DRAFT PWS - OWS 17 September.docx
DOCX document 137 KB Posted
- Solicitation number
- FA2517-PC-SS-2
About this file
This document is a Draft Performance Work Statement (PWS) for the inspection, pumping, cleaning, and removal of Oil/Water Separators (OWS), Sand Sediments, Grease Traps, and Septic Tanks at Peterson Space Force Base (PSFB) and Cheyenne Mountain Space Force Station (CMSFS).
The PWS requires the contractor to provide all management, tools, supplies, equipment, and labor necessary to service these facilities in accordance with federal, state, local, and OSHA requirements. The contractor must follow specific safety and health standards, obtain necessary licenses and permits, and maintain detailed records. The PWS outlines the scope of work, schedules, and procedures for servicing the OWSs, grease traps, and septic tanks at PSFB and CMSFS. It also addresses requirements for emergency service calls, water supply, security access, and disposal of waste materials. Appendices provide estimated workload data and lists of applicable publications, forms, and certificates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OWS Sources Sought.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT PERFORMANCE WORK STATEMENT
OIL & WATER SEPARATORS (OWS), SAND SEDIMENTS AND GREASE TRAPS
FOR
PETERSON SPACE FORCE BASE (PSFB) AND CHEYENNE MOUNTAIN SPACE FORCE STATION (CMSFS)
17 September 24
SECTION I DESCRIPTION OF SERVICES
1.1 SCOPE OF WORK. Provide all management, tools, supplies, equipment and labor necessary to inspect, pump, clean and remove the Oil/Water Separators (OWS), Sand Sediments, Grease Traps and Septic Tank contents located at Peterson SFB, CO and Cheyenne Mountain Space Force Station, CO as defined in this Performance Work Statement (PWS). Conform to all federal, state, local requirements, federal, state, local governments and commercial standards and Occupational Safety and Health Administration (OSHA) standards as well as (DAFMAN 91-203). Work shall be performed in accordance with (IAW) the terms and conditions of this PWS. Estimated requirements are listed in Section V and Section VI, Appendix A, Estimated Workload Data for the Oil & Water Separators, Sand Sediments, Grease Traps and Septic tanks.
1.2 SAFETY AND HEALTH STANDARDS. The contractor shall initiate and maintain programs to comply with the provisions of the Occupational Safety and Health Standards Act (OSHA) concerning entry requirements in confined spaces and handling of potentially hazardous substances as it pertains to liquid wastes. The following list of federal regulations pertaining to liquid wastes, which is not all- inclusive and are listed for 21 CES in Section V and VI, respectively Appendix B Publications, Forms and Certifications:
· Oil Pollution Act of 1990, Section 1001F
· The Clean Water Act, Title 3, “Standards and Enforcement”, and Title 4, “Permits and Licenses”
· Title 29 CFR Part 1910, “Occupational Safety & Health Standards/Administration-Labor”
· Title 40 CFR Parts 104-149 “Water Programs”
· Title 40 CFR Part 110, “Discharge of Oil”
· Title 40 CFR Part 112, “Oil Pollution Prevention”
· Title 40 CFR Part 401-471, “Effluent Guidelines and Standards”
· Title 40 CFR Subpart F, “Releases from Solid Waste Management Units”
· U.S. DOT Federal Motor Carrier Safety Administration (FMCSA), Commercial Motor Vehicle Safety Act of 1986
· CCR 1007-2, Section 18, WASTE GREASE TRANSPORTERS, FACILITIES, AND PERSONAL USERS OF WASTE GREASE
1.3 SPACE ENTRY TRAINING. All OWSs on Peterson SFB or CMSFS are situated below the ground surface and considered a permit-required confined space. However, all OWS are accessible from ground level, and it should not be necessary for the contractor to break the surface plane to clean and inspect the OWSs except for one as identified in 5.1. If the contractor deems it necessary to break the surface plane and enter the confined space, they shall notify the Contracting Officer’s Representative (COR) to coordinate with the Peterson Fire Department or CMSFS Fire Department. Service must be coordinated to ensure fire department staff availability. Known possible hazards associated with other oil/water separators are:
| CLOSED SYSTEM |
| OPEN SYSTEM |
| Spill/Flow |
| Electrical |
| Oxygen |
| Methane Gas (JP-8) |
| Oil/Grease |
| Hydrogen Sulfide |
| Carbon Monoxide |
| Fuels/Petroleum |
| Corroded ladders |
| Slippery Surfaces |
| Moving Machinery |
| Noise Engulfment/Tripping/Entanglement |
Limited Access
1.4 TESTING. A composite sample of all OWS contents will be drawn from PSFB and CMSFS sites, identified in Appendices A/A1. Composite and Analytical Testing are required every three (3) years for both PSFB and CMSFS, based off the previous test result dates of September 2023 for PSFB and April 2002 for CMSFS. Once complete, a copy of the new report will be provided to the Contracting Officer Representative (COR).
