24R0027 - Q and A.docx

DOCX document 751 KB Posted

Attached to
DFAC PA System
Solicitation number
FA252124R0027
Issued by

About this file

This document is a set of questions and answers related to a federal contract opportunity for a new paging/music audio system. The key details are:

The contract is a new requirement, with no incumbent currently performing these services. A site visit has been scheduled for June 3, 2022 at 10 A.M. The government is not providing a cost estimate or budget for the project, and does not have a confirmed start date. The system will be for both music and paging, with the vendor required to provide any necessary new wiring. The system will have a single control location, with no preference on the microphone type as long as it can override the music. The government will not provide additional site visits. The system will play the same music in all zones, without the ability to play different content simultaneously. The government may require the vendor to provide an audio equipment rack, but details on power and grounding requirements are still pending further review. No floor plans were provided with the solicitation.

View the file

Other files

File Type Posted
24R0027 - Q and A.docx DOCX document
24R0027 - Q and A.docx DOCX document
24R0027 - Q and A.docx DOCX document
24R0027 - Q and A.docx DOCX document
24R0027 - Q and A.docx DOCX document
24R0027 - Combined Synopsis Solicitation Final.pdf PDF
24R0027 - Q and A.docx DOCX document
Salient Characteristics - PA Audio System Rev 1.pdf PDF
24R0027 - Combined Synopsis Solicitation Final.pdf PDF
24R0027 - Clause Set.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA252124R0027 – DFAC PA System Q and A 1: We would like to know if this is a brand-new contract OR if there is (was) an incumbent performing these services.

A: This is a new requirement.

2: I would like to know if you currently have a scheduled site visit for all vendors.

A: Yes, a site visit has been scheduled. We will be having a sit visit on Monday 3 June at 10 A.M. We will need your contact information sent to us.

3: Is there a cost estimate, budget or ballpark figure for the project listed?

A: We are not giving cost estimates for this project.

4: Is there an actual start date for the project?

A: We don’t have a start time at this time.

5: Does all of the wiring go to the same location?

A: Yes.

6: Is it also for paging?

A: Yes, this is for both music and paging.

6: If we need new wires to run through the building, would we supply those?

A: Yes, the vendor supplies the wires. Add it to the total cost in the quote just in case they are needed.

7: Is there access to the ceiling?

A: Yes.

8: Will the system be tied to one music service?

A: No. There will also be no monthly service charges.

9: Do all speakers work?

A: Unknown. Add it to the total cost in the quote just in case they are needed.

10: Will the system be connected to the existing televisions?

A: No 11: Will each room need a different source?

A: No. Each room will play the same music from the same source.

12: Will there be separate controls in the Pelican Room?

A: No. All controls will be in one location.

13: What type of microphone?

A: No preference, but the microphone will need to override the music for announcements.

14: I was unable to attend this morning’s site walkthrough. Would it be possible to schedule a site survey at another time this week?

A: I’m sorry, we are not able to provide any additional site visits for this requirement at this time.

15: Is there any existing volume control installed and remaining for use in the Pelican Room?

A: See question 12 16: Is there a need for new speakers in the Pelican Room to replace any existing speakers?

A: See question 9 17: Is there a need for additional new speakers in the Pelican Room to add to the existing number of speakers?

A: No additional speakers are needed.

18: Is there a need for additional speakers to be added to any of the rooms controlled by one of the 7 volume controls?

A. No additional speakers are needed.

19: Will you supply your own commercial music subscription license?

A. See question 8.

20: Is the ceiling construction hard ceiling or dropped ceiling tile?

A: There is attic access and drop ceiling tiles.

21: Is the override interrupt relay to accommodate a fire event from the fire alarm system in addition to a page/announcement?

A: No 22: Will all the zones play the same song or do you require different areas to be able to play different songs simultaneously? E.G. Pelican Room playing soft jazz and another room playing pop/rock music.

A: All zones will play the same song.

23: Are there any existing owner furnished contractor installed devices or materials being reused or turned over to the contractor for this installation?

A: No 24: Is the audio equipment rack existing or is it to be furnished by the contractor?

A: Will need to be added to the Quote.

25: Is it correct to assume there is only one paging microphone required for the system and it will be located at the head end audio rack? IF not, please disclose quantity and location of paging microphones required for installation.

A: Only one microphone is needed in the control room.

26: If hard ceiling, is there access to above ceiling area.

A: See question 20 27: If audio rack is to be furnished, is there space to mount the audio rack to the wall or do you prefer a caster wheel base floor unit?

A: Caster Wheelbase.

28: If audio rack is to be furnished are high voltage electrical requirements for power and grounding of the rack existing, furnished by others or a condition of the award?

A: Answer pending further government review.

29: Is there a floor plan available that conveys the size of the project space/site?

A:

image1.jpeg image2.jpeg