property Form11Before Acceptance
37Factory and Field Test Certificates, Logs and Test Results11Before Acceptance
38As Built Submittal per AEC Standards on CD3Final + 7 days