Example State Stormwater Permits

116 KB Posted

Attached to
Environmental Support Contract (ESC III) Federal contract opportunity
Solicitation number
FA2521-12-R-0001
Issued by
Department of the Air Force Space Command

About this file

Example State Stormwater Permits (ERP) at CCAFS.pdf

Text of this file

ver Water M. iagement District

Kirby B. Green HI, Executive Director David W. Fisk, Assistant Executive Director

4049 Reid Street P.O. Box 1429 Palatka, FL.321 78-1429 (386) 329-4500

On the Internet at www.sjrwmd.com.

September 23, 2009

US Air Force 45th Space Wing

45 CES/CEA

1224 Jupiter Street Patrick Afb, FL 32925

SUBJECT: Permit Number 40-009-122177-1 Repair Drainage arid Clear Zone at Cape Canaveral Air Force Station

Dear Sir/Madam:

Enclosed is your general permit as authorized by the staff of the St. Johns River Water Management District on September 23, 2009.

This permit is a legal document and should be kept with your other important documents. The attached MSSW/Stormwater As-Built Certification Form should be filled in and returned to the Palatka office within thirty days after the work is completed. By so doing, you will enable us to schedule a prompt inspection of the permitted activity.

In addition to the MSSW/Stormwater As-Built Certification Form, your permit also contains conditions which require submittal of additional information. All information submitted as compliance to permit conditions must be submitted to the Palatka office address.

Permit issuance does not relieve you from the responsibility of obtaining permits from any federal, state and/or local agencies asserting concUrrent jurisdiction for this work.

Please be advised that the District has not published a notice in the newspaper advising the public that it is issuing a permit for this proposed project. Publication, using the District form, notifies members of the public (third parties) of their rights to challenge the issuance of the general permit. If proper noticte is given by publication, third parties have a 21-day time limit on the time they have to file a petition opposing the issuance of the permit. If you do not publish, a party's right to challenge the issuance of the general permit extends for an inefinite period of time. If you wish to have certainty that the period for filing such a challenge is Ôlosed, then you may publish, at your own expense, such a notice in a newspaper of general circultion. A copy of the form of the notice and a list of newspapers of general circulation is attached for your use.

In the event you sell your property, the permit will be transferred to the new owner, if we are notified by you within thirty days of the sale and if you provide the information required by4OC- 1.612, F.A.C. Please assist usin this matter so asto maintain a valid permit for the new property owner.

GOVERNIPIG BOARD

Susan N. Hughes, CI-4lRMAN W. Leonard Wood, VICE CHAIRMAN Hersey Herky" Huffman, SECRETARY Hans G. Tanzler Ill TREASURER

POmEVEDRA FERNANDINA BEACH ENTERPRISE JACKSONVILLE

Douglas C. Bournique Michael Ertel Maryam H. Ghyabi Richard G. Hamann Arlen N. Jumper VERO BEACH OVIEDO ORMOND BEACH OAINESVILLE FORT McCOY

Thank you for your cooperation, and if this office can be of any further assistance to you, please do not hesitate to contact us.

Sincerely, Martha Depalma Regulatory Information Management Specialist II

Division of Regulatory Information Management

Enclosures: Permit with As-built Certification Form Notice of Rights List of Newspapers for Publication cc: District Permit File

Consultant: Steven V Houghtaling POBoxl394 Cape Canaveral, FL 32920

LOCATION:

Section(s): 19, 24 29, 30

Brevard County

US Air Force 45th Space Wing

45 CES/CEA

1224 Jupiter Street Patrick Afb, FL 32925

ST. JOHNS RIVER WATER MANAGEMENT DISTRICT

Post Office Box 1429

Palatka, Florida 32178-1429

PERMIT NO. 40-009-122177-1 DATE ISSUED: September23, 2009 PROJECT NAME: Repair Drainaqe and Clear Zone at Cape Canaveral Air Force Station

A PERMIT AUTHORIZING:

Construction of a Surface Water Management System with stormwater treatment by Best Management Practices, Swales for Repair Drainage and Clear Zone at Cape Canaveral Air Force Station, a 16.92 - acre project to be constructed as per plans received by the District on August 28, 2009. The project includes alterations to 5.81 acres of surface water upland cut ditches.

By:

(Service Center Director - Palm Bay)

John Juilianna

Township(s): 23S Range(s): 37E 23S 38E

Permittee agrees to hold and save the St. Johns River Water Management District and its successors harmless from any and all damages, claims, or liabilities which may arise from permit issuance. Said application, including all plans and specifications attached thereto, is by reference made a part hereof.

