Pmt_SPC.PDF

PDF 139 KB Posted

Attached to
Environmental Support Contract (ESC III) Federal contract opportunity
Solicitation number
FA2521-12-R-0001
Issued by
Department of the Air Force Space Command

About this file

Pmt_SPC.PDF

View the file

Other files for this federal contract opportunity

Other files attached to Environmental Support Contract (ESC III), newest first.
File Type Posted
RFP Q A 6.docx DOCX document
12-R-0001 ESC Pre-Proposal Conference Mins.pdf PDF
RFP Q A 3.docx DOCX document
12-R-0001 Pre-Proposal Min Attach 1 Attendee List.pdf PDF
FA2521-12-R-0001 U0001 ESC III Amendment 1 Mod Doc.rtf RTF text file
RFP Q A 2.docx DOCX document
AF Form 332.pdf PDF
2009 PAFB Biennial Report 20100324.pdf PDF
45 SW HazWaste 25 Reduction Candidate Waste Stream Blank.pdf PDF
Existing Environmental Databases Screen Shots 20120203.pdf PDF
2009 CCAFS Biennial Report 20100324.pdf PDF
AF Form103.pdf PDF
FINAL_Cov Ltr.PDF PDF
APP_I-1.PDF PDF
App. A-1.PDF PDF
0090005-010-avf.pdf PDF
Pmt_SOB.PDF PDF
APP_U-1.PDF PDF
APP_H-1.PDF PDF
Pmt_SOB.pdf PDF
FINAL_Cov_Ltrsigned.pdf PDF
FINAL_Cov_Ltr.pdf PDF
SP_CND_07.pdf PDF
APP_H-1.pdf PDF
APP_I-1.pdf PDF
Cov_Ltr_07signed.pdf PDF
App A-1.pdf PDF
2011 DW Monitoring Requirements.pdf PDF
Example State Stormwater Permits —
CCAFS NPDES MSGP Permit.pdf PDF
Tab M 45SW Final Wildland Fire Management Plan_formatted.pdf PDF
Tab G Pest Management.pdf PDF
Tab D-2 Florida Scrub-jay Manag Plan.pdf PDF
Tab B Wetland and Floodplain Mgmt.pdf PDF
Tab C Coastal and Marine Resources.pdf PDF
Tab E Agricultural Outgrants.pdf PDF
Tab D-3 Scrub Habitat Restoration Plan.pdf PDF
Tab I Conservation Law Enforcement.pdf PDF
Tab K 45SW ISMP.pdf PDF
Tab D Threatened and Endangered Species.pdf PDF
Tab H Outdoor Recreation.pdf PDF
Tab L OPLAN 91-212 BASH Plan.pdf PDF
Attachment 2-Pricing Worksheet Bid Schedule.xlsx XLSX spreadsheet
Attachment 6-ESC III Past Perf Questionnaire 2 Dec 11.docx DOCX document
ESC III Solicitation —
Attachment 4-DD254 ESC III Planning.pdf PDF
Attachment 8-Proposal Worksheet Bid Schedule.xlsx XLSX spreadsheet
Attachment 9-Sample Consent Letter.docx DOCX document
Attachment 5-PEQ COVER LETTER.docx DOCX document
FBO NOTICE.docx DOCX document
Show all 50

Environmental Support Contract (ESC III) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Air Force FINAL Permit No.: 0090005-010-AV Cape Canaveral Air Force Station

Section I. Facility Information.

Subsection A. Facility Description.

This is a military facility that contains the following emission units:

a) Eight Steam Boilers as follows:

- CCAFS Boiler #1 (Donlee Technology)

- CCAFS Boiler #2 (Donlee Technology)

- CCAFS Boiler #3 (Cleaver Brooks)

- CCAFS Boiler #4 (Cleaver Brooks)

- CCAFS Boiler #5 (Portable)

- CCAFS Boiler #6 (Portable)

- CCAFS Boiler #7 (Donlee Technology)

- CCAFS Boiler #8 (Donlee Technology)

b) CCAFS Solvent Sinks Set #1 and Five Paint Spray Booths as follows:

- CCAFS Solvent Sink Set #1 used for cleaning and preparation of small parts and tools equipped with a single hood.

- CCAFS Paint Spray Booth #1 equipped with dry paint filters

- CCAFS Paint Spray Booth #2 equipped with a waterfall

- CCAFS Paint Spray Booth #3 equipped with dry paint filters

- CCAFS Paint Spray Booth #4 equipped with dry paint filters

- CCAFS Paint Spray Booth #5 equipped with dry paint filter

c) Abrasive Blasting as follows:

- CCAFS Abrasive Blasting Yard #1

- CCAFS Abrasive Blasting Yard #2

- CCAFS Abrasive Blasting Yard #3

- CCAFS Abrasive Blasting Yard #4

- CCAFS Abrasive Blasting Booth #1

d) Engine Driven Chiller as follows:

- CCAFS Engine Driven Chiller #1 fueled by natural gas

e) One Jet Kerosene (RP-1) Storage Tank (28,000 gal. AST)

f) IC Engines and Generators as follows:

- CCAFS IC Engines and Generators using no. 2 diesel fuel

Also included in this permit are miscellaneous insignificant and unregulated emission units and/or activities.

Based on the Title V permit renewal application received May 18, 2006, this facility is not a major source of hazardous air pollutants (HAPs).

Subsection B. Summary of Emissions Unit ID No(s). and Brief Description(s).

E.U. ID No./Brief Description

009 CCAFS Boiler # 1 (Donlee Technology) 010 CCAFS Boiler # 2 (Donlee Technology) 019 CCAFS Boiler #3 (Cleaver Brooks) 020 CCAFS Boiler #4 (Cleaver Brooks) 038 CCAFS Boiler #5 (Portable) 040 CCAFS Boiler #6 (Portable) 053 CCAFS Boiler #7 (Donlee Technology) 054 CCAFS Boiler #8 (Donlee Technology) 015 CCAFS Solvent Sink Set #1 018 CCAFS Paint Spray Booth #1 equipped with dry paint filters.

051 CCAFS Paint Spray Booth #2 equipped with a waterfall.

016 CCAFS Paint Spray Booth #3 equipped with dry paint filters.

017 CCAFS Paint Spray Booth #4 equipped with dry paint filters.

052 CCAFS Paint Spray Booth #5 equipped with dry paint filters.

044 CCAFS Abrasive Blasting Yard #1 045 CCAFS Abrasive Blasting Yard #2 046 CCAFS Abrasive Blasting Yard #3 064 CCAFS Abrasive Blasting Yard #4 052 CCAFS Abrasive Blasting Booth #1 058 CCAFS Engine Driven Chiller #1 fueled by natural gas 062 CCAFS IC Engine and Generators using no. 2 diesel fuel 065 CCAFS Jet Kerosene (RP-1) Storage Tank (28,000 gal. AST)

Please reference the Permit No., Facility ID No., and appropriate Emissions Unit(s) ID No(s). on all correspondence, test report submittals, applications, etc.

Subsection C. Relevant Documents.

The documents listed below are not a part of this permit, however, are specifically related to this permitting action.

These documents are provided to the permittee for information purposes only:

Appendix A-1, Abbreviations, Acronyms, Citations, and Identification Numbers Appendix H-1, Permit History/ID Number Changes Statement of Basis

These documents are on file with permitting authority:

Initial Title V Permit Application received June 3, 1996.

Additional information requested November 5, 1997.

Additional information received February 25, 1998.

Additional information requested March 9, 1998.

Additional information received June 10, 1998.

Air Construction Permit Application/Title V Air Operation Permit Revision Application received October 25, 1999.

Additional information requested November 23, 1999.

Additional information received December 9, 1999.

Renewal Title V permit application received July 27, 2001.

Title V permit renewal application received May 18, 2006.

Section II. Facility-wide Conditions.

The following conditions apply facility-wide:

1. APPENDIX TV-6, TITLE V CONDITIONS, is a part of this permit.

2. General Pollutant Emission Limiting Standards. Objectionable Odor Prohibited. The permittee shall not cause, suffer, allow, or permit the discharge of air pollutants, which cause or contribute to an objectionable odor.

[Rule 62-296.320(2), F.A.C.]

3. General Particulate Emission Limiting Standards. General Visible Emissions Standard.

Except for emissions units that are subject to a particulate matter or opacity limit set forth or established by rule and reflected by conditions in this permit, no person shall cause, let, permit, suffer or allow to be discharged into the atmosphere the emissions of air pollutants from any activity, the density of which is equal to or greater than that designated as Number 1 on the Ringelmann Chart (20 percent opacity).

[Rule 62-296.320(4)(b)1., F.A.C.]

4. Prevention of Accidental Releases (Section 112(r) of CAA).

a) The permittee shall submit its Risk Management Plan (RMP) to the Chemical Emergency Prepardness and Prevention Office (CEPPO) RMP Reporting Center when, and if, such requirement becomes applicable. Any Risk Management Plans, original submittals, revisions or updates to submittals, should be sent to:

RMP Reporting Center Post Office Box 1515

Lanham-Seabrook, MD 20703-1515 Telephone: 301/429-5018

b) The permittee shall submit to the permitting authority Title V certification forms or a compliance schedule in accordance with Rule62-213.440(2), F.A.C.

[40 CFR 68]

5. Insignificant Emissions Units and/or Activities. Appendix I-1, List of Insignificant Emissions Units and/or Activities, is a part of this permit.

[Rules 62-213.440(1), 62-213.430(6), and 62-4.040(1)(b), F.A.C.]

6. Unregulated Emissions Units and/or Activities. Appendix U-1, List of Unregulated Emissions Units and/or Activities, is a part of this permit.

7. General Pollutant Emission Limiting Standards. Volatile Organic Compounds (VOC) Emissions or Organic Solvents (OS) Emissions. The permittee shall allow no person to store, pump, handle, process, load, unload or use in any process or installation, volatile organic compounds (VOC) or organic solvents (OS) without applying known and existing vapor emission control devices or systems deemed necessary and ordered by the Department. To comply, procedures to minimize pollutant emissions shall include the following:

a) tightly cover or close all VOC containers when they are not in use,

b) tightly cover, where possible, all open troughs, basins, baths, tanks, etc. when they are not in use,

c) maintain all piping, valves, fittings, etc. in good operating condition,

d) prevent excessive air turbulence across exposed VOC's,

e) immediately confine and clean up spills of VOC containing materials.

[Rule 62-296.320(1)(a), F.A.C.]

8. Emissions of Unconfined Particulate Matter. Reasonable precautions to prevent emissions of unconfined particulate matter at this facility include:

a. Chemical or water application to unpaved roads and unpaved yard areas;

b. Paving and maintenance of roads, parking areas and yards;

c. Landscaping or planting of vegetation; and

d. Other techniques, as necessary.

[Rule 62-296.320(4)(c)2., F.A.C.]

9. When appropriate, any recordings, monitoring, or reporting requirements that are time-specific shall be in accordance with the effective date of the permit, which defines day one.

[Rule 62-213.440, F.A.C.]

10. The permittee shall submit all compliance-related notifications and reports required of this permit to the air compliance section of this office:

Florida Department of Environmental Protection 3319 Maguire Blvd., Suite 232

Orlando, Florida 32803 Telephone: 407/893-3336; Fax: 407/897-5963

11. Any reports, data, notifications, certifications, and requests required to be sent to the United States Environmental Protection Agency, Region 4, should be sent to:

United States Environmental Protection Agency Region 4

Air, Pesticides & Toxics Management Division Air & EPCRA Enforcement Branch, Air Compliance Section

61 Forsyth Street Atlanta, Georgia 30303-8960

Telephone: 404/562-9155 Fax: 404/562-9163

12. Annual Statement of Compliance. The annual statement of compliance pursuant to Rule 62- 213.440(3)(a)2., F.A.C., shall be submitted to the Department and EPA within 60 (sixty) days after the end of the calendar year using DEP Form No. 62-213.900(7), F.A.C.

[Rules 62-213.440(3) and 62-213.900, F.A.C.] {Permitting note: This condition implements the requirements of Rules 62-213.440(3)(a)2.&3., F.A.C. (see Condition 51 of APPENDIX TV-6, TITLE V CONDITIONS)}

13. Annual Operating Report. A DEP Form No. 62-210.900(5), "Annual Operating Report for Air Pollutant Emitting Facility", including the Emissions Report, shall be completed for each calendar year, on or before March 1 of the following year and submitted to the air compliance section of this office. [Rule 62-210.370(3), F.A.C.]

14. Certification by Responsible Official (RO). In addition to the professional engineering certification required for applications by Rule 62-4.050(3), F.A.C., any application form, report, compliance statement, compliance plan and compliance schedule submitted pursuant to Chapter 62-213, F.A.C., shall contain a certification signed by a responsible official that, based on information and belief formed after reasonable inquiry, the statements and information in the document are true, accurate, and complete. Any responsible official who fails to submit any required information or who has submitted incorrect information shall, upon becoming aware of such failure or incorrect submittal, promptly submit such supplementary information or correct information.

[Rule 62.213.420(4), F.A.C.]

15. At least 180 days prior to the expiration date of this operation permit, the permittee shall submit to this office four copies of the air permit application, DEP Form No. 62-210.900(1).

[Rule 62-4.090(1), F.A.C.]

Section III. Emissions Unit(s) and Conditions.

Subsection A. This section addresses the following emissions unit(s).

E.U. ID No./ Brief Description

Eight Steam Boilers as follows:

009 CCAFS Boiler #1 (Donlee Technology) 010 CCAFS Boiler # 2 ((Donlee Technology) 019 CCAFS Boiler #3 (Cleaver Brooks) 020 CCAFS Boiler #4 (Cleaver Brooks) 038 CCAFS Boiler #5 (Portable) 040 CCAFS Boiler #6 (Portable) 053 CCAFS Boiler #7 (Donlee Technology) 054 CCAFS Boiler #8 (Donlee Technology)

The following conditions apply to the emissions unit(s) listed above:

Essential Potential to Emit (PTE) Parameters

A1. Capacity. The maximum annual (consecutive twelve months) heat input rate for natural gas usage for the eight steam boilers combined is 205 MMSCF (or an equivalent heat input rate for diesel fuel or bio-diesel fuel [20 to 100 percent vegetable oil blend] backup).

[Rule 62-210.200, (PTE), F.A.C. and construction permit 0090005-008-AC]

A2. Methods of Operation. Each boiler is allowed to fire no. 2 fuel oil or bio-diesel fuel [20 to 100 percent vegetable oil blend] or natural gas only.

[Rule 62.210.200, (PTE), F.A.C. and construction permit 0090005-008-AC]

A3. Emissions Unit Operating Rate Limitation After Testing. See specific condition no. A11.

[Rule 62-297.310(2), F.A.C.]

Emission Limitations and Standards

A4. BACT Determined by DEP:

The amount of sulfur dioxide emissions from each boiler will be limited by the firing of new no.

2 fuel oil or bio-diesel fuel [20 to 100 percent vegetable oil blend] having a sulfur content not to exceed 0.05 percent, by weight.

[Rule 62-296.406(2)&(3), F.A.C. and construction permit 0090005-008-AC]

A5. Visible Emissions. Visible emissions shall not exceed 20% opacity except for one two-minute period per hour during which opacity shall not exceed 40%.

[Rule 62-296.406(1), F.A.C.]

Test Methods and Procedures

A6. Each unit shall demonstrate compliance with its visible emission limit in accordance with DEP Method 9 prior to permit expiration date. The test period shall be a minimum of 60 minutes.

[Rules 62-297.401(9)(c), 62-297.310(4)(a)2., 62-297.310(7)(a)4.a., F.A.C.]

A7. DEP Method 9. The provisions of EPA Method 9 (40CFR60, Appendix A) are adopted by reference with the following exceptions:

a) EPA Method 9, Section 2.4, Recording Observations. Opacity observations shall be made and recorded by a certified observer at sequential fifteen-second intervals during the required period of observation.

b) EPA Method 9, Section 2.5, Data Reduction. For a set of observations to be acceptable, the observer shall have made and recorded, or verified the recording of, at least 90 percent of the possible individual observations during the required observation period. For single-valued opacity standards (e.g. 20 percent opacity), the test result shall be the highest valid six-minute average for the set of observations taken. For multiple-valued opacity standards (e.g. 20 percent opacity, except that an opacity of 40 percent is permissible for not more than two minutes per hour) opacity shall be computed as follows:

1) For the basic part of the standard (i.e., 20 percent opacity) the opacity shall be determined as specified above for a single-valued opacity standard.

2) For the short-term average part of the standard, opacity shall be the highest valid short-term average (i.e., two-minute, three-minute average) for the set of observations taken.

In order to be valid, any required average (i.e., a six-minute or two-minute average) shall be based on all of the valid observations in the sequential subset of observations selected, and the selected subset shall contain at least 90 percent of the observations possible for the required averaging time. Each required average shall be calculated by summing the opacity value of each of the valid observations in the subset, dividing this sum by the number of valid observations in the subset, and rounding the result to the nearest whole number. The number of missing observations in the subset shall be indicated in parenthesis after the subset average value.

[Rule 62-297.401, F.A.C.]

A8. Sulfur Dioxide - Sulfur Content. The permittee shall demonstrate compliance with the liquid fuel sulfur limit by the vendor providing a fuel analysis upon each fuel delivery.

[Rules 62-213.440 and 62-296.406(3), F.A.C.]

A9. The fuel sulfur content, percent by weight, for liquid fuels shall be evaluated using one of ASTM D2622-94, ASTM D4294-90(95), ASTM 1552-95, ASTM D1266-91, or both ASTM D4057-88 and ASTM D129-95 or latest editions.

[Rules 62-213.440, 62-296.406(3) and 62-297.440, F.A.C.]

A10. At least 15 days prior to the date on which each formal compliance test is due to begin, the permittee shall provide written notification of the test to the air compliance section of this office.

The notification must include the following information: the date, time and location of each test;

the name and telephone number of the facility's contact person who will be responsible for coordinating the test; and the name, company, and telephone number of the person conducting the test.

[Rule 62-297.310(7)(a)9, F.A.C.]

A11. Testing of emissions shall be conducted with the emissions unit operation at permitted capacity. Permitted capacity is defined as 90 to 100 percent of the maximum operation rate allowed by the permit. If it is impractical to test at permitted capacity, an emissions unit may be tested at less than the minimum permitted capacity; in this case, subsequent emissions unit operation is limited to 110 percent of the test load until a new test is conducted. Once the unit is so limited, operation at higher capacities is allowed for no more than 15 consecutive days for the purpose of additional compliance testing to regain the authority to operate at the permitted capacity.

[Rule 62-297.310(2)& (2) (b), F.A.C.]

Monitoring of Operations

A12. Determination of Process Variables.

(a) Required Equipment. The owner or operator of an emissions unit for which compliance tests are required shall install, operate, and maintain equipment or instruments necessary to determine process variables, such as process weight input or heat input, when such data are needed in conjunction with emissions data to determine the compliance of the emissions unit with applicable emission limiting standards.

(b) Accuracy of Equipment. Equipment or instruments used to directly or indirectly determine process variables, including devices such as belt scales, weight hoppers, flow meters, and tank scales, shall be calibrated and adjusted to indicate the true value of the parameter being measured with sufficient accuracy to allow the applicable process variable to be determined within 10% of its true value.

[Rule 62-297.310(5), F.A.C.]

Recordkeeping and Reporting Requirements

A13. In order to demonstrate compliance with conditions no. A1, A2, and A4, the permittee shall maintain a log at the facility for a period of at least 5 years from the date the data is recorded.

The log at a minimum shall contain the following:

Monthly

a) month

b) consecutive 12 month total of:

- fuel usage rates

- fuel type

c) 30-day rolling average or certification from the fuel oil supplier*

- no. 2 fuel oil sulfur content

*Alternately, through retaining bill of lading records at the Patrick AFB fuel management office for a period of twelve consecutive months from the date of delivery.

[Rules 62-4.070(3) and 62-213.440(1)(b)2., F.A.C. and 40 CFR 60.42c(g)&(h)(1)]

A14. In case of excess emissions resulting from malfunctions, each owner or operator shall notify the Department in accordance with Rule 62-4.130, F.A.C. A full written report on the malfunctions shall be submitted in a quarterly report, if requested by the Department.

[Rule 62-210.700(6), F.A.C.]

A15. Reports of the required test report shall be filed with the air compliance section of this office as soon as practical but no later than 45 days after the last test is completed.

[Rules 62-297.310(8), F.A.C.]

Subsection B. This section addresses the following emissions unit(s).

E.U. ID No./ Brief Description

Three Solvent Sinks and Four Paint Spray Booths as follows:

015 CCAFS Solvent Sink Set #1 018 CCAFS Paint Spray Booth #1 equipped with dry paint filters.

051 CCAFS Paint Spray Booth #2 equipped with a waterfall.

016 CCAFS Paint Spray Booth #3 equipped with dry paint filters.

017 CCAFS Paint Spray Booth #4 equipped with dry paint filters.

052 CCAFS Paint Spray Booth #5 equipped with dry paint filters.

The following conditions apply to the emissions unit(s) listed above:

Essential Potential to Emit (PTE) Parameters

B1. Capacity. The consecutive twelve-month amount of HAP containing materials shall be limited to the amount that equates to the specific HAP emission limitations.

[Rule 62-210.200, (PTE), F.A.C. and construction permit 0090005-008-AC]

B2. Capacity. Regarding emission units 015, 018, 051, 016, and 017, the maximum total VOC utilization rate shall not exceed 43,400 pounds per consecutive twelve months, updated monthly.

[Rule 62-210.200, (PTE), F.A.C. and construction permit 0090005-003-AC]

B3. Capacity. Regarding emission unit 052, the maximum permitted VOC utilization rate shall not exceed 3.03 tons/month and 36.3 tons per consecutive twelve months, updated monthly.

[Rule 62-210.200, (PTE), F.A.C. and construction permit AC05-262376]

B4. No person shall circumvent any pollution control device or allow the emissions of air pollutants without the applicable air pollution control device operating properly.

[Rule 62-210.200, (PTE), F.A.C. and Rule 62-210.650, F.A.C.]

Emission Limitations and Standards

B5. Regarding emission units 015, 018, 051, 016, and 017, the maximum total permitted VOC emission rate is limited to less than 21.7 tons per consecutive twelve months, updated monthly.

[Construction permit 0090005-003-AC]

B6. Regarding emission unit 052, the maximum permitted VOC emission rate shall not exceed

3.03 tons/month and 36.3 tons per consecutive twelve months, updated monthly.

[Construction permit AC05-262376]

B7. The maximum facility-wide (all emission units at the facility) combined HAP emissions are limited to less than 24.5 tons per consecutive twelve months and any facility-wide single HAP emission is limited to less than 9.5 tons per consecutive twelve months, updated monthly. These limits are accepted by the applicant to make the facility a synthetic minor for HAPs only.

[Rule 62-210.200, (PTE), F.A.C. and construction permit 0090005-008-AC]

Recordkeeping and Reporting Requirements

B8. In order to demonstrate compliance with conditions B1, B2, B3, B5, B6, and B7, the permittee shall maintain a monthly log at the facility for a period of at least five years from the date the data is recorded. The log, at a minimum, shall contain the following:

Monthly

a) month

b) Consecutive 12 month total of:

- VOC and HAP usage rates

- coatings usage rates

- VOC emissions rates

- single and combined HAP emission rates

[Rules 62-4.070(3), and 62-213.440(1)(b)2., F.A.C.]

B9. Supporting documentation such as Material Safety Data Sheets, purchase orders, etc., shall be kept for each chemical and associated products which includes sufficient information to determine usage rates and emissions. These records shall be made available to the Department upon request. The log and documents shall be kept at the facility for at least five years and made available to the Department. Monthly logs shall be completed by the end of the following month.

[Rules 62-4.070(3), and 62-213.440(1)(b)2., F.A.C.]

B10. HAP emissions shall be calculated using the latest published version of appropriate EPA AP42 emission factors, other appropriate emission factors, or material balance.

[Rules 62-4.070(3), and 62-213.440(1)(b)2., F.A.C.]

Subsection C. This section addresses the following emissions unit(s).

E.U. ID No./ Brief Description

044 CCAFS Abrasive Blasting Yard #1 045 CCAFS Abrasive Blasting Yard #2 046 CCAFS Abrasive Blasting Yard #3 064 CCAFS Abrasive Blasting Yard #4 052 CCAFS Abrasive Blasting Booth #1

The following conditions apply to the emissions unit(s) listed above:

Essential Potential to Emit (PTE) Parameters

C1. Capacity. The maximum facility wide sand blasting material rate is 1400 tons per consecutive twelve months.

[Rule 62-210.200, (PTE), F.A.C. and Title V application received 6/3/96]

Recordkeeping and Reporting Requirements

C2. In order to demonstrate compliance with condition no. C1, the permittee shall maintain a log at the facility for a period of at least 5 years from the date the data is recorded. The log at a minimum shall contain the following:

Monthly

a) month

b) consecutive 12 month total of sand blasting material rate

Subsection D. This section addresses the following emissions unit(s).

E.U. ID No./ Brief Description

058 CCAFS Engine Driven Chiller #1, fueled by natural gas

The following conditions apply to the emissions unit(s) listed above:

D1. Capacity. The annual (consecutive twelve months) fuel usage rate shall not exceed 28,767,840 scf of natural gas [Rule 62-210.200, (PTE), F.A.C., and application received 10/25/99, revised 12/9/99]

D2. Methods of Operation. The unit is allowed to fire natural gas only.

[Rule 62-210.200, (PTE), F.A.C., and application received 10/25/99, revised 12/9/99]

D3. Hours of Operation. The unit is allowed to operate a maximum of 8760 hours per consecutive twelve months.

[Rule 62-210.200, (PTE), F.A.C. and application received 10/25/99, revised 12/9/99]

D4. Emissions Unit Operating Rate Limitation After Testing. See specific condition no. D9.

[Rule 62-297.310(2), F.A.C.]

Emission Limitations and Standards

D5. The visible emissions limitation for engine driven chiller shall comply with Rule 62-296.406(1), F.A.C. (up to 20 percent opacity, except for one two-minute period per hour during which opacity shall not exceed 40 percent).

[Rule 62-296.406(1), F.A.C. and 40 CFR 60 Subpart Dc]

Test Methods and Procedures

D6. The unit shall demonstrate compliance with its visible emission limit in accordance with DEP Method 9 prior to the permit expiration date. The test period shall be a minimum of 30 minutes or the length of the batch/cycle.

[Rules 62-297.401(9)(c), 62-297.310(4)(a)2., 62-297.310(7)(a)4.a., F.A.C.]

D7. DEP Method 9. The provisions of EPA Method 9 (40CFR60, Appendix A) are adopted by reference with the following exceptions:

a) EPA Method 9, Section 2.4, Recording Observations. Opacity observations shall be made and recorded by a certified observer at sequential fifteen-second intervals during the required period of observation.

b) EPA Method 9, Section 2.5, Data Reduction. For a set of observations to be acceptable, the observer shall have made and recorded, or verified the recording of, at least 90 percent of the possible individual observations during the required observation period. For single-valued opacity standards (e.g. 20 percent opacity), the test result shall be the highest valid six-minute average for the set of observations taken. For multiple-valued opacity standards (e.g. 20 percent opacity, except that an opacity of 40 percent is permissible for not more than two minutes per hour) opacity shall be computed as follows:

1) For the basic part of the standard (i.e., 20 percent opacity) the opacity shall be determined as specified above for a single-valued opacity standard.

2) For the short-term average part of the standard, opacity shall be the highest valid short-term average (i.e., two-minute, three-minute average) for the set of observations taken. In order to be valid, any required average (i.e., a six-minute or two-minute average) shall be based on all of the valid observations in the sequential subset of observations selected, and the selected subset shall contain at least 90 percent of the observations possible for the required averaging time. Each required average shall be calculated by summing the opacity value of each of the valid observations in the subset, dividing this sum by the number of valid observations in the subset, and rounding the result to the nearest whole number. The number of missing observations in the subset shall be indicated in parenthesis after the subset average value.

[Rule 62-297.401, F.A.C.]

D8. At least 15 days prior to the date on which each formal compliance test is due to begin, the permittee shall provide written notification of the test to the air compliance section of this office.

The notification must include the following information: the date, time and location of each test;

the name and telephone number of the facility's contact person who will be responsible for coordinating the test.

[Rule 62-297.310(7)(a)9, F.A.C.]

D9. Testing of emissions shall be conducted with the emissions unit operation at permitted capacity. Permitted capacity is defined as 90 to 100 percent of the maximum operation rate allowed by the permit. If it is impractical to test at permitted capacity, an emissions unit may be tested at less than the minimum permitted capacity; in this case, subsequent emissions unit operation is limited to 110 percent of the test load until a new test is conducted. Once the unit is so limited, operation at higher capacities is allowed for no more than 15 consecutive days for the purpose of additional compliance testing to regain the authority to operate at the permitted capacity.

[Rule 62-297.310(2)& (2) (b), F.A.C.]

Monitoring of Operations

D10. Determination of Process Variables.

(a) Required Equipment. The owner or operator of an emissions unit for which compliance tests are required shall install, operate, and maintain equipment or instruments necessary to determine process variables, such as process weight input or heat input, when such data are needed in conjunction with emissions data to determine the compliance of the emissions unit with applicable emission limiting standards.

(b) Accuracy of Equipment. Equipment or instruments used to directly or indirectly determine process variables, including devices such as belt scales, weight hoppers, flow meters, and tank scales, shall be calibrated and adjusted to indicate the true value of the parameter being measured with sufficient accuracy to allow the applicable process variable to be determined within 10% of its true value.

[Rule 62-297.310(5), F.A.C.]

Recordkeeping and Reporting Requirements

D11. In order to demonstrate compliance with condition number D1, the permittee shall maintain a log at the facility for a period of at least 5 years from the date the data is recorded. The log at a minimum shall contain the following:

Monthly

a) month

b) consecutive 12 month total of:

- fuel consumption

[Rules 62-4.070(3) and 62-213.440(1)(b)2., F.A.C.]

D12. Reports of the required test report shall be filed with the air compliance section of this office as soon as practical but no later than 45 days after the last test is completed.

[Rules 62-297.310(8), F.A.C.]

Subsection E. This section addresses the following emissions unit(s).

E.U. ID No./ Brief Description

065 CCAFS Jet Kerosene (RP-1) Storage Tank (28,000 gal. AST)

{Permitting note: This emission unit is regulated under NSPS – 40 CFR 60, Subpart Kb, Standards of Performance for Volatile Organic Liquid Storage Vessels for Which Construction, Reconstruction, or Modification Commenced after July 23, 1984, and Subpart A, General Provisions, adopted and incorporated by reference in Rule 62-204.800(7), F.A.C.}

The following conditions apply to the emissions unit(s) listed above:

Essential Potential to Emit (PTE) Parameters

E1. Capacity. The maximum total throughput rate is 336,000 gallons of jet kerosene (RP-1) per consecutive twelve months.

[Rule 62-210.200 (PTE), F.A.C. and construction permit 0090005-008-AC]

NSPS Conditions

E2. Pursuant to 40 CFR Part 60.110b(c), this emission unit is not subject to 40 CFR Part 60, Subpart A, General Provisions.

[Rule 62-204.800(7)(b)16., F.A.C. and 40 CFR Part 60 Subpart Kb]

E3. Compliance with conditions of this permit shall demonstrate compliance with the applicable requirements of 40 CFR Part 60, Subpart Kb.

[Rule 62-204.800(7)(b)16., F.A.C. and 40 CFR Part 60 Subpart Kb]

E4. This emission unit is subject to the following specific conditions based on Rule 62- 204.800(7)(b)16., F.A.C. and 40 CFR Part 60 Subpart Kb:

a) Applicability and designation of affected facility (60.110b):

(a) Except as provided in paragraphs (b), (c), and (d) of this section, the affected facility to which this subpart applies is each storage vessel with the capacity greater than or equal to 40 cubic meters that is used to store volatile organic liquids (VOL’s) for which construction, reconstruction, or modification is commenced after July 23, 1984.

(c) Except as provided in paragraphs (a) and (b) of 60.116b, vessel either with a capacity greater than or equal to 151 cubic meters storing a liquid with a maximum true vapor pressure less than

3.5 Kpa or with a capacity greater than or equal to 75 cubic meters but less than 151 cubic meters storing a liquid with a maximum true vapor pressure less than 15.0 Kpa are exempt from the General Provisions (part 60, subpart A) and from the provisions of this subpart.

b) Monitoring of Operations (60.116b):

(a) The owner or operator shall keep copies of all records required by this section, except for the record required by paragraph (b) of this section, for at least 2 years. The record required by paragraph (b) of this section will be kept for the life of the source.

(c) Except as provided in paragraphs (f) and (g) of this section, the owner or operator of each storage vessel either with a capacity greater than or equal to 151 cubic meters storing a liquid with a maximum true vapor pressure less than 3.5 Kpa or with a capacity greater than or equal to 75 cubic meters but less than 151 cubic meters storing a liquid with a maximum true vapor pressure less than 15.0 Kpa shall maintain a record of the VOL stored, the period of storage, and the maximum true vapor pressure of that VOL during the respective storage period.

Recordkeeping and Document Submittal

E5. In order to demonstrate compliance with condition E1, the permittee shall maintain a monthly log at the facility for a period of at least five years from the date the data is recorded. The log, at a minimum, shall contain the following:

Monthly

a) month

b) Consecutive 12 month total of kerosene throughput

Subsection F. This section addresses the following emissions unit(s).

E.U. ID No./ Brief Description

062 CCAFS IC Engines and Generators using No. 2 diesel fuel

The following conditions apply to the emissions unit(s) listed above:

Essential Potential to Emit (PTE) Parameters

F1. Capacity. The consecutive twelve months fuel usage rate shall not exceed 352,000 gallons.

[Rule 62-210.200 (PTE), F.A.C. and construction permit 0090005-008-AC]

F2. Methods of Operation. The unit is allowed to fire no. 2 fuel oil only.

[Rule 62-210.200 (PTE), F.A.C. and construction permit 0090005-008-AC]

Recordkeeping and Reporting Requirements

F3. In order to demonstrate compliance with condition number F1 and F2, the permittee shall maintain a log at the facility for a period of at least 5 years from the date the data is recorded.

The log at a minimum shall contain the following:

Monthly

a) month

b) consecutive 12 month total of:

- fuel consumption

[Rules 62-4.070(3) and 62-213.440(1)(b)2., F.A.C.]