SESAMI SST Fiber Cable Path and Room Layouts.pptx
PPTX presentation 1 MB Posted
- Attached to
- SST Fiber Cable Material and Installation
- Solicitation number
- FA254324Q0054
About this file
This document is a Request for Quote (RFQ) Notice for a fiber cable material and installation contract opportunity. The U.S. Air Force 460th Contracting Squadron at Buckley Space Force Base, CO is seeking a contractor to provide fiber cables and installation to establish a direct connection path for Standard Space Trainer (SST) workstations in Building 442 to the SST server in Building 447. The contractor must deliver the required fiber cabling and installation within 90 days after receipt of the order. Responses to the RFQ, including a statement of work, quote, warranty details, and company information, are due by 10:00 AM MDT on Monday, September 16, 2024. Questions from interested vendors are due by 10:00 AM MDT on Tuesday, September 10, 2024. The Performance Work Statement outlines the specific requirements for the fiber cable material and installation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SESAMI SST Fiber Cable Path & Room Layouts
Space Delta 4 Videmus Mundum
Bldg. 447 East Side Fiber Path
Run 36-strand single-mode fiber cable from Bldg. 447 Room S123 (IST Comm) through Room 030 (Core Node) to Bldg. 442, Room 510 (OBAC Equipment Room) Cable passes through Room 030, does not terminate in Room 030 Terminate in Bldg. 447, Room S123 to IST Cab 1, Patch Panel 2 (new patch panel needed at U40 of rack) using LC connections Terminate other end of cable at Bldg. 442, Room 510 to Rack 01B, U1 using LC connections Run 16-strand single-mode fiber cable from Bldg. 447, Room S123, to Bldg. 447, Room S122 (SST Server) Terminate in Room S123 to IST Cab 1, Patch Panel 2 using LC connections Terminate in Room S122 to SST Cab 8 using LC connections
Bldg. 447 West Side Fiber Path
Run 36-strand single-mode fiber cable from Bldg. 447 Room S123 (IST Comm) through Room 030 (Core Node) to Bldg. 442, Room 510 (OBAC Equipment Room) Cable passes through Room 030, does not terminate in Room 030 Runs through Protected Distribution System (PDS) conduit
Bldg. 442 SESAMI SST Fiber Path
From Bldg. 447 36-strand (18-pair) single-mode fiber cable ran from Bldg. 447, Room S123 (IST Comm) direct to Bldg. 442, Room 510 Annotated by red lines Runs through PDS conduit from facility exterior to Room 271 Opens into cable trays in Room 271 2-strand (1-pair) single-mode fiber cable ran from Bldg. 442, Room 510 (Rack 1B) direct to Bldg. 442, Room 300 (Rack 5164) Annotated by blue lines
Rack 5164
Bldg. 447 Room S122
PDS Conduit from Room S123 entry point into Room S122
16-strand fiber cable termination point (Rack 8)
Bldg. 447 Room S123
16-strand fiber cable termination point (S123 to S122 cable connection) PDS Conduit from Room S122 entry point into Room S123 36-strand fiber cable termination point (S123 to Bldg. 442 Room 510 cable connection) PDS Conduit from Room 030 entry point into Room S123
Bldg. 447 Room 030
PDS Conduit from Room S123 junction point into Room 030
Questions?
Videmus Mundum
Backup Backup image2.png image4.png image9.emf image10.PNG image11.png image12.png image13.svg image14.PNG image15.PNG image16.PNG image3.png image1.jpeg image5.png
File details come from the government source that posted it. Updated .