FA2517-13-R-8001_GEODSS_DRAFT_RFP.pdf
PDF 1 MB Posted
- Attached to
- REQUEST FOR PROPOSAL for GROUND-BASED ELECTRO-OPTICAL DEEP SPACE SURVEILLANCE (GEODSS) Federal contract opportunity
- Solicitation number
- FA2517-13-R-8001
About this file
Draft RFP
View the file
Other files for this federal contract opportunity
Show all 50
REQUEST FOR PROPOSAL for GROUND-BASED ELECTRO-OPTICAL DEEP SPACE SURVEILLANCE (GEODSS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A
X B
C
D
EX
X
G
F 61 - 64
65 - 84
H 85 - 89
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
DO-A7 1 89
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
FA2517 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 24
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
26 - 28 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 29 - 33 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror)
X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
34 - 59
PART II - CO NTRACT CLAUSES
FA2517 - 21 CONS/LGCZB
SANDY C. CONNER
719-556-8525
135 DOVER STREET, SUITE 1055
PETERSON AFB CO 80914-1117
719-556-8525
719-556-7396FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
FA2517-13-R-8001
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each Phase-In Det 1 Socorro, NM
FFP
Phase-In, Det 1 Socorro, NM: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the Performance Work Statement
(PWS) as Government Furnished Property or Services, provide Non-Personal
Services for all personnel, supervision, transportation, items and services necessary to perform Phase-In services as stated in GEODSS PWS, Section 1, Chapter 13, Para 13.3. Period of Performance: 1 Aug 15 - 30 Sept 2015.
FOB: Destination
SIGNAL CODE: A
NET AMT
Phase-In Det 2 Diego Garcia
FFP
Phase-In, Det 2 Diego Garcia: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the Performance Work Statement
(PWS) as Government Furnished Property or Services, provide Non-Personal
Services for all personnel, supervision, transportation, items and services necessary to perform Phase-In services as stated in GEODSS PWS, Section 1, Chapter 13, Para 13.3. Period of Performance: 1 Aug 15 - 30 Sept 2015.
Phase-In Det 3 Maui, HI
FFP
Phase-In, Det 3 Maui, HI: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the Performance Work Statement (PWS) as
Government Furnished Property or Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform
Phase-In services as stated in GEODSS PWS, Section 1, Chapter 13, Para 13.3.
Period of Performance: 1 Aug 15 - 30 Sept 2015.
0101 12 Months FY16 OM&S Det 1 Socorro NM
FFP
Base Year - Det 1, Socorro NM: Operations Maintenance and Support (OM&S)
Services: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the PWS as Government Furnished Property or Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform services as stated in the PWS. Included are all
Civil Engineering equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS Section 1, Chapter 9, Para 9.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of Performance: 1 Oct 2015 - 31 Aug 2016.
0102 12 Months FY16 OM&S Det 2 Diego Garcia
FFP
Base Year - Det 2, Diego Garcia: Operations Maintenance and Support (OM&S)
Services: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the PWS as Government Furnished Property or Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform services as stated in the PWS. Included are all
Civil Engineering equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS Section 1, Chapter 9, Para 9.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of Performance: 1 Oct 2015 - 31 Aug 2016.
0103 12 Months FY16 OM&S Det 3 Maui, HI
FFP
Base Year - Det 3, Maui, HI: Operations Maintenance and Support (OM&S)
Services: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the PWS as Government Furnished Property or Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform services as stated in the PWS. Included are all
Civil Engineering equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS Section 1, Chapter 9, Para 9.1. Also included are all consumable items that may be necessary as part of day-to-day site operations.Period of Performance: 1 Oct 2015 - 31 Aug 2016.
0104 Lot FY16 Logistics
COST
Base Year - Local Purchase/Travel: The Contractor shall be reimbursed for weapon system parts and supplies not obtainable through SBSS IAW PWS
Section 1, Chapter 6, Para 6.5. The Contractor shall be reimbursed for parts and materials necessary for Civil Engineering repairs as stated in PWS Section 1, Chapter 9, Para 9.2. The Contractor shall be reimbursed for government-approved TDY and non-local travel IAW PWS 6.10. The Contractor will be reimbursed IAW Section G, Para 3. a. Period of Performance: 1 Oct 2015 - 31
Aug 2016.
ESTIMATED COST
0105 Lot FY16 Individual Job Orders
COST
Base Year - Separately negotiated projects within the scope of the contract not specifically identified in the PWS, but which is still within the general scope of the contract IAW PWS Section 1, Ch. 6, Para 6.13. Period of Performance: 1 Oct
2015 - 31 Aug 2016.
0106 Lot FY16 Det 1 Termination Liability
COST
Base Year - Det 1 Socorro, NM: Termination Liability Contingencies. Cost for informational purposes only. IAW DFARS Clause 252.232-7007 - Limitation of
Government's Obligation and in the circumstances where the Government must incrementally fund firm-fixed price CLINs, identify the costs required to terminate the contract should additional funds not become available for CLINS 0101-0103.