This permit does not convey to permittee any property rights nor any rights or privileges other than those specified herein, nor relieve the permittee from complying with any law, regulation or requirement affecting the rights of other bodies or agencies. All structures and works installed by permittee hereunder shall remain the property of the permittee:

This permit may be revoked, modified or transferred at any time pursuant to the appropriate provisions of Chapter 373, Florida Statutes:

PERMIT IS CONDITIONED UPON:

See conditions on attached "Exhibit A", dated September 23, 2009

AUTHORIZED BY: St. Johns River Water Management District Department of Resource Management

"EXHIBIT A"

CONDITIONS FOR ISSUANCE OF PERMIT NUMBER 40-009-1 221 77-1

US AIRFORCE 45TH SPACE WING

DATED SEPTEMBER 23, 2009

All activities shall be implemented as set forth in the plans, specifications and performance criteria as approved by this permit. Any deviation from the permitted activity and the conditions for undertaking that activity shall constitute a violation of this permit.

This permit or a copy thereof, complete with all conditions, attachments, exhibits, and modifications, shall be kept at the work site of the permitted activity. The complete permit shall be available for review at the work site upon request by District staff. The permittee shall require the contractor to review the complete permit prior to áommencement of the activity authorized by this permit.

Actiyities approved by this permit shall be conducted in a manner which do not cause violations of state water quality standards.

Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with the guidelines and specifications in chapter 6 of the Florida Land Development Manual: A Guide to Sound Land and Water Management (Florida Department of Environmental Regulation 1988), which are incorporated by reference, unless a project specific erosion and sediment control plan is approved as part of the permit, in which case the practices must be in accordance with the plan. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment, beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with the specifications in chapter 6 of the Florida Land Development Manual: A Guide to Sound Land and Water Management (Florida Department of Environmental Regulation 1988). The permittee shall correct any erosion or shoaling that causes adverse impacts to thewater resources.

Stabilization measures shall be initiated for erosion and sediment control on disturbed areas as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than 7 days after the construction activity in that portion of the site has temporarily or permanently ceased.

At least 48 hours prior to commencement of activity authorized by this permit, the permittee shall submit to the District a Construction Commencement Notice Form No.

40C-4.900(3) indicating the actual start date and the expected completion date.

When the duration of construction will exceed one year, the permittee shall submit construction status reports to the District on an annual basis utilizing an Annual Status Report Form No. 40C-4.900(4). These forms shall be submitted during June of each

'year. '

.8. For those systemswhich will be operated or maintained by an entity which will require an easement or deed restriction in order to provide that entity with the authority necessary to operate or maintain the system, such easement or deed restriction, together with any other final operation or maintenance documents as are required by subsections 7.1.1 through 7.1.4 of the Applicant's Handbook: Management and Storage of Surface Waters, mustbe submitted to the District for approval. Documents meeting the requirements set forth in these subsections of the Applicant's Handbook will be approved. Deed restrictions, easements and other operation and maintenance documents which require recordation either with the Secretary ofState or the Clerk of the Circuit Court must be so recorded prior to lot or unit sales within the project served by the system, or upon completion of construction of the system, whichever occurs first.

For those systems which are proposed to be maintained by county or municipal entities, final operation and maintenance documents must be received by the Distribt when maintenance and operation of the system is accepted by the local governmental entity.

Failure to submit the appropriate final documents referenced in this paragraph will result in the permittee remaining liable for carrying out maintenance and operation of the permitted system.

9. Each phase or independent portion of the permitted system must be' completed in accordance with the permitted plans and permit conditions prior to the initiation of the permitted use of site ,infrastructure located within the area served by the portion or phase of the system. Each phase or independent portion of the system must be completed in accordance with the permitted plans and permit conditions prior to transfer of responsibility for operation and maintenance of that phase or portion.of the system to local government or other responsible entity.

