Attchment 1b-Appendix E SAM.xlsx
XLSX spreadsheet 53 KB Posted
- Attached to
- Environmental Support Contract (ESC III) Federal contract opportunity
- Solicitation number
- FA2521-12-R-0001
About this file
Attchment 1b-Appendix E SAM
View the file
Other files for this federal contract opportunity
Show all 50
Environmental Support Contract (ESC III) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAFB
| ATTACHMENT 1b APPENDIX E SAM | |||||||||
| NOTE: Total number of samples provided in this informational spreadsheet does not take into account QA/QC checks or blanks required by FDEP SOP. | |||||||||
| Program | Description | Parameter | Number of Sites | Sample Frequency | Total Number of Samples per year | Sampled by | Analyzed by | Requirement From | Comments |
| Potable Water | FDEP Regulatory Requirements | Microbiological (Bacte) | 11 | Monthly | 132 | Bioenvironmental | SAM Contractor | FDEP ID 3054128 | |
| Asbestos | 1 | Every 9 years (Due in 2020 and every 9 years after) | 1 (Only every 9 years) | SAM Contractor | SAM Contractor | FDEP ID 3054128 | Sampled only every 9 years. | ||
| Lead & Copper | 24 | Every 3 years (Due 2012 and every 3 years after) | 26 | SAM Contractor | SAM Contractor | FDEP ID 3054128 | Sampled only every 3 years. 26 total samples; 24 plus 2 additional if needed. | ||
| Stage 1 HAA5 | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FDEP ID 3054128 | Requirement will end 1st Quarter CY2012 (Stage 2 will commence) | ||
| Stage 2 HAA5 | 2 | Quarterly | 8 | SAM Contractor | SAM Contractor | FDEP ID 3054128 | Beginning in 2nd Quarter CY2012 | ||
| Stage 1 Trihalomethanes | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FDEP ID 3054128 | Requirement will end 1st Quarter CY2012 (Stage 2 will commence) | ||
| Operational Incoming Trihalomethanes | 1 | Bi-weekly | 34 | SAM Contractor | SAM Contractor | FDEP ID 3054128 | Additional 8 operational samples | ||
| Stage 2 Trihalomethanes | 2 | Quarterly | 10 | SAM Contractor | SAM Contractor | FDEP ID 3054128 | 10 total samples; 8 plus 2 additional if needed. Beginning in 2nd Quarter CY2012 |
Potable Water Child Dev Cntr + Youth Center Microbiological (Bacte) 2 Monthly 24 Bioenvironmental SAM Contractor AFI 34-248/249 & 48-144
Potable Water Planned Outages/Malfunctions Microbiological (Bacte) Variable As needed 270 Bioenvironmental SAM Contractor FDEP ID 3054128 CEOFI estimate 45 outages per year.
| Potable Water (Non-PWS) | Swimming Pools | Heterotrophic Plate Count (HPC) | 2 | Prior to Pool Openings | 10 | Bioenvironmental | SAM Contractor | AFOSHSTD 48-14 |
| Fecal Coliform (FC) | 2 | Prior to Pool Openings | 10 | Bioenvironmental | SAM Contractor | AFOSHSTD 48-14 |
| Domestic Wastewater | POTW requirements LS# 650 | Arsenic | 1 | Annual | 1 | SAM Contractor | SAM Contractor | City of Cocoa Beach Ord 1370 & Wastewater Discharge Permit 0004 | 24 hr composite sample for all parameters |
| Cadmium | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| Chromium (total) | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| Copper | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| Lead | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| Mercury | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| Nickel | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| Molybdenum | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| Selenium | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| silver | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| Zinc | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| BOD5 | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| TKN | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| VOC's | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| Oil & Grease | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| Phenol | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| Cyanide | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| TSS | 1 | Annual | 1 | SAM Contractor | SAM Contractor | ||||
| TP | 1 | Annual | 1 | SAM Contractor | SAM Contractor |
| Stormwater - NPDES Outfalls | Sector Q - NPDES Outfall (Outdoor Recreation) | Aluminum | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FLR05A948 |
| Iron | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FLR05A948 | ||
| Lead | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FLR05A948 | ||
| Zinc | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FLR05A948 | ||
| Sector N - NPDES Outfall (Recycling Center) | COD | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FLR05A948 | |
| TSS | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FLR05A948 | ||
| Aluminum | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FLR05A948 | ||
| Copper | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FLR05A948 | ||
| Iron | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FLR05A948 | ||
| Lead | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FLR05A948 | ||
| Zinc | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FLR05A948 | ||
| Sector Q - NPDES Outfall (Marina) | Aluminum | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FLR05A948 | |
| Iron | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FLR05A948 | ||
| Lead | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FLR05A948 | ||
| Zinc | 1 | Quarterly | 4 | SAM Contractor | SAM Contractor | FLR05A948 | ||
| NPDES OUTFALLS | Visual Examination | 3 | Quarterly | 12 | SAM Contractor | SAM Contractor | FLR05A948 |
| Ground Water | CUP | Chlorides | 2 | Annually (May) | 2 | SAM Contractor | SAM Contractor | CUP #1733 | (4084 SJRWMD ID# 4696 and 452 SJRWMD ID# 4725) |
| Flowmeter reading | 26 | monthly | 312 | SAM Contractor | SAM Contractor | CUP #1733 | |||
| ATTACHMENT 1b | |||||||||
| APPENDIX E SAM |
&"Arial,Bold"&12PAFB Compliance SAM Requirements
&"Arial,Bold"&12PAFB Compliance SAM Requirements
