FA252123B0003 A0001.pdf

PDF 583 KB Posted

Attached to
DBEH 22-1580 Replace HVAC Controls Federal contract opportunity
Solicitation number
FA252123B0003
Issued by
Department of the Air Force Space Command

About this file

This solicitation seeks proposals for a firm fixed price construction contract to replace HVAC controls with new automation servers at various facilities located in Cape Canaveral, Florida and Jupiter, Florida. The work includes providing labor, equipment, and materials to install SmartStruxture automation servers and integrate them with the existing EMCS server. Offerors must provide graphical user interfaces, data logs, alarms, and perform the work according to the statement of work. The acquisition is set aside for service-disabled veteran-owned small businesses and has a magnitude between $500,000 to $1,000,000. The performance period includes locations at Cape Canaveral Space Force Station facilities 55899, 66250, 1606, and 1428, as well as Jonathan Dickinson Missile Tracking Annex facility 28001. The solicitation was issued by Space Launch Delta 45 under the Department of the Air Force. Funds are not presently available and the government's obligation is contingent upon appropriation and availability of funds.

View the file

Other files for this federal contract opportunity

Other files attached to DBEH 22-1580 Replace HVAC Controls, newest first.
File Type Posted
FA252123B0003 SF 1409 Abstract.pdf PDF
FA252123B0003 A003.pdf PDF
FA252123B0003 A003.pdf PDF
Attachment 26 WD FL20230001 (20230602).pdf PDF
FA252123B0003 A002.pdf PDF
Attachment 25 WD FL20230001 (202305015).pdf PDF
Attachment 21 As Built DWG Facility 1428 CCSFS (Replace HVAC Fire Protection Elec Dist).pdf PDF
Attachment 23 As Built DWG Facility 55899 CCSFS (SOSF).pdf PDF
Attachment 24 Estimated Quantity of Devices.pdf PDF
Attachment 20 QA Government Responses.pdf PDF
Attachment 22 As Built DWG Facility 1606 CCSFS (OEM).pdf PDF
23B0003 (DBEH 22-1580) Site Visit Roster.pdf PDF
FA252123B0003 (DBEH 22-1580).pdf PDF
Attachment 2 WD FL20230001.pdf PDF
Attachment 3 WD FL20230214.pdf PDF
Attachment 10 Answers to Questions from 22B0011.pdf PDF
Attachment 16 JDMTA As-Built Control Drawing 6.jpg JPG image
Attachment 11 JDMTA As-Built Control Drawing 1.jpg JPG image
Attachment 17 JDMTA As-Built Control Drawing 7.jpg JPG image
Attachment 18 JDMTA As-Built Control Drawing 8.jpg JPG image
Attachment 1 SOW DBEH 22-1580 (20230313 (Rev 3)).pdf PDF
Attachment 5 Contractor Hazardous Waste Form.docx DOCX document
Attachment 9 Badge Request Form.pdf PDF
Attachment 13 JDMTA As-Built Control Drawing 3.jpg JPG image
Attachment 14 JDMTA As-Built Control Drawing 4.jpg JPG image
Attachment 15 JDMTA As-Built Control Drawing 5.jpg JPG image
Attachment 4 GPP Certification (DBEH 22-1580).pdf PDF
Attachment 6 CECC Form 3052.xlsx XLSX spreadsheet
Attachment 7 QA Template.docx DOCX document
Attachment 8 Site Visit Rules.pdf PDF
Attachment 12 JDMTA As-Built Control Drawing 2.jpg JPG image
Attachment 19 Drawing 98K00034 (19990820).pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

Created On: 22 May 2023, 05:35 AM Eastern Standard Time

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Revise the CLIN description of work to reflect the requirements as listed in Attachment 1, Block 14 (Description of Amendment/Modification):

Statement of Work. The following attachments are incorporated as part of Section J.

Attachment 20. Question & Answer / Government Response Attachment 21. As Built Drawings Facility 1428 Attachment 22. As Built Drawings Facility 1606 Attachment 23. As Built Drawings Facility 55899 Attachment 24. Estimated Quantity of Devices (Project Number DBEH 22-1580)

Attachment 2 is removed and replaced with Attachment 25. Construction Wage Determination (FL 20230001) dated 5 May 2023

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Description

Contractor shall provide all labor, equipment, and materials to replace HVAC controls with new SmartStruxture automation servers at buildings 55899, 66250, 1606, 1428, CCSFS and building 28001 JDMTA, FL. Provide integration to the EMCS server at PSFB.

Provide graphical user interface screens, data logs, and alarms. MC2 controls shall be used for up-graded SmartStruxure system. All work shall be performed in accordance with the Statement of Work listed in Section J.

Contractor shall provide all labor, equipment, and materials to replace HVAC controls with new SmartStruxture automation servers at buildings 55899, 66250, 1606, 1428, CCSFS and building 28001 JDMTA, FL. Provide integration to the EMCS server at PSFB.

Provide graphical user interface screens, data logs, and alarms. Schneider controls shall be used for up-graded SmartStruxure system. All work shall be performed in accordance with the Statement of Work listed in Section J.

Section C - Description/Specifications/Statement of Work

The Requirements text has been modified to:

Contractor shall provide all labor, equipment, and materials to replace HVAC controls with new SmartStruxture automation servers at buildings 55899, 66250, 1606, 1428, CCSFS and building 28001 JDMTA, FL. Provide integration to the EMCS server at PSFB. Provide graphical user interface screens, data logs, and alarms.

Schneider controls shall be used for up-graded SmartStruxure system.

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

Attachment 1 - Statement of Work (DBEH 22-1580) dated 13 March 2023 (Pages: 5)

Attachment 2 - Construction Wage Determination (FL 20230001) dated 13 January 2023 (Pages: 8) (Removed and Replaced with Attachment 25)

Attachment 3 - Construction Wage Determination (FL 20230214) dated 24 March 2023 (Pages: 6)

Attachment 4 - GPP Certification (DBEH 22-1580) (Pages: 11)

Attachment 5 - CTR Hazardous Waste Form (Pages: 2)

Attachment 6 - CECC Form 3052

FA252123B00030001

Attachment 7 - Q&A Template (Pages: 1)

Attachment 8 - Site Visit Rules (Pages: 2)

Attachment 9 - Badge Request Form (Pages: 1)

Attachment 10 - Answers to Questions from FA2521-22-B-0011 (Pages: 5)

Attachment 11 - JDMTA As-Built Control Drawing 1

Attachment 12 - JDMTA As-Built Control Drawing 2

Attachment 13 - JDMTA As-Built Control Drawing 3

Attachment 14 - JDMTA As-Built Control Drawing 4

Attachment 15 - JDMTA As-Built Control Drawing 5

Attachment 16 - JDMTA As-Built Control Drawing 6

Attachment 17 - JDMTA As-Built Control Drawing 7

Attachment 18 - JDMTA As-Built Control Drawing 8

Attachment 19 - Drawing 98K00034 dated 20 August 1999 (Pages: 14)

Attachment 20. Question & Answer / Government Response (Pages: 1)

Attachment 21. As Built Drawings Facility 1428 (Pages: 14)

Attachment 22. As Built Drawings Facility 1606 (Pages: 5)

Attachment 23. As Built Drawings Facility 55899 (Pages: 14)

Attachment 24. Estimated Quantity of Devices (Project Number DBEH 22-1580) (Pages: 1)

Attachment 25. Construction Wage Determination (FL 20230001) dated 5 May 2023 (Pages: 8)

FA252123B00030001

IDCode:
Page: 1
Pages: 3
AmendNo: 0001
EffDate: 22 May 2023
ReqNo:
ProjNo: DBEH 22-1580
IssCode: FA2521
AdmCode:
IssuedBy: FA2521 45 CONS LGC

1201 EDWARD H WHITE II ST MS 7200, ADMINISTRATIVE ONLY NO REQUISITIONS

PATRICK AFB, FL 32925-3237

UNITED STATES

Timothy Johnson, Email: timothy.johnson@us.af.mil Telephone: 321-494-5451

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA252123B0003
SolDate: 27 Apr 2023
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle:
ContDate:
CODate:

File details come from the government source that posted it. Updated .