10. Within 30 days after completion of construction of the permitted system, or independent 'portion of the system, the permittee shall submit a written' statement of completion and certification by a registered professional engineer or other appropriate individual as authorized bylaw, utilizing As Built Certification Form 40C-1.181(13) or4OC-t181(14)', supplied with this permit. When the completed system differs substantially from the permitted plans, any substantial deviations shall be noted and explained and two copies of as-built drawings submitted to the District. Submittal of the completed from shall serve to notify the District that the system is ready for inspection. The statement of completion and certification shall be based on on-site observation of construction (conducted by the registered professional engineer, or other appropriate individual as authorized by law, or under his or her direct supervision) or review of as-built drawings for the purpose of determining if the work was completed in compliance with approved plans and specifications. As-built drawings shall be the permitted drawings revised to reflect any changes made during construction. Both the original and any revised specifications must be clearly shown. The plans must be clearly labeled as "as-built" or "record" drawing. All surveyed dimensions and elevations shall be certified bya registered urveyor. The following information, at a minimum, shall be verified on the as-built drawings:

Dimensions and elevations of all discharge structures including all weirs, slots, gates, pumps, pipes, and oil and grease skimmers;

Locations, dimensions, and elevations of all filter, exfiltration, or underdrain systems including cleanouts, pipes, connections to controlstructures, and points of discharge to the receiving waters;

Dimensions, elevations, contours, or cross-sections of all treatment storage areas sufficient to determine state-storage relationships of the storage area and the permanent pool depth and volume below the control elevation for normally wet systems, when appropriate;

4.Dimensions, elevations, contours, final grades, or cross-sections of the system to determine flow directions and conveyance of runoff to the treatment system;

5. Dimensions, elevations, contours, final grades, or cross-sections of all conveyance systems utilized to convey off-site runoff around the, system;

6.Existing water elevation(s) and the date determined; and Elevation and location of benchmark(s) for the survey.

11. The operation phase of this permit shall not become effective until the permittee has complied with the requirements of general condition 9 above, the District determines' the system to be in compliance with the permitted plans, and the entity approved by the

District in accordance with subsections 7.1.1 through 7.1.4 of the Applicant's Handbook:

Management and Storage of Surface Waters, accepts responsibility for operation and maintenance of the system. The permit may not be transferred to such an approved operation and maintenance entity until the operation phase of the permit becomes effective. Following inspection and approval of the permitted system by the District, the permittee shall request transfer of the permit to the responsible approved operation and maintenance entity, if different from the permittee. Until the permit is transferred pursuant to section 7.1 of the Applicant's Handbook: Management and Storage of Surface Waters, the permittee shall be liable for compliance with the terms of the permit.

12. Should any other regulatory agency require changes to the permitted system, the permittee shall provide written notification to the District of the changes prior implementation so that a determination can be made whether a permit modification is required.

13. This permit does not eliminate the necessity to obtain any required federal, state, local and special district authorizations prior to the start of any activity approved by this permit. This permit doesnot convey to the permittee or create in the permittee any property right, or any interest in real property, nor does it authorize any entrance upon or activities on property which is not owned or controlled by the permittee, or convey any rights or privileges other than those specified in the permit and chapter 40C-4 or chapter 400-40, F.A.C.

The permittee shall hold and save the District harmless from any and all damages, claims, or liabilities which may arise by reason of the activities authorized by the permit or any use of the permitted system.

Any delineation of the extent of a wetland or other surface water submitted as part of the permit application, including plans or other supporting documentation, shall not be considered specifically approved unless a specific condition of thispermit or a formal determination under rule 400-1.1006, F.A.C., provides otherwise.

The permittee shall notify the District in writing within 30 days of any sale, conveyance, or other transfer of ownership or control of the permitted system or the real property at which the permitted system is located. All transfers of ownership or transfers of a permit are subject to the requirements of rule 400-1.612, F.A.C. The permittee transferring the permit shall remain liable for any corrective actions that may be required as a result of any permit violations prior to such sale, conveyance or other transfer.

1.7. Upon reasonable notice to the permittee, District authorized staff with proper identification shall have permission to enter, inspect, sample and test the system to insure conformity with the plans and specifications approved bythe permit.

If historical or archaeological artifacts are discovered at any time on the project site, the permittee shall immediately notify the District.

The permittee shall immediately notify the District in writing of any previously, submitted information that is later discovered to be inaccurate.

This permit for construction will expire five years from the date of issuance.

All wetland areas or water bodies that are outside the specific limits of construction.

authorized by this permit must be protected from erosion, siltation, scouring or excess turbidity, and dewatering.

Prior to construction, the permittee must clearly designate the limits of construction on-site. The permittee must advise thecontractor that anywork outside the limits of construction, including clearing, may be a violation of this permit.

Construction of a Surface Water Management System with stormwater treatment by Best Management Practices, Swales for. Repair Drainage and Clear Zone at Cape Canaveral Air Force Station, a 16.92 - acre project to be constructed as per plans received by the District on August 28, 2009.

This permit authorizes 5.81 acres of surface water impacts to upland cut ditches. No other impacts to wetlands or other surface waters are authorized under this permit.

Notice Of Rights

A person whose substantial interests are or may be affected has the right to requestan administrative hearing by filing a written petition with the St. Johns River Water Management District (District). Pursuant to Chapter 28-106 and Rule 40C-1 .1007, Florida Administrative Code, the petition must befiled (received) either by delivery at the office of the District Clerk at District Headquarters, P. 0. Box 1429, Palatka Florida 32178-1 429 (4049 Reid St., Palatka, FL 32177) or by e-mail with the District Clerk at Clerk(ãsjrwmd.com, within twenty-six (26) days of the District depositing the notice of intended District decision in the mail (for those persons to whom the District mails actual notice), within twenty-one (21) days of the District emailing the notice of intended District decision (for those persons to whom'the District emails actual notice), or within twenty-one (21) days of newspaper publication of the notice of intended District decision(for those persons to whom the District does not mail or email actual notice). A petition must comply with Sections 120.54(5)(b)4. and 120.569(2)(c), Florida Statutes, and Chapter 28-1 06, Florida Administrative Code. The District will not accept a petition sent by facsimile (fax), as explained in paragraph no. 5 below. Mediation pursuant to Section 120.573, Florida Statutes, is not available.

If the District takes action that sUbstantially differs from the notice of intended District decision, a person whose substantial interests are or may be affected has the right to request an administrative hearing by filing a written petition with the District, but this request for administrative hearing shall only address the substantial deviation. Pursuant to Chapter 28-1 06 and Rule 40C-1.1007, Florida Administrative Code, the petition must be filed (received) at the office of the District Clerk at the mail/street address or email address described in paragraph no. 1 above, within twenty-six (26) days of the District depositing notice of final District decision in the mail (for those persons to whom the District mails actual notice), within twenty-one (21) days of the District emailing the notice of final District decision (for those persons to whom the District emails actual notice), or within twenty-one (21) days of newspaper publication of the notice of final District decision (for those persons to whom the District does not mail or email actual notice). A petition must comply with Sections 120.54(5)(b)4. and 120.569(2)(c), Florida Statutes, and Chapter 28-106, Florida Administrative Code. Mediation pursuant to Section 120.573, Florida Statutes, is not available.

A person whose substantial interests are or may be affected has the right to a formal administrative hearing pursuant to Sections 120.569 and 120.57(1), Florida Statutes, where there is a dispute between the District and the party regarding an issue of material fact. A petition for formal hearing must also comply with the requirements set forth in Rule 28-106.201, Florida Administrative Code.

A person whose substantial interests are or may be affected has the right to an informal administrative hearing pursuant to Sections 120.569 and 12057(2), Florida Statutes, where no material facts are in dispute. A petition for an informal hearing must also comply with the requirements set forth in Rule 28-106.301, Florida Administrative Code.

Notice Of Rights

A petition for an administrative hearing is deemed filed upon receipt of the complete petition by the District Clerk at the District Headquarters in Palatka, Florida during the District's regular business hours. The District's regular business hours are 8:00 a.m. - 5:00 p.m., excluding weekends and District holidays. Petitions received by the District Clerk after the District's regular business hours shall be deemed filed as of 8:00 a.m. on the District's next regular business day. The District's acceptance of petitions filed by e-mail is subject to certain conditions set forth in the District's Statement of Agency Organization and Operation (issued pursuant to Rule 28-101.001 ,Florida Administrative Code), which is available for viewing at www.sirwmd.com. These conditions include, but are not limited to, the petition being in the form of a PDF or TIFF file and being capable of being stored and printed by the District. Further, pursuant to the District's Statement of Agency Organization and Operation, attempting to file a petition by facsimile is prohibited and shall not constitute filing.

Failure to file a petition for an administrative hearing within the requisite time frame shall constitute a waiver of the right to an administrative hearing. (Rule 28-106.111, Florida Administrative Code).

The right to an administrative hearing and the relevant procedures to be followed are governed by Chapter 120, Florida Statutes, Chapter 28-1 06, Florida Administrative Code, and Rule 40C-1.1007, Florida Administrative Code. Because the administrative hearing process is designed to formulate final agency action, the filing of a petition means the District's final action may be different from the position taken by it in this notice. A person whose substantial interests are or may be affected by the District's final action has the right to become a party to the proceeding, in accordance with the requirements set forth above.