The proposed amount should reflect the maximum estimated termination costs should additional funding not become available. Period of Performance: 1 Oct
0107 Lot FY16 Det 2 Termination Liability
COST
Base Year - Det 2, Diego Garcia: Termination Liability Contingencies. Cost for informational purposes only. IAW DFARS Clause 252.232-7007 - Limitation of
Government's Obligation and in the circumstances where the Government must incrementally fund firm-fixed price CLINs, identify the costs required to terminate the contract should additional funds not become available for CLINS 0101-0103.
The proposed amount should reflect the maximum estimated termination costs should additional funding not become available. Period of Performance: 1 Oct
0108 Lot FY16 Det 3 Termination Liability
COST
Base Year - Det 3, Maui, HI: Termination Liability Contingencies. Cost for informational purposes only. IAW DFARS Clause 252.232-7007 - Limitation of
Government's Obligation and in the circumstances where the Government must incrementally fund firm-fixed price CLINs, identify the costs required to terminate the contract should additional funds not become available for CLINS 0101-0103.
The proposed amount should reflect the maximum estimated termination costs should additional funding not become available. Period of Performance: 1 Oct
1001 12 Months OPTION FY17 OM&S Det 1 Socorro NM
FFP
Option Year 1 - Det 1, Socorro NM: Operations Maintenance and Support
(OM&S) Services: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the PWS as Government Furnished Property or
Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform services as stated in the
PWS. Included are all Civil Engineering equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS
Section 1, Chapter 9, Para 9.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of Performance: 1 Sept 2016
- 31 Aug 2017.
1002 12 Months OPTION FY17 OM&S Det 2 Diego Garcia
FFP
Option Year 1, Det 2, Diego Garcia: Operations Maintenance and Support
(OM&S) Services: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the PWS as Government Furnished Property or
Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform services as stated in the
PWS. Included are all Civil Engineering equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS
Section 1, Chapter 9, Para 9.1. Also included are all consumable items that may be necessary as part of day-to-day site operations.Period of Performance: 1 Sept 2016
- 31 Aug 2017.
1003 12 Months OPTION FY17 OM&S Det 3 Maui, HI
FFP
Option Year 1, Det 3, Maui, HI: Operations Maintenance and Support (OM&S)
Services: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the PWS as Government Furnished Property or Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform services as stated in the PWS. Included are all
Civil Engineering equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS Section 1, Chapter 9, Para 9.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of Performance: 1 Sept 2016 - 31 Aug 2017.
1004 Lot OPTION FY17 Logistics
COST
Option Year 1 - Local Purchase/Travel: The Contractor shall be reimbursed for weapon system parts and supplies not obtainable through SBSS IAW PWS
Section 1, Chapter 6, Para 6.5. The Contractor shall be reimbursed for parts and materials necessary for Civil Engineering repairs as stated in PWS Section 1, Chapter 9, Para 9.2. The Contractor shall be reimbursed for government-approved TDY and non-local travel IAW PWS 6.10. The Contractor will be reimbursed IAW Section G, Para 3. a. Period of Performance: 1 Sept 2016 - 31
Aug 2017.
1005 Lot OPTION FY17 Individual Job Orders
COST
Option Year 1 - Separately negotiated projects within the scope of the contract not specifically identified in the PWS, but which is still within the general scope of the contract IAW PWS Section 1, Ch. 6, Para 6.13. Period of Performance: 1 Sept
2016 - 31 Aug 2017.
1006 Lot OPTION FY17 Det 1 Termination Liability
COST
Option Year 1 - Det 1, Socorro, NM: Termination Liability Contingencies. Cost for informational purposes only. IAW DFARS Clause 252.232-7007 - Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm-fixed price CLINs, identify the costs required to terminate the contract should additional funds not become available for CLINS 0101-0103.
The proposed amount should reflect the maximum estimated termination costs should additional funding not become available. Period of Performance: 1 Sept
1007 Lot OPTION FY17 Det 2 Terminiation Liability
COST
Option Year 1 - Det 2, Diego Garcia: Termination Liability Contingencies. Cost for informational purposes only. IAW DFARS Clause 252.232-7007 - Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm-fixed price CLINs, identify the costs required to terminate the contract should additional funds not become available for CLINS 0101-0103.
The proposed amount should reflect the maximum estimated termination costs
1008 Lot OPTION FY17 Det 3 Terminiation Liability
COST
Option Year 1 - Det 3, Maui, HI: Termination Liability Contingencies. Cost for informational purposes only. IAW DFARS Clause 252.232-7007 - Limitation of
Government's Obligation and in the circumstances where the Government must incrementally fund firm-fixed price CLINs, identify the costs required to terminate the contract should additional funds not become available for CLINS 0101-0103.
The proposed amount should reflect the maximum estimated termination costs
2001 12 Months OPTION FY18 OM&S Det 1 Socorro NM
FFP
Option Year 2 - Det 1, Socorro NM, Operations Maintenance and Support
(OM&S) Services: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the PWS as Government Furnished Property or
Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform services as stated in the
PWS. Included are all Civil Engineering equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS
Section 1, Chapter 9, Para 9.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of Performance: 1 Sept 2017
- 31 Aug 18.
