SSJ FA252125P0081 SAM_Redacted.pdf

PDF 339 KB Posted

Attached to
JDMTA Fiber Lines
Solicitation number
FA252125P0081
Issued by

About this file

This document is a Single Source Justification (Simplified Acquisition) for the Eastern Range AT&T Fiber Extension project. The contract, associated with Contracting Activity 45 CONS FA2521, requires completing a fiber optic communication path for the Jonathan Dickson Missile Tracking Annex (JDMTA) Microwave Communication System replacement project. The specific work involves extending a fiber optic path approximately 1.5 miles to the fence line of the JDMTA facility.

The justification for single-source procurement stems from AT&T's existing fiber lines that can be utilized with minimal rework, reducing potential risks to cost, schedule, and performance. The government acknowledges this is a follow-on requirement to complete a mission-essential connection and plans to monitor telecommunication providers' capabilities for future competitive opportunities. The contracting officer, Kristin Doty, has determined that a single source is reasonably available, with the document dated and signed on 11-Sep-2025.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Single Source Justification (Simplified Acquisition)

CONTROLLED UNCLASSIFIED INFORMATION

April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 2April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 2

Single Source Justification (Simplified Acquisition)

CONTROLLED UNCLASSIFIED INFORMATION

April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 2

File details come from the government source that posted it. Updated .