AF Form 332.pdf

PDF 127 KB Posted

Attached to
Environmental Support Contract (ESC III) Federal contract opportunity
Solicitation number
FA2521-12-R-0001
Issued by
Department of the Air Force Space Command

About this file

AF Form 332.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Environmental Support Contract (ESC III), newest first.
File Type Posted
RFP Q A 6.docx DOCX document
12-R-0001 ESC Pre-Proposal Conference Mins.pdf PDF
RFP Q A 3.docx DOCX document
12-R-0001 Pre-Proposal Min Attach 1 Attendee List.pdf PDF
ESC III Pre-Proposal Conference Slides —
FA2521-12-R-0001 U0001 ESC III Amendment 1 Mod Doc.rtf RTF text file
Attachment 2-Rev 1Pricing Worksheet Bid Schedule.xlsx XLSX spreadsheet
Other Instructions_Manuals.docx DOCX document
RFP Q A 2.docx DOCX document
2009 PAFB Biennial Report 20100324.pdf PDF
2009 CCAFS Biennial Report 20100324.pdf PDF
AF Form103.pdf PDF
LTR HEAD.pdf PDF
Quarterly HazWaste Metrics.pdf PDF
FINAL_Cov Ltr.PDF PDF
APP_I-1.PDF PDF
App. A-1.PDF PDF
APP_H-1.PDF PDF
Cov_Ltr.PDF PDF
Pmt_SOB.pdf PDF
FINAL_Cov_Ltrsigned.pdf PDF
FINAL_Cov_Ltr.pdf PDF
Cov_Ltr_07signed.pdf PDF
App A-1.pdf PDF
CCAFS NPDES MSGP Permit.pdf PDF
CCAFS Regional Domestic Wastewater Operating Permit.pdf PDF
RCRA Operating Permit CCAFS 4Feb10.pdf.pdf PDF
CCAFS Landfill Closure Permit.pdf PDF
Tab M 45SW Final Wildland Fire Management Plan_formatted.pdf PDF
Tab G Pest Management.pdf PDF
Tab D-2 Florida Scrub-jay Manag Plan.pdf PDF
Tab B Wetland and Floodplain Mgmt.pdf PDF
Tab C Coastal and Marine Resources.pdf PDF
Tab H Outdoor Recreation.pdf PDF
Tab L OPLAN 91-212 BASH Plan.pdf PDF
Tab F Forestry and Urban Forestry.pdf PDF
Tab P Training Education Outreach.pdf PDF
Tab N Cooperative Agreements and Permits.pdf PDF
Tab D-1 Sea Turtle Management Plan.pdf PDF
Attachment 2-Pricing Worksheet Bid Schedule.xlsx XLSX spreadsheet
Attachment 4-DD254 ESC III Planning.pdf PDF
Attachment 8-Proposal Worksheet Bid Schedule.xlsx XLSX spreadsheet
Attachment 9-Sample Consent Letter.docx DOCX document
Attachment 5-PEQ COVER LETTER.docx DOCX document
Attachment 3-SCA Wage Determination 6-13-11.pdf PDF
Attachment 7-CCAFS LMU Map.docx DOCX document
Attachment 1a-Items List.xlsx XLSX spreadsheet
Attachment 1 PWS - ESCIII 6 Feb.docx DOCX document
RFP Q A 1.docx DOCX document
FBO NOTICE.docx DOCX document
Show all 50

Environmental Support Contract (ESC III) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This is a web-optimized version of this form.

Download the original, full version:

www.usa-federal-forms.com/download.html

Convert any form into fillable, savable:

www.fillable.com

Learn how to use fillable, savable forms:

Demos: www.fillable.com/demos.html

Examples: www.fillable.com/examples.html

Browse/search 10's of 1000's of U.S. federal forms converted into fillable, savable:

www.usa-federal-forms.com

BASE CIVIL ENGINEER WORK REQUEST

(See Reverse for Instructions) OMB No. 0704-0188

Form Approved

Public reporting burden for this collection of information is estimated to average .3 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 0704-0188, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses.

Send your completed form to HQ AFESC/DEMG.

SECTION I - TO BE COMPLETED BY REQUESTER

1. FROM (Organization)

SYMBOL

2. OFFICE 3. DATE OF REQUEST 4. WORK REQUEST NO. (For BCE Use)

5. NAME AND PHONE NO. OF REQUESTER 6. REQUIRED COMPLETION DATE 7. BUILDING, FACILITY OR STREET ADDRESS

WHERE WORK IS TO BE ACCOMPLISHED

8. DESCRIPTION OF WORK TO BE ACCOMPLISHED (Include Sketch or Plan, when appropriate)

9. BRIEF JUSTIFICATION FOR WORK TO BE ACCOMPLISHED (Not required for maintenance and repair)

10. DONATED RESOURCES

FUNDS LABOR MATERIAL CONTRACT BY REQUESTER NONE

11. NAME OF REQUESTER 12. GRADE OF REQUESTER 13. SIGNATURE OF REQUESTER (See Reverse of Form)

14. COORDINATION

SECTION II - FOR BASE CIVIL ENGINEER USE

15. WORK ORDER (Place an "X" in the appropriate box.)

IN-SERVICE SELF-HELP CONTRACT SABER

16. DIRECT SCHEDULED WORK (Place an "X" in the appropriate box.)

EMERGENCY URGENT ROUTINE SELF-HELP M/C

17. SELF-HELP (Place an "X" in the appropriate box.)

BRIEFING REQUIRED ADEQUATE COORDINATION INSPECTION REQUIRED

SECTION III - COMPLETE ONLY IF WORK IS TO BE ACCOMPLISHED BY WORK ORDER

18. WORK CLASS 19. PRIORITY 20. ESTIMATED HOURS 21. ESTIMATED FUNDED

COST

22. ESTIMATED TOTAL

COST

ASSESSMENT (AFR 19-2)

23.

THERE IS NO NEED FOR AN ENVIRONMENTAL

BEING/HAS BEEN PROCESSED

24.

A WRITTEN ASSESSMENT IS APPROVED

25. 26.

DISAPPROVED

27. REMARKS

SECTION IV - APPROVING AUTHORITY

28. NAME AND GRADE (Please Type or Print) 29. SIGNATURE 30. DATE

AF IMT 332, 19910101, V4 PREVIOUS EDITION IS OBSOLETE. MASTER FILE COPY

AllFormsImprovedDotCom:
4563:

File details come from the government source that posted it. Updated .