This document contains a federal contract opportunity notice and a related question and answer template. The contract opportunity is a competitive set-aside for a Women-Owned Small Business to provide repair services for three weather stations located at the Kennedy Space Center Complex in Florida. Services include structural repairs to two 54-foot aluminum scaffold towers with guy cables, replacement of lightning protection systems, and replacement of a wooden pole with a new concrete pole. The estimated value is between $500,000 and $1 million. The solicitation number is FA252121B0017 and will be available on July 13th, 2021 with bids due by August 12th, 2021. The performance period will be 150 calendar days beginning 10 days after notice to proceed. The award will be determined by lowest price among responsible bidders. The question and answer template relates to a prior project and contains a question and response regarding concrete foundation installation for a utility pole.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION AND ANSWER TEMPLATE
Solicitation: FA252121B004 Project Number: DBEH 20-1515
Project Description: Construct Utilities Flight Control Road Cape Canaveral SFS, FL
Contractor Name: __Yerkes South- Maverick Constructors JV, LLC___________________________
POC: _Ralph Kennedy_____________________________________
RFP Section __________ Paragraph _________
SOW/Technical Specification/Drawings paragraph/page ___________
Other (Specify) ___________________________
Question: __Sh. S-300 shows suspending the new pole to place concrete underneath it. It is going to be almost impossible to hold a pole this high and heavy plum, then have to keep it plum while the concrete cures. We suggest modifying this to a 5 ft. diameter hole, setting the pole at the bottom and filling with #57 Stone & add 2 feet of concrete at the top.___
Government Response: Full designed concrete foundation required to achieve structural requirements.
This requirement has been met successfully on several previous identical construction projects. The pole does not need to be temp supported until design strength is reached, contractor means and methods to determine holding time. Other methods such as offset anchoring may be used.