1.5 SCHEDULING MAINTENANCE. The contractor shall initiate scheduling the annual and semi-annual routine maintenance IAW Appendix A/A1 “Estimated Workload Data” and with (COR) in 21 CES/CEOES at (719) 556-4158 or 21 CES/OL-CM/CEOES at (719) 474-3151/2734 prior to servicing any OWS or grease traps listed on Appendix A/A1.
1.6 OWS PROCESSES: The contractor shall pump all oil, oil residue, and other waste from separators IAW Section V, Appendix A/A1 schedules. The contractor shall drain separator completely from the separators or pit walls and all associated equipment within the separators. Flush down with water and pump out remaining residue as required by the unique configuration of the separators. See Section 3, paragraph 3.1 for water supply requirements. The contractor shall inspect all parts for problems to include concrete walls and floors for cracks, leaks, broken pipes or other disrepair. If the contractor notices any problems during their inspection, they shall immediately provide the information to the COR prior to the water refill. The contractor shall list, on contractor’s letterhead stationery, the condition of each OWS and any noted deficiencies during each inspection, by location, and submit this to the COR with the manifest. Contractor shall transport all materials from oil/water separators to an approved off-base oil recovery and storage facility. At CMSFS the contractor shall replace the sand/dirt mats on the sand traps in bldg. 300 whenever the grate is removed.
1.7 Grease Traps: The contractor shall pump out all grease and residues from trap IAW Appendix A schedule or on an emergency basis upon notification by the COR. The contractor shall remove waste build up from trap or pit walls and all associated equipment within the pit. Flush down with water and pump out remaining residue as required by the unique configuration of the grease trap. See Section 3, paragraph 3.1 for water supply requirements. Contractor shall inspect all parts for problems to include concrete walls and floors for cracks, leaks, broken pipes or other disrepair. If the contractor notices any problems during their inspection, they shall immediately provide the information to the COR prior to the water refill. The contractor shall have the COR sign the Uniform Waste Grease Manifest (Form WG- 2) After servicing grease traps prior to leaving installation. The contractor shall list, on contractor’s letterhead stationery, the condition of each Grease Trap and any noted deficiencies during each inspection, by location, and submit this to the COR with the Uniform Waste Grease Manifest (Form WG-2). Residual or recharge water must be higher than lower inlets. Clear obstruction in inlet/outlet pipes to ensure unrestricted flow. Transport all materials from grease traps to an approved off-base storage facility. The use of Personnel Protective Equipment is necessary for removal from the grease traps, Tyvex suits and boot covers, protective eye goggles, hard hat, and gloves must be used while working under building 1000 at CMSFS.
1.8 Septic Tanks: The contractor shall pump out all sewage and residue from tank IAW Appendix A schedule or on an emergency basis upon notification by the COR. The contractor shall drain the tank completely. The contractor shall inspect all parts for problems to include walls and floors for cracks, leaks, broken pipes or other disrepair. If the contractor notices any problems during their inspection, they shall immediately provide the information to the COR. The contractor shall list, on contractor’s letterhead stationary, the condition of each septic tank and any noted deficiencies during each inspection, by location, and submit this to the COR with the manifest. Contractor shall transport all materials from septic tank to an approved off-base disposal facility.