Pursuant to Section 120.68, Florida Statutes, a party to the proceeding before the District who is adversely affected by final District action may seek review of the action in the District Court of Appeal by filing a notice of appeal pursuant to Rules 9.110 and 9.190, Florida Rules of Appellate Procedure, within 30 days of the rendering of the final District action.

A District action is considered rendered, as referred to in paragraph no. 8 above, after it is signed on behalf of the District, and is filed by the District Clerk.

Failure to observe the relevant time frames for filing a petition for judicial review as described in paragraph no. 8 above will result in waiver of that right to review.

NOR.DOC.001

Revised 7/16/09

Division of Regulatory Information Management Gloria Lewis,. Director

St. Johns River Water Management District Post Office Box 1429 Palatka, FL 32178-1429 (386)329-4152 Permit Number: 40-009-122177-1

Notice Of Rights

Certificate of Service

I HEREBY CERTIFY that a copy of the foregoing Notice of Rights has been sent by U.S.

Mail to:

US Air Force 45th Space Wing

45 CES/CEA

1224 Jupiter Street Patrick Afb, FL 32925

At 4:00 p.m: this 23rd day of September, 2009.

Other files for this federal contract opportunity

Other files attached to Environmental Support Contract (ESC III), newest first.
File Type Posted
RFP Q A 6.docx DOCX document
12-R-0001 ESC Pre-Proposal Conference Mins.pdf PDF
RFP Q A 3.docx DOCX document
12-R-0001 Pre-Proposal Min Attach 1 Attendee List.pdf PDF
ESC III Pre-Proposal Conference Slides —
FA2521-12-R-0001 U0001 ESC III Amendment 1 Mod Doc.rtf RTF text file
Attachment 2-Rev 1Pricing Worksheet Bid Schedule.xlsx XLSX spreadsheet
Other Instructions_Manuals.docx DOCX document
RFP Q A 2.docx DOCX document
AF Form 332.pdf PDF
2009 PAFB Biennial Report 20100324.pdf PDF
2009 CCAFS Biennial Report 20100324.pdf PDF
AF Form103.pdf PDF
LTR HEAD.pdf PDF
Quarterly HazWaste Metrics.pdf PDF
FINAL_Cov Ltr.PDF PDF
APP_I-1.PDF PDF
App. A-1.PDF PDF
APP_H-1.PDF PDF
Cov_Ltr.PDF PDF
Pmt_SOB.pdf PDF
FINAL_Cov_Ltrsigned.pdf PDF
FINAL_Cov_Ltr.pdf PDF
Cov_Ltr_07signed.pdf PDF
App A-1.pdf PDF
CCAFS NPDES MSGP Permit.pdf PDF
CCAFS Regional Domestic Wastewater Operating Permit.pdf PDF
RCRA Operating Permit CCAFS 4Feb10.pdf.pdf PDF
CCAFS Landfill Closure Permit.pdf PDF
Tab M 45SW Final Wildland Fire Management Plan_formatted.pdf PDF
Tab G Pest Management.pdf PDF
Tab D-2 Florida Scrub-jay Manag Plan.pdf PDF
Tab B Wetland and Floodplain Mgmt.pdf PDF
Tab C Coastal and Marine Resources.pdf PDF
Tab H Outdoor Recreation.pdf PDF
Tab L OPLAN 91-212 BASH Plan.pdf PDF
Tab F Forestry and Urban Forestry.pdf PDF
Tab P Training Education Outreach.pdf PDF
Tab N Cooperative Agreements and Permits.pdf PDF
Attachment 2-Pricing Worksheet Bid Schedule.xlsx XLSX spreadsheet
Attachment 4-DD254 ESC III Planning.pdf PDF
Attachment 8-Proposal Worksheet Bid Schedule.xlsx XLSX spreadsheet
Attachment 9-Sample Consent Letter.docx DOCX document
Attachment 5-PEQ COVER LETTER.docx DOCX document
Attachment 3-SCA Wage Determination 6-13-11.pdf PDF
Attachment 7-CCAFS LMU Map.docx DOCX document
Attachment 1a-Items List.xlsx XLSX spreadsheet
Attachment 1 PWS - ESCIII 6 Feb.docx DOCX document
RFP Q A 1.docx DOCX document
FBO NOTICE.docx DOCX document
Show all 50

Environmental Support Contract (ESC III) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .