Attachment 6 CECC Form 3052.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
DBEH 22-1580 Replace HVAC Controls Federal contract opportunity
Solicitation number
FA252123B0003
Issued by
Department of the Air Force Space Command

About this file

This solicitation is for a firm fixed price construction contract to replace HVAC controls at five facilities located at Cape Canaveral Space Force Station and Jonathan Dickinson Missile Tracking Annex in Florida. The work includes providing labor, equipment, and materials to replace existing HVAC controls with new automation servers, integrating them into the energy management control system, and developing graphical user interfaces, data logs, and alarms. The estimated value is between $500,000 and $1,000,000. This acquisition is set aside for service-disabled veteran-owned small businesses. The solicitation notes that funding is not presently available and any award would be contingent on appropriated funds becoming available, of which offerors would be notified in writing by the contracting officer. Responses are due in accordance with terms of the solicitation issued by Space Launch Delta 45 of the Department of the Air Force.

View the file

Other files for this federal contract opportunity

Other files attached to DBEH 22-1580 Replace HVAC Controls, newest first.
File Type Posted
FA252123B0003 SF 1409 Abstract.pdf PDF
FA252123B0003 A003.pdf PDF
Attachment 26 WD FL20230001 (20230602).pdf PDF
FA252123B0003 A003.pdf PDF
FA252123B0003 A002.pdf PDF
Attachment 20 QA Government Responses.pdf PDF
Attachment 22 As Built DWG Facility 1606 CCSFS (OEM).pdf PDF
FA252123B0003 A0001.pdf PDF
Attachment 25 WD FL20230001 (202305015).pdf PDF
Attachment 21 As Built DWG Facility 1428 CCSFS (Replace HVAC Fire Protection Elec Dist).pdf PDF
Attachment 23 As Built DWG Facility 55899 CCSFS (SOSF).pdf PDF
Attachment 24 Estimated Quantity of Devices.pdf PDF
23B0003 (DBEH 22-1580) Site Visit Roster.pdf PDF
Attachment 4 GPP Certification (DBEH 22-1580).pdf PDF
Attachment 7 QA Template.docx DOCX document
Attachment 8 Site Visit Rules.pdf PDF
Attachment 12 JDMTA As-Built Control Drawing 2.jpg JPG image
Attachment 19 Drawing 98K00034 (19990820).pdf PDF
FA252123B0003 (DBEH 22-1580).pdf PDF
Attachment 2 WD FL20230001.pdf PDF
Attachment 3 WD FL20230214.pdf PDF
Attachment 10 Answers to Questions from 22B0011.pdf PDF
Attachment 16 JDMTA As-Built Control Drawing 6.jpg JPG image
Attachment 11 JDMTA As-Built Control Drawing 1.jpg JPG image
Attachment 17 JDMTA As-Built Control Drawing 7.jpg JPG image
Attachment 18 JDMTA As-Built Control Drawing 8.jpg JPG image
Attachment 1 SOW DBEH 22-1580 (20230313 (Rev 3)).pdf PDF
Attachment 5 Contractor Hazardous Waste Form.docx DOCX document
Attachment 9 Badge Request Form.pdf PDF
Attachment 13 JDMTA As-Built Control Drawing 3.jpg JPG image
Attachment 14 JDMTA As-Built Control Drawing 4.jpg JPG image
Attachment 15 JDMTA As-Built Control Drawing 5.jpg JPG image
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF3052

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
ERROR:#REF!
PURCHASE REQUEST FORMPROJECT NUMBERWORK LOCATION
DBEH 22-1580
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQUANTITYMANHOURSAVERAGETOTALDIRECTLINE
NO.MEASUREUNITTOTALMANDAYSRATECOSTSTOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

0.000.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.00
0.00
00.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.00
0.000.000.00
0.000.000.00
CECC FORM 3052FOR OFFICIAL USE ONLYPAGE 1
INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient
detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples--square yards--SY, cubic yards--
CY, square feet--SF, linear feet--LF, board feet--BF, each--EA, pound--LB).
Col 3 Quantity. Constractor's estimate of quantity required in terms of unit of measure (couldmn 2). Itms and units of measure will
be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price
contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total costs (Col 5) for items listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in
column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the
contract and of significant dollar value.

Col 10 Line Total. Self-explanatory.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on
the last page as follows.

TOTAL MATERIAL COSTS $

TOTAL LABOR COSTS $

TOTAL OTHER DIRECT COSTS $

TOAL DIRECT COSTS $

OVERHEAD $

SUBTOTAL $

PROFIT $

TOTAL PRICE $

DATE FIRM NAME

TITLEBY
(Signature)
FOR OFICIAL USE ONLY
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of
incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award
of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a
certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3.807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit
with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an
appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that
there be a clear understanding of
a. The existing, verifiable data
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticalbe, the data will be described (with schdules as
appropriate), and made available to the contracting officer or his authorized representative on request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine,
for the purpose of verifying the cost or pricing data submitted, those books, records, documents, and other supporting data which
will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right
may be exercised in connection with any negotiations prior to contract award.
(Reverse of AF Form 3052, Jan 88)
*U.S. GOVERNMENT PRINTING OFFICE: 1988-24D-979:51319

File details come from the government source that posted it. Updated .