1.9 HIGH-PRESSURED JETTER. The contractor shall utilize the high-pressured jetter to clear blocked sewer lines and storm drains. The vacuuming feature will be utilized, when necessary, to remove all sludge, gravel, and residue from all areas requiring the services.
1.10 WASH RACK (CMSFS). The contractor shall service two (2) sediment tanks, located in the wash rack, during the months of November thru April, and June thru September of each year.
1.11 EMERGENCY SERVICE CALLS (PSFB/CMSFS). In the event that emergency service is required, the contractor shall begin service within four (4) hours after notification by the COR.
1.12 DISPOSAL. All liquids and semi-solid waste removed from Peterson SFB and Cheyenne Mountain SFS shall be disposed of off Air Force property in accordance with all applicable Federal, State and local environmental regulations stated in this PWS.
1.13 LICENSES AND PERMITS. The contractor shall be responsible for obtaining any necessary licenses and permits to transport non-hazardous waste in accordance with the Commercial Vehicle Safety Act of 1986, WASTE GREASE TRANSPORTERS, FACILITIES, AND PERSONAL USERS OF WASTE GREASE and for complying with any federal, state, and municipal laws, codes, and regulations applicable to the performance of work. The contractor shall be responsible for all new and updated laws during the duration of the contract. Contractor shall provide proof of such applicable licenses and permits upon request of the Air Force.
1.14 SPECIAL QUALIFICATIONS. Each Contractor shall have a current/valid Commercial Driver's License (CDL) and current insurance IAW FMCSA.
1.15 RECORDS. The contractor shall maintain sufficiently detailed records to indicate the dates of waste pick-ups, the method of transportation, and the location of the disposal site, registration of disposal site and registration of transport vehicle. The contractor shall provide the final copy of the non-hazardous manifest or commercial bill of lading to the COR within five (5) work days of receipt of the request. If there is Hazardous Waste identified, prior to shipping any portion of the removed sediments off either PSFB or CMSFS as a hazardous waste, notify CES Environmental qualified government representative to sign the manifest. Environmental can be reached at (719) 556-7707 or 556-6100. A copy of the final manifest shall be given to Environmental.
SECTION II SERVICE SUMMARY
| PERFORMANCE OBJECTIVE |
| PWS PARAGRAPH |
| PERFORMANCE THRESHOLD |
| 1. Remove, clean and inspect oil and residue from Oil & Water Separators, Sand Sediment, Grease Traps and Septic Tanks |
| 1.5-1.8, PSFB |
Appendix A/A1, CMSFS Appendix A/A1 Contractor responds as scheduled and removes contents. No more than 1 customer complaint per scheduled service.
| 2. Emergency Service Calls. |
| 1.11, 4.4, PSFB |
Appendix A, CMSFS Appendix A/A1 Contractor responds and removes contents within 4 hours. No discrepancies allowed.
SECTION III GOVERNMENT-FURNISHED PROPERTY
3.1 GOVERNMENT FURNISHED PROPERTY. Contractor shall coordinate with the COR to obtain the water source. For PSFB – opposite building 670, or designated fire hydrant, identified by COR. CMSFB COR will identify a fire hydrant for utilization. The contractor must have a back flow preventer hose to put the water into their truck. See PWS Attachment C for Water Levels for each OWS and Grease Trap.
SECTION IV GENERAL INFORMATION
4.1 HOURS OF OPERATION.
4.2 NORMAL DUTY HOURS. Contractor shall perform services required under this contract during the following hours: 7:30 a.m. to 4:00 p.m. Monday through Friday.
4.3 HOLIDAYS. Routine repair work shall not be required on the following holidays or any holidays observed in lieu thereof:
| New Year's Day (January) | Labor Day (September) Martin Luther King Day (January) | Columbus Day (October) President's Day (February) | Veterans' Day (November) Memorial Day (May) | Thanksgiving Day (November) | |
| Juneteenth (June) | Christmas Day (December) Independence Day (July) |
4.4 EMERGENCY SERVICES (PSFB/CMSFS). The contractor shall respond within four (4) hours after notification by the Contracting Officer or COR. The contractor shall respond to the 4 hour response time to an emergency requirement that may fall on a weekend or holiday.
4.5 QUALITY ASSURANCE. The government shall periodically evaluate the contractor’s performance by appointing Contracting Officer’s Representative (s) CORs and alternate to monitor the performance through intermittent on-site inspections and receipt of complaints from base personnel and to ensure services are received.
4.6 SECURITY REQUIREMENTS. The Contractor and all employees shall comply with all Cheyenne Mountain SFS and Peterson SFB security requirements imposed by the local installation commander at all times while on the premises to include not using cell phones while operating a vehicle on Base. Contractor shall obtain necessary badges(s) required for access to Cheyenne Mountain SFS and Peterson SFB. The information contained in the Badge Request Letter is subject to the Privacy Act of 1974 as follows: AUTHORITY: 5 U.S.C. 4501; 10 U.S.C. 1124; EO 9397; PRINCIPAL PURPOSE: to list the names of personnel authorized to perform various functions under this contract.
4.6.1 ROUTINE USES: To ensure positive identification of personnel authorized to perform the listed functions. The Social Security Number is needed for this identification. Disclosure is voluntary, however, failure to supply any required information may cause denial of entry to or delays in processing access onto Cheyenne Mountain SFS and Peterson SFB. BADGE REQUEST. Contractor shall send a letter to the Contracting Office on company stationery, which shall include address and telephone number. To obtain a badge for those who require access to Peterson SFB or CMSFS, the contractor shall list: the contract number, list full names of employee(s), their social security number, and date of birth. Anytime a badge is requested for a new employee, an updated employee list shall accompany a request letter by the contractor to the contracting office. Contractor employees shall apply for individual identification badges at the Cheyenne Mountain SFS Security Force Squadron Visitor’s Control Center, Bldg 15. Badges are processed Monday through Friday from 7:30 a.m. to 2:30 p.m. Peterson SFB Security Force Squadron Visitor’s Control Center, Bldg 1334. Badges are processed Monday through Friday from 7:00 a.m. to 4:00 p.m. No appointment is necessary. Upon completion or termination of the contract or termination of a contractor employee, the Contractor shall surrender any identification badges and vehicle identification to the Contracting Officer Representative or Security Forces.
4.6.2 ACCESS. Contractor shall apply for flight-line access badge at Base Operations, Bldg. 122, in order to service the flight-line OWS at Peterson SFB.
4.6.3 VEHICLE REQUIREMENTS CMSFS: Proper state vehicle registration, proof of insurance, grease waste registration, and a valid driver’s license are required to drive on base. After obtaining the proper badges/vehicle identification at the Visitor Control Center (Bldg. 15), CMSFS, all commercial vehicles must enter through the Main Gate (Norad Road), the primary search area for all commercial delivery vehicles.
4.6.4 REQUIREMENTS FOR VEHICLE ENTRY INTO CMSFS. Only vehicles used to conduct official business and those affixed with a CMSFS parking decal and an authorization letter from 21 MSG/CC are allowed entry into the restricted area. The Contractor may be permitted to transport all needed personnel, materials, and equipment to the work site. Contractors will load/unload and leave the area. Propane fueled or compressed natural gas vehicles are prohibited within the restricted area. The contractor must submit the request for a vehicle to enter the restricted area on company letterhead; and an officer of the company must sign the letter. The following required information must appear on vehicle request letters: Contract number, model of vehicle, make of vehicle, vehicle license number & state, vehicle identification number, whether gasoline powered and whether the vehicle will be parked temporarily inside the Cheyenne Mountain Complex (CMC). Submit the letter to the COR personnel for processing at least two (2) weeks before requested entry date. The contractor will keep a copy of the vehicle entry authorization letter in each vehicle listed on the letter. The contractor must show the letter to the entry controller each time the vehicle enters the CMC. Because CMSFS is a unique installation, the truck used on the inside of the complex will need to fit through a 9’ - 51/2” wide x 1 0' - 5" high opening.
4.6.5 VEHICLE REQUIREMENTS PSFB: Proper state vehicle registration, proof of insurance, grease waste registration, and a valid driver’s license are required to drive on base. After obtaining the proper badges/vehicle identification at the Visitor Control Center (Bldg. 1334), all commercial vehicles must enter through the East Gate (Marksheffel Road), the primary search area for all commercial delivery vehicles.
4.7 SAFETY ON AN AIR FORCE INSTALLATION: The contractor shall comply with Department of the Air Force Instruction (DAFI) 91-207 “the US Air Force Traffic Safety Program, Chapter 3”, is a mandatory policy for each individual while on all Air Force (AF) Installations. All work will be accomplished in accordance with specifications outlined in applicable Occupational Safety and Health Administration (OSHA) and Air Force Occupational Safety and Health Standards (AFOSH).
4.8 PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE
NATIONAL COMMAND AUTHORITY. IAW Department of Defense Instruction (DODI) 3020.37, paragraph E2.1.1., a crisis situation is defined as: Any emergency so declared by the National Command Authority or the overseas Combatant Commander, whether or not U.S. Armed Forces are involved, minimally encompassing civil unrest or insurrection, civil war, civil disorder, terrorism, hostilities buildup, wartime conditions, disasters, or international conflict presenting a serious threat to DOD interests. The contractor is not required to perform services during a crisis unless otherwise directed by an authorized government representative.
4.9 GREEN PROCUREMENT AND HAZARDOUS MATERIALS/WASTE. Refer to US Environmental Protection Agency (EPA)’s list of EPA-designed products at www.epa.gov/ Comprehensive Procurement Guideline (CPG) program is part of US Environmental Protection Agency (EPA) continuing effort to promote the use of materials recovered from solid waste. Buying recycled-content products ensures that the materials collected in recycling programs will be used again in the manufacture of new products. Cheyenne Mountain SFS prefers to acquire products that contain recycled-content, bio-based, energy efficient and low volatile organic compounds (VOC). In the accomplishment of this contract, the contractor shall use non-flammable, environmentally friendly, bio-degradable cleaning products. Refer to EPA’s list of EPA-designed products at www.epa.gov/cpg/cpg/products.htm listing 8 CPG product categories, including all the specific products available and provides 8 overview Product Resource Guides and a mechanism to suggest a product.
4.10 HAZARDOUS MATERIALS. In the accomplishment of this contract, the contractor will use non-flammable, environmentally friendly, biodegradable products (IAW) Air Force Manual (AFMAN) 32-7002, Environmental Compliance and Pollution Prevention. The contractor shall list all proposed hazardous materials to be used on this project on the Air Force (AF) Form 3952, Chemical/Hazardous-Material Request Authorization and Material Safety Data Sheets (MSDS) and submit the AF Form 3952 to the COR, ten (10) days prior to commencing work. The proposed hazardous materials shall be reviewed and authorized for use on this project. Upon request, the contractor must have a copy of the approved MSDS form at the work site. The contractor shall be responsible for containing, handling, and cleanup of all spills, which might occur while providing the maintenance service on all Oil Water Separators listed in this PWS. Cost to dispose of spilled material and any other waste items resulting from the spill will be the responsibility of the contractor. Report immediately all spills to the Base Fire Department at (719) 474-3030 or 911.
4.11 CONTRACTOR MANPOWER REPORTING
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the UNITED STATES AIR FORCE via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/ Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil .
Page 10 of
SECTION V
APPENDIX A ESTIMATED WORKLOAD DATA
OIL & WATER SEPARATORS ROUTINE MAINTENANCE:
21 CES/PSFB
5.1 OIL & WATER SEPARATORS ROUTINE MAINTENANCE: Government estimates the following frequencies for the following buildings: (See Oil & water Separator and Sediment Trap Table next page.)
OIL/WATER SEPARATOR AND SEDIMENT TRAP LOCATIONS AND CAPACITIES (PSFB)
| ITEM |
| BLDG # |
| LOCATION ACTIVITY |
| LOCATION OF SEPARATORS/SEDI- MENT TRAPS |
| TOTAL CAPACITY |
(gallons)
OIL TANK CAPACITY
(gallons) Frequency
| 1 |
| 208 |
| 302 TAW(RES) |
Corrosion Control
| West Corner of Building 208; Access through 2 manholes. |
| 6,800 |
| 550 |
| Annually |
302 TAW(RES)
Maintenance /Fuel System Dock
| Northeast of Building 210 just off Duluth Ave.; Access through 3 manholes; |
| 5,000 |
| 800 |
| One (1) time Option Period 1 only |
| 3 |
| 214 |
| 302 TAW (RES) |
Maintenance Dock
| Located below a 10’ x 17’ concrete slab east of Building 214; Access through two manholes |
| 7,500 |
| N/A |
| One (1) time Option Period 1 only |
| 4 |
| 502 |
| 302 |
TAW(RES)
A/C Engine Inspection/Re pair
| Grass area along southern side of Building 502; Access through three manholes. |
| 3,500 |
| Oil tank is part |
of separator Annually
| 5 |
| 503 |
| 21 |
MOF/MXOT
A Transit Alert
| Sediment trap located on the northwest side of building. Access requires |
| 1,000 |
| N/A |
| One (1) time Option Period 1 only |
| 6 |
| 668 |
| POL Yard |
| Between fuel dispersal stations on Paine St side of compound; southeast side of 668. |
| 6,000 |
| Oil tank is part |
of separator One (1) time Option Period 1 only
| 7 |
| 1229A |
| Motor Pool Wash Rack |
| Oil Water separator located inside Motor Pool on east side of Building. |
| 4,500 |
| Oil tank is part |
of separator Annually
| 8 |
| 1229B |
| Motor Pool Wash Rack |
| Sediment trap located |
inside Motor Pool on east side of Building.
| 800 |
| N/A |
| One (1) time Option Period 1 only |
| 9 |
| 1255A |
(new)
| Vehicle Maintenance Grated cover |
| Located along Paine Street outside the fence behind Bldg 1255. |
Confined Entry, see PWS Para1.3.
| 2,000 |
| N/A |
| One (1) time Option Period 1 only |
| 10 |
| 1255B |
(old)
| Vehicle Maintenance |
| Located along Paine Street about halfway point of Building 1255 on inside (south side) of the Motor Pool-. Confined Entry, see PWS Para1.3. |
| 3,000 |
| 550 |
| One (1) time Option Period 1 only |
| 11 |
| 1327 |
| Civil Engineer (Snow Barn) |
| East side of 1327. |
| 1,000 |
| N/A |
| One (1) time |
Option Period 1 only
| 12 |
| 2028 |
| Space Control |
| East side of 2028 |
| 1,000 |
| N/A |
| One (1) time Option Period 1 only |
| 13 |
| East Gate |
| 21 SFS |
| Located on the east side of the search pit entry point. |
| 2,250 |
| 1,900 |
Oil tank is part of separator One (1) time Option Period 1 only
5.2 ESTIMATED WORKLOAD DATA FOR GREASE TRAPS ROUTINE MAINTENANCE (PSFB)
Government estimates the following frequencies for the following buildings:
GREASE TRAPS LOCATIONS AND CAPACITIES
ITEM
| ORGANIZATION & BUILDING NUMBER |
| TYPE OF UNIT |
| CAPAC ITY |
| LOCATION & AVAILABLE HOURS |
| FREQU ENCY |
| REFILL TO PIPE |
| 1 |
| Hartinger Building, Bldg 1 (FSS) |
| Grease Trap |
| 10 |
gallons
| Third floor Dining Area kitchen, requires portable pump |
| Monthly |
| 2 |
| NORTHCOM, |
Bldg 2 (AAFES)
| Grease Trap |
| 28 |
gallons
| First floor AAFES kitchen; requires a portable pump |
| Monthly |
| 3 |
| Fire Station, Bldg 218 Flightline access required |
| Grease Trap |
See PWS 4.3.2.2 1,000 gallons
| Outside building on west side |
| Quarterly |
Yes
| 4 |
| Officer’s Club, Bldg 1013 |
(Services)
| Grease Trap |
| 1,400 |
gallons
| Outside building on southeast end |
| Every 2 Months |
| Yes |
| 5 |
| Golf Course Club House, Bldg 1054 (Services) |
| Grease Trap |
| 8-10 |
gallons
| In kitchen, may require a portable pump |
| Quarterly |
| 6 |
| Dining Hall, Bldg 1160 |
| Grease Trap |
| 1,400 |
gallons
| Outside behind building |
| Quarterly |
| Yes |
| 7 |
| Main CDC, Bldg 1350 |
| Grease Trap |
| 50 - 80 |
gallons
| Inside Kitchen, may require portable pump |
| Annually |
| 8 |
| Chapel, Bldg |
| Grease Trap |
| 20 |
gallons
| Inside Kitchen, may require portable pump |
| Quarterly |
| 9 |
| CDC Annex, Bldg 2004 |
| Grease Trap |
| 300 |
gallons
| Outside building Northwest side |
| Semi- Annually |
| Yes |
5.3 EMERGENCY SERVICE CALLS (PSFB/CMSFS): Government estimates one (1) emergency service call per contract year for OWS estimated not to exceed 7,500 gallons. Government estimates one (1) emergency service calls per contract year for Grease Traps not to exceed 1,400 gallons.
5.4 ESTIMATED WORKLOAD DATA FOR SEPTIC TANKS ROUTINE MAINTENANCE (PSFB)
Government estimates the following frequencies for the following buildings:
| ITEM |
| ORGANIZATION & BUILDING |
NUMBER
| TYPE OF UNIT |
| CAPACITY |
| LOCATION |
| FREQUENCY |
| 1 |
| East Gate Bldg 2015 (SFS) |
| Septic Tank |
| 1500 gallons |
| In rocks between cars lane & search |
pit Every 2 months
SECTION VI
APPENDIX A
ESTIMATED WORKLOAD DATA
OIL & WATER SEPARATORS ROUTINE MAINTENANCE: 21 CES/CMSFS
6.1 Government estimates the following frequencies for the following buildings:
OIL/WATER SEPARATOR AND SEDIMENT TRAP LOCATIONS AND CAPACITIES (CMSFS)
| ITEM |
| BUILDING NUMBER |
| LOCATION/ ACTIVITY |
| LOCATION OF SEPARATORS/SEDIMENT TRAPS |
| TOTAL CAPACITY |
(gallons) Freque ncy
| 1 |
| 302 OWS |
| 21 CES Wash Rack |
| Outside building 302 on the south east corner |
| 800 |
| Semi- annual |
| 2 |
| 302 |
| 21 CES Wash Rack |
| 2 sediment traps located inside wash rack |
| 500 |
| Semi- annual |
| 3 |
| 319 OWS |
| Located at corner of south portal road and across from lift station 3 |
| 25,000 |
| Semi- annual |
| 4 |
| 300 |
| 21 CES |
Roads/Grounds Shop
| 2 sediment traps located in bay area of building 300 and replace the mats on the grates |
| 500 |
| Semi- annual |
| 5 |
| 309 |
| Fire Dept #2 |
Located on East Side of Building
| 500 |
| Annual |
| 6 |
| 326 |
| Wildland Fire |
North side of building by the ditch
| 500 |
| Annual |
| 7 |
| Pit 52 |
| CMC |
| Sediment trap located on the northwest side of building. Access requires wrench. |
| 1,000 |
| Annual |
| 8 |
| 12501 |
| Main Blast Door |
| 1 sediment traps located inside and 1 outside main blast door |
| 500 |
| Annual |
| 9 |
| 12109 |
| Auxiliary Cooling Towers |
Underneath Aux Tower Walkway
| 500 |
| Annual |
| 10 |
| 12505 |
| Main Cooling Towers |
Underneath Main Cooling Tower #7
| 500 |
| Annual |
6.2 GREASE TRAPS ROUTINE MAINTENANCE
6.2.1 Government estimates the following frequencies for the following buildings:
GREASE TRAPS LOCATIONS AND CAPACITIES (CMSFS)
ITEM
| ORGANIZA TION & BUILDING NUMBER |
| TYPE OF UNIT |
| CAPACI TY |
| LOCATION & AVAILABLE HOURS |
| FREQU ENCY |
| REFILL TO T PIPE |
| 1 |
| Building 1000 |
| Grease Trap |
| 2-250 |
gallon
| Underneath building 1000 to the left of the main entrance in chamber A |
| semi- annual |
| YES |
APPENDIX B: PUBLICATIONS, FORMS & CERTIFICATES
Documents applicable to this PWS are listed below. The contractor is obligated to follow those listed and only to the extent stated in the PWS. It is the contractor’s responsibility to ensure that all publications in his or her possession are up to date. Publications are available at http://www.e-publishing.af.mil/ Website will show the most current versions of the publication.
| PUBLICATIONS |
| TITLE AND APPLICABLE PARAGRAPH(S) |
| PWS |
| Department Of The Air Force |
| Driving on all Air Force Installations: “USAF Traffic Safety |
| 4.7 |
| Instruction (DAFI) |
| Program”, Chapter 3 |
91-207 (9 January
2024)
Department of Defense Instruction (DODI) 3020.37 (26 Jan 1996)
| DODI 3020.37, Continuation of Essential DoD Contractor Services. |
| 4.8 |
| The Clean Water Act |
| Title 3, “Standards and Enforcement”, and Title 4, “Permits and Licenses” |
| 1.2 |
Oil Pollution Act of 1990
| Section 1001 |
| 1.2 |
| Title 29 CFR, Part 1910, Chapter XVII |
| Code of Federal Regulation (CFR) for Occupational Safety & Health Administration-Labor Website: www.osha.gov |
| 1.2 |
| Title 40 CFR Part 110, “Discharge of Oil” |
| Code of Federal Regulation for Protection of the Environment Website: browse to 40 CFR. https://www.ecfr.gov/ |
| 1.2 |
| Title 40 CFR |
| Code of Federal Regulation for Protection of the Environment |
| 1.2 |
| Subpart F, |
| Website: browse to 40 CFR. https://www.ecfr.gov/ |
“Releases from
Solid Waste
Title 40 CFR Part 112, “Oil Pollution Prevention”
| Code of Federal Regulation for Protection of the Environment Website: browse to 40 CFR. https://www.ecfr.gov/ |
| 1.2 |
| Title 40 CFR, |
| Code of Federal Regulation for Protection of the Environment |
| 1.2 |
Parts: 104-149, 401-471, Website: browse to 40 CFR. https://www.ecfr.gov/
| US DOT Federal Motor Carrier Safety Administration (FMCSA) |
| Commercial Motor Vehicle Safety Act of 1986 Website: http://www.fmcsa.dot.gov |
| 1.2 |
| 6 CCR 1007-2 |
| Solid and Hazardous Waste Commission/Hazardous Materials and Waste Management Division 6 CCR 1007-2 |
PART 1 - REGULATIONS PERTAINING TO SOLID WASTE SITES AND
FACILITIES Website https://cdphe.colorado.gov/all-regulations/solid-waste-regulations 1.2
Forms
SG-2
Uniform Waste Grease Manifest
PWS Attachments: