Blank Success Story Format.pdf

PDF 26 KB Posted

Attached to
Environmental Support Contract (ESC III) Federal contract opportunity
Solicitation number
FA2521-12-R-0001
Issued by
Department of the Air Force Space Command

About this file

Blank Success Story Format.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Environmental Support Contract (ESC III), newest first.
File Type Posted
RFP Q A 6.docx DOCX document
12-R-0001 ESC Pre-Proposal Conference Mins.pdf PDF
RFP Q A 3.docx DOCX document
12-R-0001 Pre-Proposal Min Attach 1 Attendee List.pdf PDF
FA2521-12-R-0001 U0001 ESC III Amendment 1 Mod Doc.rtf RTF text file
RFP Q A 2.docx DOCX document
AF Form 332.pdf PDF
2009 PAFB Biennial Report 20100324.pdf PDF
45 SW HazWaste 25 Reduction Candidate Waste Stream Blank.pdf PDF
Existing Environmental Databases Screen Shots 20120203.pdf PDF
2009 CCAFS Biennial Report 20100324.pdf PDF
AF Form103.pdf PDF
FINAL_Cov Ltr.PDF PDF
APP_I-1.PDF PDF
App. A-1.PDF PDF
0090005-010-avf.pdf PDF
Pmt_SOB.PDF PDF
Pmt_SPC.PDF PDF
APP_U-1.PDF PDF
APP_H-1.PDF PDF
Pmt_SOB.pdf PDF
FINAL_Cov_Ltrsigned.pdf PDF
FINAL_Cov_Ltr.pdf PDF
SP_CND_07.pdf PDF
APP_H-1.pdf PDF
APP_I-1.pdf PDF
Cov_Ltr_07signed.pdf PDF
2011 DW Monitoring Requirements.pdf PDF
Example State Stormwater Permits —
CCAFS NPDES MSGP Permit.pdf PDF
Tab M 45SW Final Wildland Fire Management Plan_formatted.pdf PDF
Tab G Pest Management.pdf PDF
Tab D-2 Florida Scrub-jay Manag Plan.pdf PDF
Tab B Wetland and Floodplain Mgmt.pdf PDF
Tab C Coastal and Marine Resources.pdf PDF
Tab E Agricultural Outgrants.pdf PDF
Tab D-3 Scrub Habitat Restoration Plan.pdf PDF
Tab I Conservation Law Enforcement.pdf PDF
Tab K 45SW ISMP.pdf PDF
Tab D Threatened and Endangered Species.pdf PDF
Tab H Outdoor Recreation.pdf PDF
Tab L OPLAN 91-212 BASH Plan.pdf PDF
Attachment 2-Pricing Worksheet Bid Schedule.xlsx XLSX spreadsheet
Attachment 6-ESC III Past Perf Questionnaire 2 Dec 11.docx DOCX document
ESC III Solicitation —
Attachment 4-DD254 ESC III Planning.pdf PDF
Attachment 8-Proposal Worksheet Bid Schedule.xlsx XLSX spreadsheet
Attachment 9-Sample Consent Letter.docx DOCX document
Attachment 5-PEQ COVER LETTER.docx DOCX document
FBO NOTICE.docx DOCX document
Show all 50

Environmental Support Contract (ESC III) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D - 6

TITLE

1.1 Description

This OA describes

Pollution Prevention Objective:

1.2 Applicability of the OA

This OA applies to:

1.3 Alternatives

The following alternatives are analyzed in this OA:

1.4 Advantages and Disadvantages of the Alternatives

Alternatives

Advantages Disadvantages

Table 1 contains a comparison of each alternative based on selected criteria.

Table 1. Comparison of Alternatives for Oil Analyzer for Predictive Maintenance

Criterion Alternative 1

Alternative 2

1.5 Technical Analysis

1.6 Economic Analysis of the Alternatives

1.7 Sources of Information on the Alternatives

1.8 Tailored Spreadsheet for the OA

D - 7

Table 2.1

Row Cost Item Alternative 1 Alternative 2

16 .

Table 2.2

Row Cost Item Alternative 1 Alternative 2

D - 8

1.8.1 Basis of Economic Analysis

1.8.2 Economic Analysis Calculations for Alternative

Table 3 illustrates the steps required to perform a manual economic analysis.

Table 3. Economic Analysis Calculations

Startup Costs [$] Cost of Equipment Purchase + Installation Costs (including power hookups, piping, etc.) + Training Costs (if any)

Manpower Costs [$/yr] Manpower to Operate X Manpower Rate Cost of Oil Purchased [$/yr] Cost of X Amount Purchased

Disposal Cost [$/yr] Cost of Disposal X Quantity Disposed Recurring Costs [$/yr] Manpower Cost + Cost of Purchase + Disposal Cost

Payback Period (yrs) Startup Costs / [Recurring Costs for Current Operations

- Recurring Costs for Proposed Alternative]

First Year Cost of Process [$] Startup Costs + Recurring Costs

Three Year Cost of Process [$] Startup Costs + [3 X Recurring Costs]

First Year Savings [$] Current Operations Cost - Startup Costs - Alternative Operating Costs

Three Year Savings [$] [3 X Current Operations Cost] - Startup Costs - [3 X Alternative Operating Costs]

Notes:

If the payback is negative, it means that there is no payback - the alternative costs more than it saves.

If the savings is negative, then the alternative does not save money, but actually costs money over the current practice.

TITLE
Table 2.2

File details come from the government source that posted it. Updated .