2002 12 Months OPTION FY18 OM&S Det 2 Diego Garcia
FFP
Option Year 2 - Det 2, Diego Garcia, Operations Maintenance and Support
(OM&S) Services: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the PWS as Government Furnished Property or
Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform services as stated in the
PWS. Included are all Civil Engineering equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS
Section 1, Chapter 9, Para 9.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of Performance: 1 Sept 2017
- 31 Aug 18.
2003 12 Months OPTION FY18 OM&S Det 3 Maui, HI
FFP
Option Year 2 - Det 3, Maui HI, Operations Maintenance and Support (OM&S)
Services: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the PWS as Government Furnished Property or Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform services as stated in the PWS. Included are all
Civil Engineering equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS Section 1, Chapter 9, Para 9.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of Performance: 1 Sept 2017 - 31 Aug 18.
2004 Lot OPTION FY18 Logistics
COST
Option Year 2 - Local Purchase/Travel: The Contractor shall be reimbursed for weapon system parts and supplies not obtainable through SBSS IAW PWS
Section 1, Chapter 6, Para 6.5. The Contractor shall be reimbursed for parts and materials necessary for Civil Engineering repairs as stated in PWS Section 1, Chapter 9, Para 9.2. The Contractor shall be reimbursed for government-approved TDY and non-local travel IAW PWS 6.10. The Contractor will be reimbursed IAW Section G, Para 3. a. Period of Performance: 1 Sept 2017 - 31
Aug 18.
2005 Lot OPTION FY18 Individual Job Orders
COST
Option Year 2 - Separately negotiated projects within the scope of the contract not specifically identified in the PWS, but which is still within the general scope of the contract IAW PWS Section 1, Ch. 6, Para 6.13. Period of Performance: 1 Sept
2017 - 31 Aug 18.
2006 Lot OPTION FY18 Det 1 Terminiation Liability
COST
Option Year 2 - Det 1, Socorro, NM: Termination Liability Contingencies. Cost for informational purposes only. IAW DFARS Clause 252.232-7007 - Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm-fixed price CLINs, identify the costs required to terminate the contract should additional funds not become available for CLINS 2001-2003.
The proposed amount should reflect the maximum estimated termination costs
2007 Lot OPTION FY18 Det 2 Terminiation Liability
COST
Option Year 2 - Det 2, Diego Garcia: Termination Liability Contingencies. Cost for informational purposes only. IAW DFARS Clause 252.232-7007 - Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm-fixed price CLINs, identify the costs required to terminate the contract should additional funds not become available for CLINS 2001-2003.
The proposed amount should reflect the maximum estimated termination costs
2008 Lot OPTION FY18 Det 3 Terminiation Liability
COST
Option Year 2 - Det 3, Maui, HI: Termination Liability Contingencies. Cost for informational purposes only. IAW DFARS Clause 252.232-7007 - Limitation of
Government's Obligation and in the circumstances where the Government must incrementally fund firm-fixed price CLINs, identify the costs required to terminate the contract should additional funds not become available for CLINS 2001-2003.
The proposed amount should reflect the maximum estimated termination costs
3001 12 Months OPTION FY19 OM&S Det 1 Socorro NM
FFP
Option Year 3 - Det 1, Socorro NM, Operations Maintenance and Support
(OM&S) Services: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the PWS as Government Furnished Property or
Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform services as stated in the
PWS. Included are all Civil Engineering equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS
Section 1, Chapter 9, Para 9.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of Performance: 1 Sept 2018
- 31 Aug 2019.
3002 12 Months OPTION FY19 OM&S Det 2 Diego Garcia
FFP
Option Year 3 - Det 2, Diego Garcia, Operations Maintenance and Support
(OM&S) Services: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the PWS as Government Furnished Property or
Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform services as stated in the
PWS. Included are all Civil Engineering equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS
Section 1, Chapter 9, Para 9.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of Performance: 1 Sept 2018
- 31 Aug 2019.
3003 12 Months OPTION FY19 OM&S Det 3 Maui, HI
FFP
Option Year 3 - Det 3, Maui HI, Operations Maintenance and Support (OM&S)
Services: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the PWS as Government Furnished Property or Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform services as stated in the PWS. Included are all
Civil Engineering equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS Section 1, Chapter 9, Para 9.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of Performance: 1 Sept 2018 - 31 Aug 2019.
3004 Lot OPTION FY19 Logistics
COST
Option Year 3 - Local Purchase/Travel: The Contractor shall be reimbursed for weapon system parts and supplies not obtainable through SBSS IAW PWS
Section 1, Chapter 6, Para 6.5. The Contractor shall be reimbursed for parts and materials necessary for Civil Engineering repairs as stated in PWS Section 1, Chapter 9, Para 9.2. The Contractor shall be reimbursed for government-approved TDY and non-local travel IAW PWS 6.10. The Contractor will be reimbursed IAW Section G, Para 3. a. Period of Performance: 1 Sept 2018 - 31
Aug 2019.
3005 Lot OPTION FY19 Individual Job Orders
COST
Option Year 3 - Separately negotiated projects within the scope of the contract not specifically identified in the PWS, but which is still within the general scope of the contract IAW PWS Section 1, Ch. 6, Para 6.13. Period of Performance: 1 Sept
2018 - 31 Aug 2019.
3006 Lot OPTION FY19 Det 1 Terminiation Liability
COST
Option Year 3 - Det 1, Socorro, NM: Termination Liability Contingencies. Cost for informational purposes only. IAW DFARS Clause 252.232-7007 - Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm-fixed price CLINs, identify the costs required to terminate the contract should additional funds not become available for CLINS 3001-3003.
The proposed amount should reflect the maximum estimated termination costs should additional funding not become available. Period of Performance: 1 Sept
3007 Lot OPTION FY19 Det 2 Terminiation Liability
COST
Option Year 3 - Det 2, Diego Garcia: Termination Liability Contingencies. Cost for informational purposes only. IAW DFARS Clause 252.232-7007 - Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm-fixed price CLINs, identify the costs required to terminate the contract should additional funds not become available for CLINS 3001-3003.
The proposed amount should reflect the maximum estimated termination costs should additional funding not become available. Period of Performance: 1 Sept
3008 Lot OPTION FY19 Det 3 Terminiation Liability
COST
Option Year 3 - Det 3, Maui, HI: Termination Liability Contingencies. Cost for informational purposes only. IAW DFARS Clause 252.232-7007 - Limitation of
Government's Obligation and in the circumstances where the Government must incrementally fund firm-fixed price CLINs, identify the costs required to terminate the contract should additional funds not become available for CLINS 3001-3003.
The proposed amount should reflect the maximum estimated termination costs should additional funding not become available. Period of Performance: 1 Sept
4001 12 Months OPTION FY20 OM&S Det 1 Socorro NM
FFP
Option Year 4 - Det 1, Socorro NM, Operations Maintenance and Support
(OM&S) Services: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the PWS as Government Furnished Property or
Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform services as stated in the
PWS. Included are all Civil Engineering equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS
Section 1, Chapter 9, Para 9.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of Performance: 1 Sept 2019
- 31 Aug 2020.
4002 12 Months OPTION FY20 OM&S Det 2 Diego Garcia
FFP
Option Year 4 - Det 2, Diego Garcia, Operations Maintenance and Support
(OM&S) Services: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the PWS as Government Furnished Property or
Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform services as stated in the
PWS. Included are all Civil Engineering equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS
Section 1, Chapter 9, Para 9.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of Performance: 1 Sept 2019
- 31 Aug 2020.
4003 12 Months OPTION FY20 OM&S Det 3 Maui, HI
FFP
Option Year 4 -- Det 3, Maui HI, Operations Maintenance and Support (OM&S)
Services: Contractor shall, except for items, equipment, vehicles and services specified in Section 3 of the PWS as Government Furnished Property or Services, provide Non-Personal Services for all personnel, supervision, transportation, items and services necessary to perform services as stated in the PWS. Included are all
Civil Engineering equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS Section 1, Chapter 9, Para 9.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of Performance: 1 Sept 2019 - 31 Aug 2020.
4004 Lot OPTION FY20 Logistics
COST
Option Year 4 - Local Purchase/Travel: The Contractor shall be reimbursed for weapon system parts and supplies not obtainable through SBSS IAW PWS
Section 1, Chapter 6, Para 6.5. The Contractor shall be reimbursed for parts and materials necessary for Civil Engineering repairs as stated in PWS Section 1, Chapter 9, Para 9.2. The Contractor shall be reimbursed for government-approved TDY and non-local travel IAW PWS 6.10. The Contractor will be reimbursed IAW Section G, Para 3. a. Period of Performance: 1 Sept 2019 - 31
Aug 2020.
4005 Lot OPTION FY20 Individual Job Orders
COST
Option Year 4 - Separately negotiated projects within the scope of the contract not specifically identified in the PWS, but which is still within the general scope of the contract IAW PWS Section 1, Ch. 6, Para 6.13. Period of Performance: 1 Sept
2019 - 31 Aug 2020.
4006 Lot OPTION FY20 Det 1 Terminiation Liability
COST
Option Year 4 - Det 1, Socorro, NM: Termination Liability Contingencies. Cost for informational purposes only. IAW DFARS Clause 252.232-7007 - Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm-fixed price CLINs, identify the costs required to terminate the contract should additional funds not become available for CLINS 4001 - 4003.
The proposed amount should reflect the maximum estimated termination costs
4007 Lot OPTION FY20 Det 2 Terminiation Liability
COST
Option Year 4 - Det 2, Diego Garcia: Termination Liability Contingencies. Cost for informational purposes only. IAW DFARS Clause 252.232-7007 - Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm-fixed price CLINs, identify the costs required to terminate the contract should additional funds not become available for CLINS 4001 - 4003.
The proposed amount should reflect the maximum estimated termination costs
4008 Lot OPTION FY20 Det 3 Terminiation Liability
COST
Option Year 4 - Det 3, Maui, HI: Termination Liability Contingencies. Cost for informational purposes only. IAW DFARS Clause 252.232-7007 - Limitation of
Government's Obligation and in the circumstances where the Government must incrementally fund firm-fixed price CLINs, identify the costs required to terminate the contract should additional funds not become available for CLINS 4001 - 4003.
The proposed amount should reflect the maximum estimated termination costs
5001 6 Months Extension of Services Det 1
FFP
Extension of Services - Det 1, Socorro, NM: Continued performance may be required of any services within the limits and rates of Option Year 4. The total extension of performance shall not exceed 6 months IAW FAR Clause 52.217-8.
Period of Performance: 1 Sept 2020 - 28 Feb 2021.
5002 6 Months Extension of Services Det 2
FFP
Extension of Services - Det 2, Diego Garcia: Continued performance may be required of any services within the limits and rates of Option Year 4. The total extension of performance shall not exceed 6 months IAW FAR Clause 52.217-8.
Period of Performance: 1 Sept 2020 - 28 Feb 2021.
5003 6 Months Extension of Services Det 3
FFP
Extension of Services - Det 3, Maui, HI: Continued performance may be required of any services within the limits and rates of Option Year 4. The total extension of performance shall not exceed 6 months IAW FAR Clause 52.217-8. Period of
Performance: 1 Sept 2020 - 28 Feb 2021.
Section E - Inspection and Acceptance
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996
52.246-3 Inspection Of Supplies Cost-Reimbursement MAY 2001
52.246-4 Inspection Of Services--Fixed Price AUG 1996
52.246-5 Inspection Of Services Cost-Reimbursement APR 1984
52.246-15 Certificate of Conformance APR 1984
52.246-16 Responsibility For Supplies APR 1984
252.246-7000 Material Inspection And Receiving Report MAR 2008
252.246-7003 Notification of Potential Safety Issues JUN 2013
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 01-AUG-2015 TO
30-SEP-2015
N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
0101 POP 01-OCT-2015 TO
31-AUG-2016
0102 POP 01-OCT-2015 TO
0103 POP 01-OCT-2015 TO
0104 POP 01-OCT-2015 TO
0105 POP 01-OCT-2015 TO
0106 POP 01-OCT-2015 TO
0107 POP 01-OCT-2015 TO
0108 POP 01-OCT-2015 TO
1001 POP 01-SEP-2016 TO
31-AUG-2017
1002 POP 01-SEP-2016 TO
1003 POP 01-SEP-2016 TO
1004 POP 01-SEP-2016 TO
1005 POP 01-SEP-2016 TO
1006 POP 01-SEP-2016 TO
1007 POP 01-SEP-2016 TO
1008 POP 01-SEP-2016 TO
2001 POP 01-SEP-2017 TO
31-AUG-2018
2002 POP 01-SEP-2017 TO
2003 POP 01-SEP-2017 TO
2004 POP 01-SEP-2017 TO
2005 POP 01-SEP-2017 TO
2006 POP 01-SEP-2017 TO
2007 POP 01-SEP-2017 TO
2008 POP 01-SEP-2017 TO
3001 POP 01-SEP-2018 TO
31-AUG-2019
3002 POP 01-SEP-2018 TO
3003 POP 01-SEP-2018 TO
3004 POP 01-SEP-2018 TO
3005 POP 01-SEP-2018 TO
3006 POP 01-SEP-2018 TO
3007 POP 01-SEP-2018 TO
3008 POP 01-SEP-2018 TO
4001 POP 01-SEP-2019 TO
31-AUG-2020
4002 POP 01-SEP-2019 TO
4003 POP 01-SEP-2019 TO
4004 POP 01-SEP-2019 TO
4005 POP 01-SEP-2019 TO
4006 POP 01-SEP-2019 TO
4007 POP 01-SEP-2019 TO
4008 POP 01-SEP-2019 TO
5001 POP 01-SEP-2020 TO
28-FEB-2021
5002 POP 01-SEP-2020 TO
5003 POP 01-SEP-2020 TO
52.242-15 Stop-Work Order AUG 1989
52.242-15 Alt I Stop-Work Order (Aug 1989) - Alternate I APR 1984
52.242-17 Government Delay Of Work APR 1984
52.247-34 F.O.B. Destination NOV 1991
52.247-52 Clearance and Documentation Requirements-Shipments to
DOD Air or Water Terminal Transshipment Points
FEB 2006
Section G - Contract Administration Data
SECTION G
1. Administrative Matters - The names and telephone numbers for the contracting officer, specialist, and program manager will be provided to the contractor in writing, via letter
a. The address and telephone numbers of the Contracting Officer (CO) and Contract Specialist (CS) are:
21 CONS/LGCZB
135 Dover St Ste 1055 (Bldg 350)
Peterson AFB CO 80914
Contracting Officer Telephone:719-556-1599 (voice) / 719-556-1597 (fax)
Contract Specialist Telephone: 719-556-4269 (voice)/ 719-556-1597 (fax)
b. The address and phone number of the Program Manager is:
21 SW/PMD
135 Dover St Ste 1055 (Bldg 350)
Peterson AFB CO 80914
719-556-4286 (voice) / 719-556-1597 (fax)
c. The address and telephone number of Defense Contract Management Agency (DCMA) and the Administrative
Contracting Officer (ACO) is:
DCMA Baltimore
Baltimore MD 21202-3375
410-962-2104
DoDAAC: S2101A
The address and telephone number of the cognizant Defense Contract Audit Agency (DCAA) office for this contract is:
1601 Research Blvd Rm 167B
Rockville MD 20850 dcaa-fao6281@dcaa.mil
301-838-6740
DoDAAC: HAA450
d. The paying office for this contract is:
DFAS-CO/South Entitlement Operations
P.O. Box 182264
Columbus OH 43218-2264 http://www.dfas.mil/
1-800-756-4571 (Option 1)
DoDAAC: HQ0338
e. The contractor must register through Wide Area Workflow (WAWF) and submit monthly invoices for Electronic
Funds Transfer (EFT) payments through WAWF at https://wawf.eb.mil/
2. Submission of Invoices
a. Invoices submitted by the contractor under this contract shall cite amount invoiced for, the date, contract number, and contract line item number, applicable ACRN associated with the contract line item number, description and invoice period. Invoices shall be submitted via the Wide Area Workflow system in accordance with the WAWF submittal information at the end this section.
b. Fixed Price CLINs:
i. Submit electronic invoices through Wide Area Work Flow – Receipts and Acceptance (WAWF-RA) on the Internet at https://wawf.eb.mil. The “Invoice 2-in-1” electronic document shall be used for all fixed-price billings and shall function as both the Inspection and Acceptance document and the Billing document.
The “Invoice 2-in-1” electronic document shall be prepared by the contractor then routed to the Ground-
Based Electro-Optical Deep Space Surveillance (GEODSS) Program Manager, DoDAAC: _____ (this
BPN/DoDAAC shall be input into the “Ship to Code/Extension” block of the Invoice 2-in-1 document), for acceptance before being routed to the Payment Office.
c. Cost Reimbursable CLINS:
i. For cost reimbursable line items, the Government will reimburse the contractor in accordance with FAR
31.205-46 for Government-authorized TDY/non-local travel as determined to be necessary for the performance of the contract.
ii. The contractor shall submit electronic billings through Wide Area Work Flow – Receipts and Acceptance
(WAWF-RA) via the internet at https://wawf.eb.mil.
A Cost Voucher document shall be used for all cost reimbursable billings. The “Invoice 2-in-1” electronic document shall be prepared by the contractor then routed to the GEODSS Program Manager (21
SW/PMD), DoDAAC ______ (aforementioned BPN shall be input into the ―Ship to Code/Extension block of the “Invoice 2-in-1” document), for acceptance before being routed to the Payment Office.
iii. When submitting a cost reimbursable invoice, the contractor shall adhere to the following process:
1) The contractor shall submit proposed reimbursable costs to the Det CC for authorization.
Submit for authorization only those costs that are determined to be reimbursable IAW PWS
Section 1, paragraphs 1.2.10.2, 5.1, 6.5, 6.10, 6.11, 6.11.1, 9.2 and 11.2.1 and Section 3 paragraphs 3.1.3 and 3.3.3.
2) After reimbursable costs are authorized by the Det CC, complete the top portion of a Standard
Form 1034 and submit, along with supporting documentation, receipts and shipping costs, to
GEODSS Program Manager for approval. See paragraphs (iv) and (v) of this section below for more information.
3) After approval notification is received from GEODSS Program Manager, the contractor shall input billing via WAWF.
iv. Cost reimbursable CLINs for which the contractor is billing shall be submitted no later than 60 days after costs are incurred. Contractor shall identify the contract type billed in the description element under the CLIN tab of WAWF-RA. For each subCLIN billed, identify the corresponding ACRN. Standard Form
1034 and the line item detail supporting each billing shall be sent via email to the GEODSS Program
Manager identified above.
https://wawf.eb.mil/
Additionally, when multiple billings are anticipated under cost reimbursable subCLINs with “1 Lot” as the unit of issue, include the following statement in the billing description: Multiple billings are anticipated; do not close-down this subCLIN.”
v. Invoices for materials authorized under all cost reimbursable CLINs shall be accompanied by one (1) copy of all receipts for reimbursable items and shipping charges. When requesting authorization for such purchases, the contractor shall furnish to the contracting officer’s representative (COR/Det CC), GEODSS
Program Manager and the contracting officer the balance of funds available on the cost reimbursement
CLIN from which the contractor will seek cost reimbursement for the item.
vi. General and Administrative (G&A) expenses (when applicable) will be allowed; fee/profit will not be allowed.
d. Cost Reimbursable – Materials Requiring Item Unique Identification (IUID):
i. IAW the Defense Federal Acquisition Regulation Supplement (DFARS), any single item with a
Government procurement cost of $5,000 or above must be marked with a Item Unique Identification (IUID) and that IUID registered in the IUID Registry. The IUID Registry is the central repository for IUID information and serves as an acquisition gateway. Registration can be completed via the Wide Area
Workflow (WAWF) system when invoicing for reimbursement of the applicable items. Use the “Receiving
Report/Combo Invoice” for reimbursement of any item meeting the requirements of Item Unique
Identification (IUID). Information on submitting invoices for IUID marked items can be obtained at
ii. Invoices for materials authorized under these cost reimbursable CLINs shall be accompanied by one (1) copy of all receipts for reimbursable items and shipping charges. When requesting authorization for such purchases, the contractor shall furnish to the Det CC and the contracting officer the balance of funds available on the cost reimbursement CLIN from which the contractor will seek cost reimbursement for the item.
iii. General and Administrative (G&A) expenses (when applicable) will be allowed; fee/profit will not be allowed.
3. Consideration and Payment
a. Cost Reimbursables. For the basic year cost reimbursable (CR) CLINs, and option year CR CLINs, (if exercised) the Government will pay the Contractor such costs as are determined to be allowable, allocable, and reasonable in accordance with Part 31, Subpart 31.2, of the Federal Acquisition Regulation. For the purposes of this provision, allowable items of cost shall include costs for initial or replenishment spare parts, operational materials/supplies, material handling, off-site depot level maintenance, packaging, freight, contingencies, and G&A burden (when applicable), for those approved purchases authorized by the PWS. Fee/profit will not be allowed. All purchases will be reviewed and approved by the Det CC and 21 SW/PMD prior to submission for reimbursement, as specified above in paragraph 2.c.iii.
b. Cost Reimbursables – TDY Travel.
i. The Government will reimburse the contractor in accordance with FAR 31.205-46 for TDY/non-local travel as determined to be necessary by the contracting officer for the performance of the contract, as stated in the GEODSS PWS Section 1, Chapter 6, paragraph 6.10. Letters of Identification (contractor travel orders) to cover non-local travel shall be prepared by the contractor as required. Business travel shall be coordinated with and approved by the Det CC and Contracting Officer in advance. One copy of all Letters of Identification (LOIs) shall be provided to the Contracting Officer. To the extent available, the contractor shall use suitable Government quarters, messing and transportation facilities. General and Administrative
(G&A) expenses (when applicable) will be allowed; fee/profit will not be allowed.
ii. The Government will reimburse the contractor for actual transportation fare via the most direct routes between place of origin and destination. Cost for delays en route (excluding Government-caused delays) will not be reimbursed. Applicable burdens are allowable if travel is normally part of the specific allocation base. Fee/profit will not be allowed.
iii. The Government will not reimburse the contractor for local travel or travel of a non-TDY nature. Local travel is defined as travel within White Sands Missile Range for Det 1, the island of Diego Garcia for Det 2, and the island of Maui for Det 3.
4. Payments
a. All payments under this contract will be in U.S. dollars.
5. Contractor’s Contract Administration
a. The Contractor's contract administration functions will be performed at the following address:
Name and Title:
Responsible Office:
Address:
Telephone Number:
DUNS #: CAGE #:
TAX IDENTIFICATION NUMBER ____________
7. Criticality Designator Code (CDC)
a. IAW FAR Part 42.1105: Criticality Designator Code (CDC): C
CLAUSES INCORPORATED BY FULL TEXT
WAWF Submittal Information
Wide Area Work Flow Receipt and Acceptance (WAWF-RA) information can be found at the WAWF web page:
https://wawf.eb.mil/index.html. The web page provides information needed to register and utilize WAWF-RA.
The following information is provided to assist in completing WAWF invoice(s).
Invoice Type (choose only one):
Stand-Alone Invoice Construction Payment Invoice
(also mark if Fast Pay Applies – FAR 52.213-1)
Invoice + Receiving Report (Combo) Performance Based Payment
Invoice as 2-In-1 (Services Only) Progress Payment
Cost Voucher (FAR 52.216-7, 52.216-13, 52.216.14, 52.232-7) https://wawf.eb.mil/index.html
Contract Number:
Delivery Order:
Cage Code/Ext:
Pay DoDAAC:
IssueBy DoDAAC: FA2517
Admin DoDAAC:
Inspected By DoDAAC/Ext:
Ship-To Code/Ext:
Service Acceptor/Ext:
Ship-From Code: NOT NEEDED
LPO DoDAAC/Ext:
Additional E-Mail Notifications:
1.
2.
3.
Vendor - Payment information concerning your invoice may be accessed using the DFAS website at:
http://www.dod.mil/dfas/contractorpay.html
Your purchase order/contract number or invoice will be required to check status of your payment.
Section I - Contract Clauses
52.219-6 Notice Of Total Small Business Set-Aside NOV 2011
52.202-1 Definitions NOV 2013
52.203-5 Covenant Against Contingent Fees APR 1984
52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006
52.203-7 Anti-Kickback Procedures OCT 2010
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
JAN 1997
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-13 Contractor Code of Business Ethics and Conduct APR 2010
52.204-2 Security Requirements AUG 1996
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
AUG 2013
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
JUL 2013
52.211-5 Material Requirements AUG 2000
52.211-15 Defense Priority And Allocation Requirements APR 2008
52.215-2 Audit and Records--Negotiation OCT 2010
52.215-8 Order of Precedence--Uniform Contract Format OCT 1997
52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--
Modifications
AUG 2011
52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications OCT 2010
52.215-14 Integrity of Unit Prices OCT 2010
52.215-15 Pension Adjustments and Asset Reversions OCT 2010
52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits
(PRB) Other than Pensions
JUL 2005
52.215-21 Alt III Requirements for Cost or Pricing Data or Information Other
Than Cost or Pricing Data--Modifications (Oct 2010) -
Alternate III
OCT 1997
52.216-11 Cost Contract--No Fee APR 1984
52.219-4 Notice of Price Evaluation Preference for HUBZone Small
Business Concerns
JAN 2011
52.219-8 Utilization of Small Business Concerns JUL 2013
52.219-9 Small Business Subcontracting Plan JUL 2013
52.219-9 Alt II Small Business Subcontracting Plan (JULY 2013) Alternate II OCT 2001
52.219-16 Liquidated Damages-Subcontracting Plan JAN 1999
52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013
52.222-1 Notice To The Government Of Labor Disputes FEB 1997
52.222-3 Convict Labor JUN 2003
52.222-4 Contract Work Hours and Safety Standards Act - Overtime
Compensation
JUL 2005
52.222-19 Child Labor -- Cooperation with Authorities and Remedies JAN 2014
52.222-21 Prohibition Of Segregated Facilities FEB 1999
52.222-26 Equal Opportunity MAR 2007
52.222-29 Notification Of Visa Denial JUN 2003
52.222-35 Equal Opportunity for Veterans SEP 2010
52.222-36 Affirmative Action For Workers With Disabilities OCT 2010
52.222-37 Employment Reports on Veterans SEP 2010
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-41 Service Contract Act Of 1965 NOV 2007
52.222-43 Fair Labor Standards Act And Service Contract Act - Price
Adjustment (Multiple Year And Option)
SEP 2009
52.222-50 Combating Trafficking in Persons FEB 2009
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011
52.223-6 Drug-Free Workplace MAY 2001
52.223-10 Waste Reduction Program MAY 2011
52.223-12 Refrigeration Equipment and Air Conditioners MAY 1995
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.224-1 Privacy Act Notification APR 1984
52.224-2 Privacy Act APR 1984
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.227-1 Authorization and Consent DEC 2007
52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.228-3 Worker's Compensation Insurance (Defense Base Act) APR 1984
52.228-5 Insurance - Work On A Government Installation JAN 1997
52.229-3 Federal, State And Local Taxes FEB 2013
52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013
52.229-10 State of New Mexico Gross Receipts and Compensating Tax APR 2003
52.232-1 Payments APR 1984
52.232-8 Discounts For Prompt Payment FEB 2002
52.232-9 Limitation On Withholding Of Payments APR 1984
52.232-11 Extras APR 1984
52.232-17 Interest OCT 2010
52.232-18 Availability Of Funds APR 1984
52.232-20 Limitation Of Cost APR 1984
52.232-22 Limitation Of Funds APR 1984
52.232-23 Assignment Of Claims JAN 1986
52.232-25 Prompt Payment JUL 2013
52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.233-1 Disputes JUL 2002
52.233-1 Alt I Disputes (Jul 2002) - Alternate I DEC 1991
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.237-3 Continuity Of Services JAN 1991
52.242-1 Notice of Intent to Disallow Costs APR 1984
52.242-3 Penalties for Unallowable Costs MAY 2001
52.242-4 Certification of Final Indirect Costs JAN 1997
52.242-13 Bankruptcy JUL 1995
52.243-1 Alt II Changes--Fixed-Price (Aug 1987) - Alternate II APR 1984
52.243-2 Changes--Cost-Reimbursement AUG 1987
52.244-2 Subcontracts OCT 2010
52.245-1 Government Property APR 2012
52.245-1 Alt I Government Property (Apr 2012) Alternate I APR 2012
52.245-9 Use And Charges APR 2012
52.246-23 Limitation Of Liability FEB 1997
52.246-25 Limitation Of Liability--Services FEB 1997
52.249-2 Termination For Convenience Of The Government (Fixed-
Price)
APR 2012
52.249-6 Termination (Cost Reimbursement) MAY 2004
52.249-8 Default (Fixed-Price Supply & Service) APR 1984
52.249-14 Excusable Delays APR 1984
52.253-1 Computer Generated Forms JAN 1991
252.201-7000 Contracting Officer's Representative DEC 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.204-7000 Disclosure Of Information AUG 2013
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7004 Alt A System for Award Management Alternate A MAY 2013
252.204-7005 Oral Attestation of Security Responsibilities NOV 2001
252.204-7006 Billing Instructions OCT 2005
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Terrorist Country
DEC 2006
252.211-7007 Reporting of Government-Furnished Property AUG 2012
252.215-7000 Pricing Adjustments DEC 2012
252.215-7004 Requirement for Submission of Data Other Than Certified
Cost or Pricing Data--Modifications-Canadian Commercial
Corporation.
OCT 2013
252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997
252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010
252.223-7001 Hazard Warning Labels DEC 1991
252.223-7004 Drug Free Work Force SEP 1988
252.223-7006 Prohibition On Storage And…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .