Cyber Warning & Operations Center Justification & Approval .
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CWOC_PWS_6_MONTH_BRIDGE_9_Jan_2018_FBO_post.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
Justification and Approval (J&A) for Other Than Full and Open Competition
FOR OFFICIAL USE ONLY 14 Nov 2017 Page 1 of 5
Is this a new or amended J&A Document? New Amended ( Prior to Award Only! )
Funding level for this acquisition: < $700K > $700K and < $13.5M > $13.5M and < $93M > $93M
Contracting Activity: 21CONS/PKC
Purchase Request / Local ID Number: F3LNHAXXXXXXX
Program / Project (and PE, if applicable): NORAD and USNORTHCOM Cyber Warning & Operations Center (CWOC) Support
Program Type (PEO or Other Contracting): other
Authority: 6.302-1 – 10 USC 2304(c)(1), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements
Estimated Contract Cost (including options): $2,539,103.10 J&A Type: Class Individual
COORDINATION (AFFARS 5306 . 304 ( a) ) ** The text in the signature blocks below is editable, including the title.
** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.
APPROVAL (AFFARS 5306 . 304 ( a) )
NOTE: If a Justification and Approval was approved for the preceding acquisition, a copy of the approved J&A for the predecessor action must be included in the staff package for approval of the instant J&A. This applies to J&A staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor J&A will be used as a reference document by the approving official.
Sign and Save Procedure
FOR OFFICIAL USE ONLY 14 Nov 2017 Page 2 of 5
(See "Specific Guidance for Completing this Template" below.)
I. Contracting Activity.
21 CONS/PKC
135 Dover Street, Bldg. 350
Peterson AFB, CO 80914
II. Nature and/or description of the action being processed.
The Government intends to solicit through other than full and open competition, a firm fixed price contract to S4, Inc for NORAD & USNORTHCOM (N&NC) Cyberspace Operations and Warning Center (CWOC) and the Defensive Cyber Operations (DCO) services. S4 is the incumbent small business and this action is for a six (6) month bridge contract along with six (6) one month options. These items are being procured using O&M (3400) funds.
III. Description of supplies/services required to meet agency needs.
The requirement is for continued support of N&NC CWOC Information Assurance and Defensive Cyber Operations (DCO) to conduct 24/7/365 support required for N&NC Headquarters, service components, Joint Task Forces, and their mission partners in the areas of: Defensive Cyber Operations (DCO), Information Assurance (IA), Information Technology (IT) services, information exchange, information sharing efforts, net-centric operations, and command and control and communications processes and solutions in support of IT C4 systems operations and assessments, for information synchronization and network operations (NetOps). The delivery period of performance is 6 February 2018 through 5 August 2018.
IV. Statutory authority permitting other than full and open competition.
10 U.S.C. 2304(c)(1), as implemented by FAR 6.302-1(a)(2)(iii)(A), services may be deemed to be available only from the original source in the case of follow-on contract for the continued provision of highly specialized service when it is likely that award to any other source would result in substantial duplication of cost to the Government that is not expected to be recovered through competition.
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
N&NC is currently engaged in the competitive acquisition of a five year contract for Cyberspace Operations and Warning Center (CWOC) and Defensive Cyber Operations (DCO) services. N&NC is utilizing the DoD Information Analysis Centers Program Management Office (DSIAC), Defense Technical Information Center (DTIC), an inter-agency acquisition, to procure the CWOC DCO support services contract. These services were previously procured by 21CONS.
This successor acquisition is encountering unexpected delays that will result in a break in these highly specialized services if an interim contract is not awarded. In order for 21CONS to competitively award a contract for the aforementioned services to prevent a break in service, substantial duplication of cost will occur not expected to be recovered through competition. Competing an additional CWOC requirement would incur non-recoverable costs to recruit, train, and certify another contractor's staff for continued mission support for this short six month maximum performance period. This CWOC requirement is being absorbed into a DTIC task order that combines multiple
FOR OFFICIAL USE ONLY 14 Nov 2017 Page 3 of 5 requirements and is currently estimated to be awarded in Aug 2018. This justification allows for a contract modification that will add up to a six month period of performance to ensure sustainment until award and transition period of the DTIC task order is completed. Only the minimum number of months (up to six) required to transition the work under this task order to the competitive follow-on will be used.
A noncompetitive bridge contract to the incumbent contractor, S4, Inc. allows for streamlined evaluations/ negotiations to complete, utilizing current contract pricing (already determined fair and reasonable) as the basis for negotiation for a short six month contract with six one-month options. Utilizing a competitive contract award approach will require a team of individuals to evaluate, document, an award the contract action, similar to the team that is already working on the competitive acquisition taking place at the DTIC. Applying the limited acquisition resources to evaluating multiple contract vehicles at the same time would duplicate activities being performed for the current follow-on DTIC acquisition already underway, further delaying the DTIC task order award. This would be an inefficient use of the N&NC organization's resources already strained due to other on-going mission requirements. The dedicated efforts of a five person team consisting of 21 CONS and N&NC personnel plus reviewers and clearance officials costs over $50K/month which is duplicated at the DTIC task order award. Furthermore, the estimated costs to transition to a new contractor is $209K which is also a cost duplicated at the DTIC task order award.
Not continuing the existing contract could introduce new contractors without the required knowledge and experience which directly impacts the CWOC and DCO operations. Training new contractors would consume time that could be better utilized in carrying out daily operations
S4, Inc. is currently performing the CWOC and DCO contract and will be retained to ensure mission critical delays do not occur while the new contract acquisition can be completed. Currently, S4 Inc. personnel are the only contractors who hold all the required certifications and clearances for immediate/continual performance and prevention of a break-in-service. Obtaining 17 new top secret security clearances could cost up to $255K, if these personnel are not retained. This cost would definitely not be recovered through competition. They are also intimately familiar with the N&NC Cyberspace mission, and they are fully capable of continuing performance during the delay in award under competitive contractual procedures. S4 Inc. having the certifications and clearances in-place will ensure no break-in-service, no additional startup/administrative burdens/costs associated with demobilizing incumbent contract personnel, closing out badging/credentials of these personnel; then mobilizing a potential new contractor with the required badging/credentialing.
For the reasons described formally, completing an additional competitive acquisition, combined with the costs of a transitioning a new contractor to complete a short term contract adds significant duplication of costs that utilizing a short term bridge contract does not.
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
Under subject J&A, N&NC/J6 provided technical documentation for execution of a follow-on competitive contractual action in a timely manner, but interaction with the cognizant contracting officer created an acquisition situation where a bridge contract was required because the follow-on competitive contractual action could not be executed in a timely manner and would create a critical break-in-services to CWOC. Based upon time frames involved and the acquisition situation described in paragraph V, the successor contractual efforts will be a competitive contractual action anticipated for award during the six (6) months of the J&A period, but requires a non-competitive contractual action to the S4 Inc. to ensure no critical break-in-service.
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
The Contracting Officer (CO) anticipates the cost to the Government will be determined to be fair and reasonable on the basis of price and/or cost analysis and by using certified cost or pricing data to analyze elements of cost starting
FOR OFFICIAL USE ONLY 14 Nov 2017 Page 4 of 5 negotiations with the current contract pricing. The proposed labor staffing and technical approach will be evaluated by the Government technical evaluators and the results of the technical evaluation will be used in the development of the Government objective. In addition, assistance will be requested from the Defense Contract Audit Agency (DCAA) and/or Defense Contract Management Agency (DCMA) for the results of recent audits and for any applicable Forward Pricing Rate Recommendations (FPRAs) or Forward Pricing Rate Agreements (FPRAs).
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
For this acquisition, the Government did not conduct market research as this is a bridge for continued support being provided by the incumbent contractor. Pricing research has been conducted by reviewing the historical costs/funding on the current contract.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
As stated in paragraph V above, the proposed 6-month contract bridge would ensure continuation of mission essential services. S4, Inc., the contractor currently performing in the CWOC DOD Information Network (DODIN) Section as well as Defensive Cyber Operations (DCO), both conducting 24/7/365 monitoring, reporting and analysis for the N&NC Command and Control Systems under contract FA2517-12-D-9001-0004 MOD 17. S4 personnel hold required certifications and clearances for performance, is familiar with the complexity of N&NC Cyber Space mission, and is fully capable of performing the proposed contract. Any break-in-service will result in additional administrative burdens/ costs associated with demobilizing incumbent contract personnel, closing out badging/credentials of these personnel;
mobilizing a potential new contractor with the required badging/credentialing and the elimination of a proper phase-in/phase-out period to ensure seamless transition. Because of the critical nature of the CWOC services and the acquisition situation the CWOC requirement is currently in, a follow-on 6-month contractual action is the only available contractual execution methodology available to ensure there is no break-in-service.
X. List of any sources that expressed, in writing, an interest in the acquisition.
No other sources were requested, the successor acquisition will be released for competition.
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
The Government is currently engaged in the acquisition strategy to acquire successor services competitively in a follow-on Base Year, plus four (4) one (1) year option periods through a new contract being executed by the DoD Information Analysis Centers Program Management Office (DSIAC), Defense Technical Information Center (DTIC) as an inter-agency acquisition of CWOC DCO support contract.
The Commander of NORAD and USNORTHCOM, General Lori J. Robinson, USAF, approved this service acquisition greater than $10M in a signed Requirements Approval Document, dated 17 April 2017.
Opportunities for industry to participate competitively in the planned follow-on will occur through a release for proposal to industry with fair opportunity ordering under the DTIC contract vehicle.
This contract bridge is to support the potential gap in services during the follow on acquisition, release for proposal, source selection and transition period.
FOR OFFICIAL USE ONLY 14 Nov 2017 Page 5 of 5
XII. Certification by the Contracting Officer.
As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.
XIII. Certification by the technical/requirements personnel.
As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.
Remove the Guidance pages below. Remove the IACR pages below.
| I. Contracting Activity. |
| II. Nature and/or description of the action being processed. |
| III. Description of supplies/services required to meet agency needs. |
| IV. Statutory authority permitting other than full and open competition. |
| V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority). |
| VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable. |
| VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable. |
| VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted. |
| IX. Any other facts supporting the use of Other Than Full and Open Competition. |
| X. List of any sources that expressed, in writing, an interest in the acquisition. |
| XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required. |
| XII. Certification by the Contracting Officer. |
| XIII. Certification by the technical/requirements personnel. |