Attachment 20 QA Government Responses.pdf

PDF 521 KB Posted

Attached to
DBEH 22-1580 Replace HVAC Controls Federal contract opportunity
Solicitation number
FA252123B0003
Issued by
Department of the Air Force Space Command

About this file

This document contains a federal contract opportunity for replacing HVAC controls at various facilities located at Cape Canaveral Space Force Station and the Jonathan Dickinson Missile Tracking Annex in Florida. The work involves providing labor, equipment, and materials to replace existing HVAC controls with new automation servers at five buildings. Integration with the existing energy management control system is required. The solicitation is for a firm fixed price construction contract between $500,000 to $1,000,000 issued under a competitive service-disabled veteran-owned small business set-aside by the Department of the Air Force Space Command. Offerors must meet the set-aside criteria to be considered for award. The notice indicates that funds are not presently available and the government's obligation is contingent on appropriated funds becoming available, of which offerors will be notified. The government reserves the right to cancel the solicitation before or after the closing date.

View the file

Other files for this federal contract opportunity

Other files attached to DBEH 22-1580 Replace HVAC Controls, newest first.
File Type Posted
FA252123B0003 SF 1409 Abstract.pdf PDF
FA252123B0003 A003.pdf PDF
FA252123B0003 A003.pdf PDF
Attachment 26 WD FL20230001 (20230602).pdf PDF
FA252123B0003 A002.pdf PDF
Attachment 21 As Built DWG Facility 1428 CCSFS (Replace HVAC Fire Protection Elec Dist).pdf PDF
Attachment 23 As Built DWG Facility 55899 CCSFS (SOSF).pdf PDF
Attachment 24 Estimated Quantity of Devices.pdf PDF
Attachment 22 As Built DWG Facility 1606 CCSFS (OEM).pdf PDF
FA252123B0003 A0001.pdf PDF
Attachment 25 WD FL20230001 (202305015).pdf PDF
23B0003 (DBEH 22-1580) Site Visit Roster.pdf PDF
Attachment 11 JDMTA As-Built Control Drawing 1.jpg JPG image
Attachment 17 JDMTA As-Built Control Drawing 7.jpg JPG image
Attachment 18 JDMTA As-Built Control Drawing 8.jpg JPG image
Attachment 4 GPP Certification (DBEH 22-1580).pdf PDF
Attachment 6 CECC Form 3052.xlsx XLSX spreadsheet
Attachment 7 QA Template.docx DOCX document
Attachment 8 Site Visit Rules.pdf PDF
Attachment 12 JDMTA As-Built Control Drawing 2.jpg JPG image
Attachment 19 Drawing 98K00034 (19990820).pdf PDF
Attachment 1 SOW DBEH 22-1580 (20230313 (Rev 3)).pdf PDF
Attachment 5 Contractor Hazardous Waste Form.docx DOCX document
Attachment 9 Badge Request Form.pdf PDF
Attachment 13 JDMTA As-Built Control Drawing 3.jpg JPG image
Attachment 14 JDMTA As-Built Control Drawing 4.jpg JPG image
Attachment 15 JDMTA As-Built Control Drawing 5.jpg JPG image
FA252123B0003 (DBEH 22-1580).pdf PDF
Attachment 2 WD FL20230001.pdf PDF
Attachment 3 WD FL20230214.pdf PDF
Attachment 10 Answers to Questions from 22B0011.pdf PDF
Attachment 16 JDMTA As-Built Control Drawing 6.jpg JPG image
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTION AND ANSWER TEMPLATE

Solicitation: FA252123B0003 Project Number: DBEH 22-1580, ‘Replace HVAC Controls’

Contractor Name: _____________________________

POC: ______________________________________

RFP Section __________ Paragraph _________

SOW/Technical Specification/Drawings paragraph/page ___________

Other (Specify) ___________________________

Question:

Government Response:

RFP Section __________ Paragraph _________

SOW/Technical Specification/Drawings paragraph/page ___________

Other (Specify) ___________________________

Question:

RFP Section __________ Paragraph _________

SOW/Technical Specification/Drawings paragraph/page ___________

Other (Specify) ___________________________

Question:

RJY Group, LLC

Chris Shotwell, chris@rjygroup.net

Regarding the AHU replacements at JDTMA

It's our understanding there is an AHU replacement project either ongoing or set to start at Facility 28001 at JDTMA. What is the contract completion date for this project? Our concern is with the AHU's being down, it may affect the work associated with the VAV boxes.

The other project referenced is still pending funds availability. As a result it is unknown when award will be made and subsequent on site performance. The Government does not anticipate any problems. Additionally the procedures in contract clause FAR 52.236-8 'Other Contracts' will be followed in the event of any conflict.

File details come from the government source that posted it. Updated .