SOW LRS Workstations 18 Aug 25.docx
DOCX document 29 KB Posted
- Attached to
- Modular Furniture
- Solicitation number
- FA252125QB125
About this file
This Statement of Work (SOW) details a furniture procurement and installation project for the 45th Logistic Readiness Squadron at Patrick Space Force Base in Florida. The project requires the contractor to procure, deliver, and install 9 workstation systems (78 x 66 inches, 30 inches high) for Room 109, 2 supervisor office furniture sets for Rooms 110 and 111, 1 conference table, and 4 file cabinets. Desired specifications include integrated power features, a professional color palette of gray, dark tones, charcoal, and black, and associated accessories like ergonomic keyboards, monitor arms, and cable management units.
The project has a 30-calendar day performance period and requires base access compliance, including REAL ID-compliant identification and vehicle documentation. The contractor will be responsible for removing 12 existing workstations, installing new furniture, and ensuring proper placement and alignment with user design requirements. The procurement is for the Department of the Air Force Space Command, with the work to be completed at Building 822, located at 972 South Patrick Drive, Patrick Space Force Base, Florida 32925. Quality assurance will be conducted through government inspections to verify satisfactory completion of the furniture installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Room 111 L-Shaped Standing Left Return Corner Desk .png | PNG image | |
| (2) 2 Drawer Lateral Storage Cabinet.png | PNG image | |
| (2) 5 Drawer Lateral Storage Cabinet.png | PNG image | |
| Office Furniture Blueprint.png | PNG image | |
| File Pedestal (if need separate).png | PNG image | |
| 10 Ft conference table.png | PNG image | |
| Room 110 Adjustable L-Desk (pref. duel storage).png | PNG image | |
| 25QB125 Q and A.docx | DOCX document | |
| Room 111 RIght Return Hutch.png | PNG image | |
| Room 109 (9) Workcenter capable to add Monitor Arms.png | PNG image | |
| Sliding Laptop Tray.png | PNG image | |
| Duel Monitor Arms Universal Mounts.png | PNG image | |
| RM 110 and 111 .pdf | ||
| SOW LRS Workstations 15 Jul 25.pdf | ||
| FA252125QB125 CSS Final.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) 45th Logistic Readiness Squadron Patrick SFB, Florida 18 Aug 25
1. GENERAL
Project: LRS workstation furniture Location: Bldg. 822
2. STATEMENT OF WORK
The contractor shall furnish all labor, materials, equipment, tools, supervision, and management necessary to procure, deliver, install 9 workstation systems for room 109 and 2 supervisor office furniture’s (rooms 110 and 111) at Building 822, Patrick SFB, FL. The work supports improved communication and functionality within the work center environment. Work shall comply with current Florida building codes and base standards.
3. Requirements
3.1 Design and Procurement
· Design workstation configurations per user requirements
· Procure workstation systems including:
· 9 Workstations 78 X 66 inches, 30 inches high.
· 2 Supervisor office furniture not to exceed 9X6 ft.
· 1 Conference Table 10ft X 30 inches high.
· 4 File Cabinets
· Associated accessories and pedestals (per vendor specifications)
We prefer that all workstations and furniture include integrated power features to support user functionality and reduce cable clutter.
Desired color palette includes combinations of gray, dark tones, charcoal, and black, to maintain a professional and cohesive aesthetic.
3.2 Installation
· Deliver and install all workstation systems and furniture at Building 822
· Install accessories including ergonomic keyboards, monitor arms, lateral files, and cable management units as per configuration plans
· Teardown and disposal of 12 existing workstations and office furniture at room 110 and 111.
· Install HD Cylinder Kits on Float Tables (labor provided hourly as needed)
· Remove legacy desk
Note: Electrical and communications connections will be performed by government or third-party personnel and are not included in this scope.
4. PERFORMANCE PERIOD
The period of performance for this project is 30 calendar days ARO.
5. Place of Performance
972 South Patrick Dr.
Building 822, Room 109 Patrick SFB, FL 32925
6. Base Access and Identification Requirements
· Identification: Visitors must present a valid government-issued photo ID, such as a driver's license or passport. Starting May 7, 2025, the REAL ID Act will be fully enforced, meaning only REAL ID-compliant licenses or other approved identification will be accepted for access
· Vehicle Requirements: Drivers will need proof of insurance, vehicle registration, and a valid driver's license. Vehicles are subject to inspection by security personnel
7. Quality Assurance The Government will verify satisfactory completion through inspections of furniture placement, accessory installation, and alignment with user design requests. Any discrepancies shall be resolved promptly by the contractor at no additional cost.
File details come from the government source that posted it. Updated .