&"Arial,Bold"&12PAFB Compliance SAM Requirements
&"Arial,Bold"&12PAFB Compliance SAM Requirements
&"Arial,Bold"&12PAFB Compliance SAM Requirements
&"Arial,Bold"&12PAFB Compliance SAM Requirements
&"Arial,Bold"&12PAFB Compliance SAM Requirements
&"Arial,Bold"&12PAFB Compliance SAM Requirements
&"Arial,Bold"&12PAFB Compliance SAM Requirements
&"Arial,Bold"&12PAFB Compliance SAM Requirements
&"Arial,Bold"&12PAFB Compliance SAM Requirements
&"Arial,Bold"&12PAFB Compliance SAM Requirements
&P of &N
&P of &N
&P of &N
&P of &N
&P of &N
&P of &N
&P of &N
&P of &N
&P of &N
&P of &N
&P of &N
&P of &N
CCAFS
| NOTE: Total number of samples provided in this informational spreadsheet does not take into account QA/QC checks or blanks required by FDEP SOP. | |||||||||
| Program | Description | Parameter | Number of Sites | Sample Frequency | Total Number of Samples per yr | Sampled by | Analyzed by | Requirement From | COMMENTS |
| Potable Water | Potable Water | Microbiological (Bacte) | 13 | monthly | 162 | SAM Contractor | SAM Contractor | FDEP ID # 3054140 | Includes 6 additional operational samples per yr |
| Asbestos | 1 | Every 9 years (Due in 2013 and every 9 years after) | 1 | SAM Contractor | SAM Contractor | Sampled only every 9 years. | |||
| Lead & Copper | 40 | Every 3 years (Due 2012 and every 3 years after). | 42 | SAM Contractor | SAM Contractor | FDEP ID # 3054140 | Sampled only every 3 years. 42 total samples; 40 plus 2 additional if needed. |
| Potable Water | Potable Water | Stage 1 HAA5 | 2 | Quarterly | 8 | SAM Contractor | SAM Contractor | FDEP ID 3054140 | |
| Stage 2 HAA5 | 2 | Quarterly | 8 | SAM Contractor | SAM Contractor | FDEP ID 3054140 | Beginning in 2nd Quarter CY2012 | ||
| Stage 1 Trihalomethanes | 2 | Quarterly | 8 | SAM Contractor | SAM Contractor | FDEP ID 3054140 | Requirement will end 1st Quarter CY2012 (Stage 2 will commence) | ||
| Operational Incoming Trihalomethanes | 1 | Bi-weekly | 34 | SAM Contractor | SAM Contractor | FDEP ID 3054140 | 34 total samples; 26 plus 8 additional if needed | ||
| Stage 2 Trihalomethanes | 2 | Quarterly | 10 | SAM Contractor | SAM Contractor | FDEP ID 3054140 | 10 total samples; 8 plus 2 additional if needed. Beginning in 2nd Quarter CY2012 |
| Wastewater | Groundwater Monitoring | Nitrate (as N) | 9 | quarterly | 52 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | 52 total samples; 36 plus 16 additional if needed. Total of 15 monitoring wells for WWTF, 6 of which are for water level only. |
| TDS | 9 | quarterly | 36 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | |||
| Chloride | 9 | quarterly | 36 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | |||
| Fecal Coliform | 9 | quarterly | 36 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | |||
| pH | 9 | quarterly | 36 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | |||
| Sodium | 9 | quarterly | 36 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | |||
| Turbidity | 9 | quarterly | 36 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | |||
| Water Level | 15 | quarterly | 60 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | |||
| Manganese | 9 | quarterly | 36 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 |
| Wastewater | Reclaimed Water-effluent | Primary & Secondary standards:Inorganics-11 parameters | 1 | annual | 1 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 |
| (WWTF) | Volatile Organics-10 parameters | 1 | annual | 1 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | |
| THMs-1 parameter | 1 | annual | 1 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | ||
| Organics-6 parameters | 1 | annual | 1 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | ||
| Secondary-9 parameters | 1 | annual | 1 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | ||
| Radiological-2 parameters | 1 | annual | 1 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 |
| Wastewater | Domestic Residuals at WWTF | Arsenic | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 |
| Cadmium | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | ||
| Cu | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | ||
| Pb | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | ||
| Hg | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | ||
| Mo | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | ||
| Ni | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | ||
| Se | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | ||
| Zn | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 | ||
| PCB | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | FDEP Permit FL0102920-006 |
| Stormwater - NPDES Outfalls | Sector Q - Air Force Wharf Outfalls | Aluminum | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 |
| Iron | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | ||
| Lead | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | ||
| Zinc | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | ||
| Sector Q - Poseidon Wharf Outfalls | Aluminum | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | |
| Iron | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | ||
| Lead | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | ||
| Zinc | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | ||
| Sector Q - Trident Wharf Outfalls | Aluminum | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | |
| Iron | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | ||
| Lead | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | ||
| Zinc | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | ||
| Sector N - DRMO Outfalls | Aluminum | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | |
| Iron | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | ||
| Lead | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | ||
| Zinc | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | ||
| COD | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | ||
| TSS | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | ||
| Copper | 1 | quarterly | 4 | SAM Contractor | SAM Contractor | NPDES FLR05A947 | ||
| NPDES Outfalls | Visual Examination | 9 | quarterly | 36 | SAM Contractor | SAM Contractor | NPDES FLR05A947 |
Groundwater (CUP) Read well flow meter at Pump Station Number 1 Flow 1 monthly 12 SAM Contractor SAM Contractor SJRWMD Permit 68914 ESC prepares SJRWMD report for 5 permitted wells. Flows from 4 provided by IOMSC.
| Landfill Surface Water (C&D and Closure permits) | Surface Water Sampling | Temp, DO, pH, Spec Cond, Turbidity | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | FDEP permits SO05-0026050-006 (C&D) and SF05-0026050-005 (closure) |
| 4 surface water sampling sites | un-ionized Ammonia as N | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | ||
| TSS | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| BOD 5 day | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| COD | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| NOX-nitrate and nitrite | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Total Phosphorous | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| chlorophyll A | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Fe | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Hg | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Al | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Sb | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| As | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Ba | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Be | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Cd | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Cr | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Co | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Cu | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Pb | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Ni | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Se | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Ag | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Tl | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| V | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| Zn | 4 | semiannual | 8 | SAM Contractor | SAM Contractor | |||
| 40 CFR 258 Appendix 1 parameters-47 parameters | 4 | semiannual | 8 | SAM Contractor | SAM Contractor |
| Landfill Groundwater | Ground Water Sampling | Temp, DO, pH, Spec Cond, Turbidity | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | FDEP permits SO05-0026050-006 (C&D) and SF05-0026050-005 (closure) |
| Ammonia | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Bicarbonate | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| TOC | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| chlorides | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| TDS | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Nitrate | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Sulfate | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Phenols | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Al | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| As | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Cd | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Cr | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Cu | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Pb | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Fe | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Hg | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Na | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Ni | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Sb | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Ba | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Be | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Co | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Se | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Ag | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Tl | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| V | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Zn | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| 40 CFR 258 Appendix 1 parameters | 22 | semiannual | 46 | SAM Contractor | SAM Contractor | |||
| Water Level | 26 | semiannual | 52 | SAM Contractor | SAM Contractor | |||
| Total Water Depth | 26 | semiannual | 52 | SAM Contractor | SAM Contractor |
CCAFS Landfill Gas Methane Gas Monitoring Combustible Gas 5 quarterly 20 SAM Contractor SAM Contractor FDEP permit SF05-0026050-005 (closure)
| EOD Thermal Treatment Unit Groundwater | Groundwater Monitoring | HMX | 6 wells | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit 0070725-HO-005 |
| Permit condition is to sample for four consecutive days semiannually. | RDX | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | |
| 1,3,5-trinitrobenzene | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| methyl-2,4,6-trinitrophenylnitramine | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| 1,3-dinitrobenzene | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| nitrobenzene | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| 2,4,6-trinitrotoluene | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| 4-amino-2,6-dinitrotoluene | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| 2-amino-4,6-dinitrotoluene | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| 2,4-dinitrotoluene | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| 2,6-dinitrotoluene | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| 2-nitrotoluene | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| 3-nitrotoluene | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| 4-nitrotoluene | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| PETN | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| nitroglycerin | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| nitrate | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| nitrite | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| sulfate | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| diethyl phthalate | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| aluminum | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| arsenic | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| barium | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| cadmium | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| chromium | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| copper | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| lead | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| magnesium | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| potassium | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| selenium | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| vanadium | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| titanium | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| conductivity, pH, turbidity, temp, depth to water | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| perchlorate | 6 | semiannual | 12 | SAM Contractor | SAM Contractor | FDEP Permit | ||
| Well depth each November | 6 | Annual | 6 | SAM Contractor | SAM Contractor | FDEP Permit |
| EOD Thermal Treatment Unit Soil (Open Detonation Area) | Soil Monitoring | HMX | 5 | annually | 5 | SAM Contractor | SAM Contractor | FDEP Permit 0070725-HO-005. Permit required sampling changed per FDEP letter dated 9 Aug 11. | Sampling sites located on the N,S, E,W and center of the detonation area . |
| RDX | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| 1,3,5-trinitrobenzene | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| methyl-2,4,6-trinitrophenylnitramine | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| 1,3-dinitrobenzene | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| nitrobenzene | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| 2,4,6-trinitrotoluene | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| 4-amino-2,6-dinitrotoluene | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| 2-amino-4,6-dinitrotoluene | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| 2,4-dinitrotoluene | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| 2,6-dinitrotoluene | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| 2-nitrotoluene | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| 3-nitrotoluene | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| 4-nitrotoluene | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| PETN | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| nitroglycerin | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| nitrate | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| nitrite | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| sulfate | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| diethyl phthalate | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| aluminum | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| arsenic | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| barium | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| cadmium | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| chromium | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| copper | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| lead | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| magnesium | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| potassium | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| selenium | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| titanium | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| vanadium | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| Tetryl | 5 | annually | 5 | SAM Contractor | SAM Contractor | ||||
| perchlorate | 5 | annually | 5 | SAM Contractor | SAM Contractor |
EOD Thermal Treatment Unit Soil (Open Detonation Area) Soil Monitoring perchlorate 5 per event as required 10 SAM Contractor SAM Contractor Per FDEP letter responding to May 2010 Well Sampling Report. When treatment of device(s) containing perchlorate conducted. Sampling sites located on the N, S, E, W crater walls and one center bottom. Estimated 2 open detonation events per year.
&"Arial,Bold"&12CCAFS Compliance SAM Requirements
&"Arial,Bold"&12CCAFS Compliance SAM Requirements
&"Arial,Bold"&12CCAFS Compliance SAM Requirements
&"Arial,Bold"&12CCAFS Compliance SAM Requirements
&"Arial,Bold"&12CCAFS Compliance SAM Requirements
&"Arial,Bold"&12CCAFS Compliance SAM Requirements
&"Arial,Bold"&12CCAFS Compliance SAM Requirements
&"Arial,Bold"&12CCAFS Compliance SAM Requirements
&"Arial,Bold"&12CCAFS Compliance SAM Requirements
&"Arial,Bold"&12CCAFS Compliance SAM Requirements
&"Arial,Bold"&12CCAFS Compliance SAM Requirements
&"Arial,Bold"&12CCAFS Compliance SAM Requirements
Shiloh Radar Station
| NOTE: Total number of samples provided in this informational spreadsheet does not take into account QA/QC checks or blanks required by FDEP SOP. | |||||||||
| Program | Description | Parameter | Number of Sites | Sample Frequency | Number of Samples per yr | Sampled by | Analyzed by | Requirement From | Comments |
| Potable Water | GPN-30 Shiloh Radar Station | Microbiological (Bacte) | 1 | annual | 1 | SAM Contractor | SAM Contractor | Volusia County Health Dept. limited use commercial registered public supply system-Permit # 64-57-1077994. 1 bactee sample collected within 365 days of the last sample collected. Results sent to Volusia Co within 15 days of sample analyses results. |
&"Arial,Bold"&12Shiloh Radar Station Compliance SAM Requirements
File details come from the government source that posted it. Updated .