Det 1-Equipment Repair PM Log.pdf
PDF 138 KB Posted
- Attached to
- REQUEST FOR PROPOSAL for GROUND-BASED ELECTRO-OPTICAL DEEP SPACE SURVEILLANCE (GEODSS) Federal contract opportunity
- Solicitation number
- FA2517-13-R-8001
View the file
Other files for this federal contract opportunity
Show all 50
REQUEST FOR PROPOSAL for GROUND-BASED ELECTRO-OPTICAL DEEP SPACE SURVEILLANCE (GEODSS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Equipment Repair/PM Log FAC Form 014 (10/2013) rev.3
Equipment Name Worked Performed Date Started Date Complete PM ID/W.O. # Initial PM Frequency
Building & Grounds completed. Tuesday, January 01, 2013 Tuesday, January 01, 2013 1-111 JB MONTHLY
Liebert Unit #6 COMPLETED PM Tuesday, January 01, 2013 Tuesday, January 01, 2013 1-102 JB MONTHLY
Liebert Unit #8 COMPLETED PM Tuesday, January 01, 2013 Tuesday, January 01, 2013 1-102 JB MONTHLY
Liebert Unit #7 COMPLETED PM Tuesday, January 01, 2013 Tuesday, January 01, 2013 1-102 JB MONTHLY
LIQUID CHILLER COMPLETED PM Tuesday, January 01, 2013 Tuesday, January 01, 2013 1-103 JB MONTHLY
GOODMAN HVAC this unit is bad. Will replace. (W.O. 005) Wednesday, January 02, 2013 Wednesday, January 02, 2013 1-118 JB MONTHLY
AHU 2 - 5 & 9 monthly PM's Wednesday, January 09, 2013 Wednesday, January 09, 2013 1-104 JB MONTHLY
EMERGENCY LIGHTS completed Wednesday, January 09, 2013 Wednesday, January 09, 2013 1-107 JB MONTHLY
INTRUSION DOOR LOCK
ASSEMBLY
completed Wednesday, January 09, 2013 Wednesday, January 09, 2013 1-107 JB MONTHLY
SANYO WALL MOUNTED
A/C'S (4 - 9)
Monthly PM's Wednesday, January 09, 2013 Wednesday, January 09, 2013 1-116 JB MONTHLY
GOODMAN HVAC created new operating program for new unit. Wednesday, January 09, 2013 Wednesday, January 09, 2013 W.O. 006 JB N/A
Elite Gate Assembly completed Thursday, January 10, 2013 Thursday, January 10, 2013 1-113 JB MONTHLY
PORTABLE FIRE
EXTINGQUISHERS
completed Thursday, January 10, 2013 Thursday, January 10, 2013 1-101 JB MONTHLY
Hot Water Heaters completed Thursday, January 10, 2013 Thursday, January 10, 2013 1-114 JB MONTHLY
UPS A/C UNIT (BARD) completed Sunday, January 13, 2013 Sunday, January 13, 2013 1-117 JB MONTHLY
CLASSIFIED WASTE
SHREDDER
completed Sunday, January 13, 2013 Sunday, January 13, 2013 1-108 JB MONTHLY
200KW EMERGENCY
GENERATOR
completed Sunday, January 13, 2013 Sunday, January 13, 2013 1-059 JB SEMI-
MONTHLY
CAS T.O. 1-036, .1-.3 (Str #1) completed Monday, January 14, 2013 Monday, January 14, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #2) completed Monday, January 14, 2013 Monday, January 14, 2013 1-112 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #1) completed Monday, January 14, 2013 Monday, January 14, 2013 1-105 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #2) replaced tip seals & belts on # 2 CAS Monday, January 14, 2013 Monday, January 14, 2013 1-105 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #3) replaced tip seals & belts on #1 CAS Monday, January 14, 2013 Monday, January 14, 2013 1-105 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #3) completed Monday, January 14, 2013 Monday, January 14, 2013 1-112 JB MONTHLY
200KW EMERGENCY
GENERATOR
completed Monday, January 28, 2013 Monday, January 28, 2013 1-110 JB MONTHLY
Onan ATS completed Monday, January 28, 2013 Monday, January 28, 2013 1-109 JB MONTHLY
200KW EMERGENCY
GENERATOR
installed relay board & annunciator in SOC. All tests good.
Tuesday, January 29, 2013 Thursday, May 23, 2013 W.O. 010 JB N/A
Elite Gate Assembly Completed monthly PM. Tuesday, February 05, 2013 Tuesday, February 05, 2013 1-113 JD MONTHLY
SANYO WALL MOUNTED
A/C'S (4 - 9)
Completed monthly PM. Tuesday, February 05, 2013 Tuesday, February 05, 2013 1-116 JD MONTHLY
Elite Gate Assembly replaced main drive belt Tuesday, February 05, 2013 Tuesday, February 05, 2013 W.O. 012 JD N/A
CLASSIFIED WASTE
SHREDDER
Completed monthly PM. Replaced drive belt. Tuesday, February 05, 2013 Tuesday, February 05, 2013 1-108 JD MONTHLY
LIQUID CHILLER all checks good Wednesday, February 06, 2013 Wednesday, February 06, 2013 1-103 JB MONTHLY
PORTABLE FIRE
EXTINGQUISHERS
Completed monthly PM. Wednesday, February 06, 2013 Wednesday, February 06, 2013 1-101 JD MONTHLY
EMERGENCY LIGHTS Completed monthly PM. Wednesday, February 06, 2013 Wednesday, February 06, 2013 1-107 JD MONTHLY
UPS A/C UNIT (BARD) Completed monthly PM. Thursday, February 07, 2013 Thursday, February 07, 2013 1-117 JD MONTHLY
U.P.S UNIT Cleaned unit. Thursday, February 07, 2013 Thursday, February 07, 2013 1-115 JD MONTHLY
AHU 2 - 5 & 9 Completed monthly PM. Thursday, February 07, 2013 Thursday, February 07, 2013 1-104 JD MONTHLY
GOODMAN HVAC Unit is non-operational and scheduled to be replaced.
Thursday, February 07, 2013 Thursday, February 07, 2013 1-118 JD MONTHLY
Hot Water Heaters Completed monthly PM. Friday, February 08, 2013 Friday, February 08, 2013 1-114 JD MONTHLY
INTRUSION DOOR LOCK
ASSEMBLY
Completed monthly PM. Friday, February 08, 2013 Friday, February 08, 2013 1-106 JD MONTHLY
Building & Grounds Completed monthly PM. Friday, February 08, 2013 Friday, February 08, 2013 1-111 JD MONTHLY
CAS Tower 1 Control Panel Replaced comm module. Saturday, February 09, 2013 Saturday, February 09, 2013 WO# 015 JD N/A
CAS T.O. 1-036, .1-.3 (Str #3) completed Sunday, February 10, 2013 Sunday, February 10, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #1) completed Sunday, February 10, 2013 Sunday, February 10, 2013 1-112 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #1) completed Sunday, February 10, 2013 Sunday, February 10, 2013 1-105 JB MONTHLY
Liebert Unit #8 monthly PM (can get 1 more month out of filters) Sunday, February 10, 2013 Sunday, February 10, 2013 1-102 JB MONTHLY
Liebert Unit #6 monthly PM (can get 1 more month out of filters) Sunday, February 10, 2013 Sunday, February 10, 2013 1-102 JB MONTHLY
Liebert Unit #7 monthly PM (can get 1 more month out of filters) Sunday, February 10, 2013 Sunday, February 10, 2013 1-102 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #2) completed Sunday, February 10, 2013 Sunday, February 10, 2013 1-112 JB MONTHLY
200KW EMERGENCY
GENERATOR
completed Sunday, February 24, 2013 Sunday, February 24, 2013 1-110 JB MONTHLY
CHILLED WATER
CIRCULATING SYSTEM
all pumps in good condition Monday, March 04, 2013 Monday, March 04, 2013 1-155 JB QUARTERLY
SANYO WALL MOUNTED
A/C'S (4 - 9) completed Monday, March 04, 2013 Monday, March 04, 2013 1-116 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #1) replaced tip seals & belts on CAS #3 Tuesday, March 05, 2013 Tuesday, March 05, 2013 1-105 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #2) replaced tip seals & belts on # 2 CAS Wednesday, March 06, 2013 Wednesday, March 06, 2013 1-105 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #3) replaced tip seals & belts on #1 CAS Thursday, March 07, 2013 Thursday, March 07, 2013 1-105 JB MONTHLY
AHU 2 - 5 & 9 Completed monthly PM. Friday, March 08, 2013 Friday, March 08, 2013 1-104 JD MONTHLY
INTRUSION DOOR LOCK
ASSEMBLY
Completed monthly PM Friday, March 08, 2013 Friday, March 08, 2013 1-106 JD MONTHLY
CLASSIFIED WASTE
SHREDDER
Completed Quarterly PM Friday, March 08, 2013 Friday, March 08, 2013 1-159 JD QUARTERLY
GOODMAN HVAC Unit is out of service. Replacement is on order. Friday, March 08, 2013 Friday, March 08, 2013 1-118 JD MONTHLY
AHU 2 - 5 & 9 Completed quarterly PM. Friday, March 08, 2013 Friday, March 08, 2013 1-156 JD QUARTERLY
CLASSIFIED WASTE
SHREDDER
Completed monthly PM. Friday, March 08, 2013 Friday, March 08, 2013 1-108 JD MONTHLY
EMERGENCY LIGHTS Completed monthly PM. Saturday, March 09, 2013 Saturday, March 09, 2013 1-107 JD MONTHLY
Hot Water Heaters Completed monthly PM. Saturday, March 09, 2013 Saturday, March 09, 2013 1-114 JD MONTHLY
U.P.S UNIT Completed monthly PM. Saturday, March 09, 2013 Saturday, March 09, 2013 1-115 JD MONTHLY
PORTABLE FIRE
EXTINGQUISHERS
Completed monthly PM. Saturday, March 09, 2013 Saturday, March 09, 2013 1-101 JD MONTHLY
Building & Grounds Completed monthly PM. Saturday, March 09, 2013 Saturday, March 09, 2013 1-111 JD MONTHLY
CAS T.O. 1-036, .1-.3 (Str #1) completed monthly PM Monday, March 11, 2013 Monday, March 11, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #2) completed Monday, March 11, 2013 Monday, March 11, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #3) completed Monday, March 11, 2013 Monday, March 11, 2013 1-112 JB MONTHLY
Building & Grounds Monthly PM. Friday, March 15, 2013 Friday, March 15, 2013 1-111 JD MONTHLY
Elite Gate Assembly Monthly PM. Friday, March 15, 2013 Friday, March 15, 2013 1-113 JD MONTHLY
CAS T.O. 2-013.1 (Str #1) complete Sunday, March 17, 2013 Sunday, March 17, 2013 1-157 JB QUARTERLY
CAS T.O. 1-049.1 (Str #1) complete Sunday, March 17, 2013 Sunday, March 17, 2013 1-158 JB QUARTERLY
200KW EMERGENCY
GENERATOR
Completed monthly PM and load test. Wednesday, March 27, 2013 Wednesday, March 27, 2013 1-110 JD MONTHLY
Onan ATS Completed monthly PM. Wednesday, March 27, 2013 Wednesday, March 27, 2013 1-109 JD MONTHLY
200KW EMERGENCY
GENERATOR
Completed quarterly PM. Sunday, March 31, 2013 Sunday, March 31, 2013 1-154 JD/JB QUARTERLY
200KW EMERGENCY
GENERATOR (2 yr./ 2000 hrs.)
changed coolant, cleaned radiator & aftercooler Sunday, March 31, 2013 Sunday, March 31, 2013 1-305 JB/JD 2 YR.
GOODMAN HVAC finished building return & supply ducts. Sunday, April 07, 2013 Sunday, April 21, 2013 W.O. 029 JB N/A
Liebert Unit #6 changed filters on #6 Monday, April 08, 2013 Monday, April 08, 2013 1-102 JB MONTHLY
PORTABLE FIRE
EXTINGQUISHERS
Completed monthly PM. Tuesday, April 09, 2013 Tuesday, April 09, 2013 1-101 JD MONTHLY
200KW EMERGENCY
GENERATOR
completed during outage run Tuesday, April 09, 2013 Tuesday, April 09, 2013 1-110 JB MONTHLY
EMERGENCY LIGHTS Completed monthly PM. Tuesday, April 09, 2013 Tuesday, April 09, 2013 1-107 JD MONTHLY
Elite Gate Assembly Completed monthly PM. Wednesday, April 10, 2013 Wednesday, April 10, 2013 1-113 JD MONTHLY
Hot Water Heaters Completed monthly PM. Wednesday, April 10, 2013 Wednesday, April 10, 2013 1-114 JD MONTHLY
AHU 2 - 5 & 9 Completed monthly PM's. Friday, April 12, 2013 Friday, April 12, 2013 1-104 JD MONTHLY
SANYO WALL MOUNTED
A/C'S (4 - 9)
Completed monthly PM's. Friday, April 12, 2013 Friday, April 12, 2013 1-116 JD MONTHLY
UPS A/C UNIT (BARD) Completed monthly PM. Friday, April 12, 2013 Friday, April 12, 2013 1-117 JD MONTHLY
AHU 2 - 5 & 9 Completed quarterly PM's. Friday, April 12, 2013 Friday, April 12, 2013 1-156 JD QUARTERLY
GOODMAN HVAC Completed monthly PM. Friday, April 12, 2013 Friday, April 12, 2013 1-118 JD MONTHLY
U.P.S UNIT Completed monthly PM. Friday, April 12, 2013 Friday, April 12, 2013 1-115 JD MONTHLY
INTRUSION DOOR LOCK
ASSEMBLY
None Saturday, April 13, 2013 Saturday, April 13, 2013 1-106 JD MONTHLY
LIQUID CHILLER completed monthly PM Sunday, April 14, 2013 Sunday, April 14, 2013 1-103 JB MONTHLY
Liebert Unit #8 #7 complete. No filter change Sunday, April 14, 2013 Sunday, April 14, 2013 1-102 JB MONTHLY
Liebert Unit #7 #7 complete. No filter change Sunday, April 14, 2013 Sunday, April 14, 2013 1-102 JB MONTHLY
CLASSIFIED WASTE
SHREDDER
Completed monthly PM. Friday, April 19, 2013 Friday, April 19, 2013 1-108 JD MONTHLY
CAS T.O. 1-036, .1-.3 (Str #2) completed Monday, April 22, 2013 Monday, April 22, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #1) completed monthly PM Monday, April 22, 2013 Monday, April 22, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #3) completed Monday, April 22, 2013 Monday, April 22, 2013 1-112 JB MONTHLY
GOODMAN HVAC wired up unit and test ran Tuesday, April 23, 2013 Wednesday, April 24, 2013 W.O. 033 JB N/A
INTRUSION DOOR LOCK
ASSEMBLY
completed Thursday, May 02, 2013 Thursday, May 02, 2013 1-106 JB MONTHLY
EMERGENCY LIGHTS Completed monthly PM. Sunday, May 05, 2013 Sunday, May 05, 2013 1-107 JD MONTHLY
Hot Water Heaters Completed monthly PM. Sunday, May 05, 2013 Sunday, May 05, 2013 1-114 JD MONTHLY
PORTABLE FIRE
EXTINGQUISHERS
Completed monthly PM. Replaced all inspection tags.
Sunday, May 05, 2013 Sunday, May 05, 2013 1-101 JD MONTHLY
LIQUID CHILLER monthly PM complete Monday, May 06, 2013 Monday, May 06, 2013 1-103 JB MONTHLY
Liebert Unit #8 completed. Monday, May 06, 2013 Monday, May 13, 2013 1-102 JB MONTHLY
Liebert Unit #6 monthly PM (#6) complete Monday, May 06, 2013 Monday, May 06, 2013 1-102 JB MONTHLY
Liebert Unit #7 monthly PM (#7) complete Monday, May 06, 2013 Monday, May 06, 2013 1-102 JB MONTHLY
AHU 2 - 5 & 9 completed, changed all filters. Monday, May 13, 2013 Tuesday, May 14, 2013 1-104 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #1) completed Wednesday, May 15, 2013 Wednesday, May 15, 2013 1-105 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #1) completed monthly PM Wednesday, May 22, 2013 Wednesday, May 22, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #3) completed Wednesday, May 22, 2013 Wednesday, May 22, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #2) completed Wednesday, May 22, 2013 Wednesday, May 22, 2013 1-112 JB MONTHLY
Elite Gate Assembly working good. Lubed chain Tuesday, June 04, 2013 Tuesday, June 04, 2013 1-113 JB MONTHLY
GOODMAN HVAC unit working good. Tuesday, June 04, 2013 Tuesday, June 04, 2013 1-118 JB MONTHLY
UPS A/C UNIT (BARD) condenser fan motor hard starting. Tuesday, June 04, 2013 Tuesday, June 04, 2013 1-117 JB MONTHLY
CHILLED WATER
CIRCULATING SYSTEM
monthly PM complete Wednesday, June 05, 2013 Wednesday, June 05, 2013 1-155 JB QUARTERLY
LIEBERT Unit #8 semi-annual PM complete Wednesday, June 05, 2013 Wednesday, June 05, 2013 1-205 JB SEMI ANNUAL
LIEBERT Unit #6 semi-annual PM complete Wednesday, June 05, 2013 Wednesday, June 05, 2013 1-205 JB SEMI ANNUAL
Liebert Unit #7 monthly PM complete Wednesday, June 05, 2013 Wednesday, June 05, 2013 1-102 JB MONTHLY
LIQUID CHILLER monthly PM complete Wednesday, June 05, 2013 Wednesday, June 05, 2013 1-103 JB MONTHLY
Liebert Unit #6 monthly PM complete Wednesday, June 05, 2013 Wednesday, June 05, 2013 1-102 JB MONTHLY
LIQUID CHILLER semi-annual PM complete Wednesday, June 05, 2013 Wednesday, June 05, 2013 1-208 JB SEMI ANNUAL
Liebert Unit #8 monthly PM complete Wednesday, June 05, 2013 Wednesday, June 05, 2013 1-102 JB MONTHLY
LIEBERT Unit #7 semi-annual PM complete Wednesday, June 05, 2013 Wednesday, June 05, 2013 1-205 JB SEMI ANNUAL
LIQUID CHILLER rebuilt #4 compressor contactor Friday, June 07, 2013 Friday, June 07, 2013 W.O. 050 JB Work Order
LIQUID CHILLER rebuilt #3 compressor contactor Friday, June 07, 2013 Friday, June 07, 2013 W.O. 049 JB Work Order
CAS T.O. 2-012, .1 - .2 (Str #3) completed Monday, June 10, 2013 Monday, June 10, 2013 1-105 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #2) Completed Monday, June 10, 2013 Monday, June 10, 2013 1-105 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #1) completed monthly PM Monday, June 10, 2013 Monday, June 10, 2013 1-105 JB MONTHLY
CAS T.O. 2-015, .1-.2 (Str #1) completed Thursday, June 13, 2013 Thursday, June 13, 2013 1-202 JB SEMI ANNUAL
CAS T.O. 1-036, .1-.3 (Str #2) completed Thursday, June 13, 2013 Thursday, June 13, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #3) completed Thursday, June 13, 2013 Thursday, June 13, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #1) completed monthly PM Thursday, June 13, 2013 Thursday, June 13, 2013 1-112 JB MONTHLY
CAS T.O. 2-013.1 (Str #3) completed Qtly. Tuesday, June 18, 2013 Tuesday, June 18, 2013 1-157 JB QUARTERLY
CAS T.O. 2-013.1 (Str #1) completed Qtly. Tuesday, June 18, 2013 Tuesday, June 18, 2013 1-157 JB QUARTERLY
CAS T.O. 2-013.1 (Str #2) completed qtly. Tuesday, June 18, 2013 Tuesday, June 18, 2013 1-157 JB QUARTERLY
CAS T.O. 1-049.1 (Str #3) completed Friday, June 21, 2013 Friday, June 21, 2013 1-158 JB QUARTERLY
CAS T.O. 1-049.1 (Str #2) completed Friday, June 21, 2013 Friday, June 21, 2013 1-158 JB QUARTERLY
CAS T.O. 1-049.1 (Str #1) completed Friday, June 21, 2013 Friday, June 21, 2013 1-158 JB QUARTERLY
CAS T.O. 2-016 (Str #2) completed Monday, June 24, 2013 Monday, June 24, 2013 1-203 JB SEMI ANNUAL
CAS T.O. 2-016 (Str #1) completed Monday, June 24, 2013 Monday, June 24, 2013 1-203 JB SEMI ANNUAL
CAS T.O. 2-016 (Str #3) completed Monday, June 24, 2013 Monday, June 24, 2013 1-203 JB SEMI ANNUAL
CAS T.O. 2-015, .1-.2 (Str #1) completed Friday, June 28, 2013 Friday, June 28, 2013 1-202 JB SEMI ANNUAL
CAS T.O. 2-015, .1-.2 (Str #3) completed Friday, June 28, 2013 Friday, June 28, 2013 1-202 JB SEMI ANNUAL
CAS T.O. 2-015, .1-.2 (Str #2) completed Friday, June 28, 2013 Friday, June 28, 2013 1-202 JB SEMI ANNUAL
Liebert Unit #6 completed Wednesday, July 03, 2013 Wednesday, July 03, 2013 1-102 JB MONTHLY
Liebert Unit #7 completed Wednesday, July 03, 2013 Wednesday, July 03, 2013 1-102 JB MONTHLY
Liebert Unit #8 completed (waiting on new contactor, unit is still locked out) Wednesday, July 03, 2013 Wednesday, July 03, 2013 1-102 JB MONTHLY
CAS T.O. 1-017 STARTED. Friday, July 05, 2013 Wednesday, July 31, 2013 1-052 JB WEEKLY
Onan ATS STARTED. Friday, July 05, 2013 Wednesday, July 31, 2013 1-057 JB WEEKLY
CAS T.O. 1-018 STARTED. Friday, July 05, 2013 Wednesday, July 31, 2013 1-055 JB WEEKLY
Van Air Dryer STARTED. Friday, July 05, 2013 Wednesday, July 31, 2013 1-053 JB WEEKLY
UPS A/C UNIT (BARD) completed monthly PM Monday, July 08, 2013 Monday, July 08, 2013 1-117 JB MONTHLY
Elite Gate Assembly completed monthly PM Monday, July 08, 2013 Monday, July 08, 2013 1-113 JB MONTHLY
LIQUID CHILLER replaced #3 compressor, system working good.
(waiting on rest of freon) Tuesday, July 09, 2013 Wednesday, July 10, 2013 W.O. 051 JB Work Order
GOODMAN HVAC monthly PM completed Wednesday, July 10, 2013 Wednesday, July 10, 2013 1-118 JB MONTHLY
LIQUID CHILLER monthly PM completed, all units running Wednesday, July 10, 2013 Wednesday, July 10, 2013 1-103 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #1) completed monthly PM Tuesday, July 16, 2013 Tuesday, July 16, 2013 1-105 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #3) completed monthly PM Tuesday, July 16, 2013 Tuesday, July 16, 2013 1-105 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #2) completed monthly PM Tuesday, July 16, 2013 Tuesday, July 16, 2013 1-105 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #1) completed monthly PM Monday, July 22, 2013 Monday, July 22, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #2) completed monthly PM Monday, July 22, 2013 Monday, July 22, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #3) completed monthly PM Monday, July 22, 2013 Monday, July 22, 2013 1-112 JB MONTHLY
LIQUID CHILLER replaced stage 2 cond fan contactor Wednesday, July 31, 2013 Wednesday, July 31, 2013 W.O. 058 JB N/A
SANYO WALL MOUNTED
A/C'S (4 - 9) replaced bad pwr supply on outdoor unit & reset address on indoor unit on unit #5.
Thursday, August 01, 2013 Friday, August 02, 2013 W.O. 060 JB N/A
UPS A/C UNIT (BARD) completed monthly PM Wednesday, August 07, 2013 Wednesday, August 07, 2013 1-117 JB MONTHLY
LIQUID CHILLER completed monthly PM Wednesday, August 07, 2013 Wednesday, August 07, 2013 1-103 JB MONTHLY
GOODMAN HVAC completed monthly PM Wednesday, August 07, 2013 Wednesday, August 07, 2013 1-118 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #3) completed monthly PM Monday, August 12, 2013 Monday, August 12, 2013 1-105 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #1) completed monthly PM Monday, August 12, 2013 Monday, August 12, 2013 1-105 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #2) completed monthly PM Friday, August 16, 2013 Friday, August 16, 2013 1-105 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #2) completed monthly PM Monday, August 19, 2013 Monday, August 19, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #3) completed monthly PM Monday, August 19, 2013 Monday, August 19, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #3) completed monthly PM Monday, August 26, 2013 Monday, August 26, 2013 1-112 JB MONTHLY
Liebert Unit #8 completed (waiting on breaker) Tuesday, August 27, 2013 Tuesday, August 27, 2013 1-102 JB MONTHLY
Liebert Unit #6 completed monthly PM Tuesday, August 27, 2013 Tuesday, August 27, 2013 1-102 JB MONTHLY
Liebert Unit #7 completed monthly PM Tuesday, August 27, 2013 Tuesday, August 27, 2013 1-102 JB MONTHLY
LIQUID CHILLER completed Tuesday, September 03, 2013 Tuesday, September 03, 2013 1-103 JB MONTHLY
Liebert Unit #6 completed Tuesday, September 03, 2013 Tuesday, September 03, 2013 1-102 JB MONTHLY
Liebert Unit #7 completed Tuesday, September 03, 2013 Tuesday, September 03, 2013 1-102 JB MONTHLY
Liebert Unit #8 completed Tuesday, September 03, 2013 Tuesday, September 03, 2013 1-102 JB MONTHLY
GOODMAN HVAC completed Sunday, September 08, 2013 Sunday, September 08, 2013 1-118 JB MONTHLY
UPS A/C UNIT (BARD) completed Sunday, September 08, 2013 Sunday, September 08, 2013 1-117 JB MONTHLY
CAS T.O. 2-030, .3 - .4 (Str #2) completed Monday, September 09, 2013 Monday, September 09, 2013 1-303 JB 2 YR.
CAS T.O. 2-030, .3 - .4 (Str #1) completed Monday, September 09, 2013 Monday, September 09, 2013 1-303 JB 2 YR.
CAS T.O. 2-030, .3 - .4 (Str #3) completed Monday, September 09, 2013 Monday, September 09, 2013 1-303 JB N/A
CAS T.O. 1-036, .1-.3 (Str #1) completed Sunday, September 15, 2013 Sunday, September 15, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #3) completed Sunday, September 15, 2013 Sunday, September 15, 2013 1-112 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #2) completed Sunday, September 15, 2013 Sunday, September 15, 2013 1-112 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #3) completed Sunday, September 15, 2013 Sunday, September 15, 2013 1-105 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #1) completed Sunday, September 15, 2013 Sunday, September 15, 2013 1-105 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #2) completed Sunday, September 15, 2013 Sunday, September 15, 2013 1-105 JB MONTHLY
CAS T.O. 2-013.1 (Str #3) completed Tuesday, September 17, 2013 Tuesday, September 17, 2013 1-157 JB QUARTERLY
CAS T.O. 2-013.1 (Str #2) completed Tuesday, September 17, 2013 Tuesday, September 17, 2013 1-157 JB QUARTERLY
CAS T.O. 2-013.1 (Str #1) completed Tuesday, September 17, 2013 Tuesday, September 17, 2013 1-157 JB QUARTERLY
CHILLED WATER
CIRCULATING SYSTEM
completed Monday, September 23, 2013 Monday, September 23, 2013 1-155 JB QUARTERLY
CAS T.O. 1-049.1 (Str #3) completed Wednesday, September 25, Wednesday, September 25, 1-158 JB QUARTERLY
CAS T.O. 1-049.1 (Str #2) completed Wednesday, September 25, Wednesday, September 25, 1-158 JB QUARTERLY
CAS T.O. 1-049.1 (Str #1) completed Wednesday, September 25, Wednesday, September 25, 1-158 JB QUARTERLY
Liebert Unit #6 completed Wednesday, October 02, 2013 Wednesday, October 02, 2013 1-102 JB MONTHLY
LIEBERT UNIT #7 completed Wednesday, October 02, 2013 Wednesday, October 02, 2013 1-252 JB ANNUAL
LIEBERT UNIT #8 completed Wednesday, October 02, 2013 Wednesday, October 02, 2013 1-252 JB ANNUAL
LIQUID CHILLER completed Wednesday, October 02, 2013 Wednesday, October 02, 2013 1-251 JB ANNUAL
Liebert Unit #7 completed Wednesday, October 02, 2013 Wednesday, October 02, 2013 1-102 JB MONTHLY
LIEBERT UNIT #6 completed Wednesday, October 02, 2013 Wednesday, October 02, 2013 1-252 JB ANNUAL
Liebert Unit #8 completed Wednesday, October 02, 2013 Wednesday, October 02, 2013 1-102 JB MONTHLY
LIQUID CHILLER completed Wednesday, October 02, 2013 Wednesday, October 02, 2013 1-103 JB MONTHLY
UPS A/C UNIT (BARD) completed (waiting on new cond fan mtr) Thursday, October 03, 2013 Thursday, October 03, 2013 1-117 JB MONTHLY
GOODMAN HVAC completed Thursday, October 03, 2013 Thursday, October 03, 2013 1-118 JB MONTHLY
CHILLED WATER PIPING
SYSTEM
completed Friday, October 04, 2013 Friday, October 04, 2013 1-255 JB ANNUAL
DUCT HEATER (AHU # 2
ONLY)
completed. Friday, October 04, 2013 Friday, October 04, 2013 1-253 JB ANNUAL
200KW EMERGENCY
GENERATOR (Annual/ 1000 changed oil & all filters Friday, October 25, 2013 Friday, October 25, 2013 1-267 JB ANNUAL
CAS T.O. 2-012, .1 - .2 (Str #3) completed monthly PM Friday, October 25, 2013 Friday, October 25, 2013 1-105 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #1) completed monthly PM Friday, October 25, 2013 Friday, October 25, 2013 1-112 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #2) completed monthly PM Friday, October 25, 2013 Friday, October 25, 2013 1-105 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #1) completed monthly PM Friday, October 25, 2013 Friday, October 25, 2013 1-105 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #3) completed monthly PM Friday, October 25, 2013 Friday, October 25, 2013 1-112 MONTHLY
CAS T.O. 1-036, .1-.3 (Str #2) completed monthly PM Friday, October 25, 2013 Friday, October 25, 2013 1-112 JB MONTHLY
GOODMAN HVAC completed monthly PM Tuesday, November 05, 2013 Tuesday, November 05, 2013 1-118 JB MONTHLY
LIQUID CHILLER completed monthly PM Tuesday, November 05, 2013 Tuesday, November 05, 2013 1-103 JB MONTHLY
UPS A/C UNIT (BARD) completed monthly PM Tuesday, November 05, 2013 Tuesday, November 05, 2013 1-117 JB MONTHLY
Liebert Units #6 & #8 installed new 80a breakers in both units and test ran.
Wednesday, November 06, Wednesday, November 06, W.O. 043 JB N/A
Liebert Unit #6 completed monthly PM Wednesday, November 06, Wednesday, November 06, 1-102 JB MONTHLY
Liebert Unit #7 completed monthly PM Wednesday, November 06, Wednesday, November 06, 1-102 JB MONTHLY
Liebert Unit #8 completed monthly PM Wednesday, November 06, Wednesday, November 06, 1-102 JB MONTHLY
LIQUID CHILLER rebuilt comp contactors #1 & #2 Thursday, November 07, 2013 Thursday, November 07, 2013 W.O.'s 047 &
JB N/A
LIQUID CHILLER removed bad breakers for comp units 1 & 2 Thursday, November 07, 2013 Thursday, November 07, 2013 W.O. 073 JB N/A
CAS T.O. 1-036, .1-.3 (Str #3) completed monthly PM Tuesday, November 12, 2013 Tuesday, November 12, 2013 1-112 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #1) completed monthly PM (tip seals due) Tuesday, November 12, 2013 Tuesday, November 12, 2013 1-105 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #2) completed monthly PM Tuesday, November 12, 2013 Tuesday, November 12, 2013 1-105 JB MONTHLY
CAS T.O. 2-012, .1 - .2 (Str #3) completed monthly PM Tuesday, November 12, 2013 Tuesday, November 12, 2013 1-105 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #2) completed monthly PM Tuesday, November 12, 2013 Tuesday, November 12, 2013 1-112 JB MONTHLY
Refrigerator completed monthly PM, (changed filter) Tuesday, November 12, 2013 Tuesday, November 12, 2013 1-269 JB ANNUAL
UNITARY HEATERS 1 - 7 completed annual PM (except for #4, waiting on new contactor) Tuesday, November 12, 2013 Tuesday, November 12, 2013 1-264 JB ANNUAL
CAS T.O. 1-036, .1-.3 (Str #1) completed monthly PM (tip seals due) Tuesday, November 12, 2013 Tuesday, November 12, 2013 1-112 JB MONTHLY
Elite Gate Assembly found bad exit loop detector. Have system temp working until part gets here.
Friday, November 22, 2013 Tuesday, November 26, 2013 W.O. 076 JB N/A
CAS T.O. 1-049.1 (Str #1) completed Qtrly PM Friday, December 06, 2013 Friday, December 06, 2013 1-158 JB QUARTERLY
GOODMAN HVAC completed monthly PM Friday, December 06, 2013 Friday, December 06, 2013 1-118 JB MONTHLY
CAS T.O. 2-013.1 (Str #1) completed Qtrly PM Friday, December 06, 2013 Friday, December 06, 2013 1-157 JB QUARTERLY
CAS T.O. 2-015, .1-.2 (Str #1) completed Semi Annual PM Friday, December 06, 2013 Friday, December 06, 2013 1-202 JB SEMI ANNUAL
CAS T.O. 2-016 (Str #1) completed Semi Annual PM Friday, December 06, 2013 Friday, December 06, 2013 1-203 JB SEMI ANNUAL
CAS T.O. 2-012, .1 - .2 (Str #1) completed Monthly PM Friday, December 06, 2013 Friday, December 06, 2013 1-105 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #1) completed Monthly PM Friday, December 06, 2013 Friday, December 06, 2013 1-112 JB MONTHLY
LIQUID CHILLER completed semi-annual PM Friday, December 06, 2013 Friday, December 06, 2013 1-208 JB SEMI ANNUAL
UPS A/C UNIT (BARD) completed monthly PM Friday, December 06, 2013 Friday, December 06, 2013 1-117 JB MONTHLY
LIQUID CHILLER completed monthly PM Friday, December 06, 2013 Friday, December 06, 2013 1-103 JB MONTHLY
CAS T.O. 2-016 (Str #2) completed Semi-Annual PM Monday, December 09, 2013 Monday, December 09, 2013 1-203 JB SEMI ANNUAL
CAS T.O. 2-012, .1 - .2 (Str #2) completed Monthly PM Monday, December 09, 2013 Monday, December 09, 2013 1-105 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #2) completed Monthly PM Monday, December 09, 2013 Monday, December 09, 2013 1-112 JB MONTHLY
CAS T.O. 2-013.1 (Str #2) completed Qtrly PM Monday, December 09, 2013 Monday, December 09, 2013 1-157 JB QUARTERLY
CAS T.O. 1-049.1 (Str #2) completed Qtrly PM Monday, December 09, 2013 Monday, December 09, 2013 1-158 JB QUARTERLY
CAS T.O. 2-015, .1-.2 (Str #2) completed Semi-Annual PM Monday, December 09, 2013 Monday, December 09, 2013 1-202 JB SEMI ANNUAL
CHILLED WATER
CIRCULATING SYSTEM
completed Qtrly PM Tuesday, December 10, 2013 Tuesday, December 10, 2013 1-155 JB QUARTERLY
GOODMAN HVAC installed new heating coils in unit & tested Friday, December 13, 2013 Friday, December 13, 2013 W.O. 073 JB N/A
CAS T.O. 2-012, .1 - .2 (Str #3) completed monthly PM Tuesday, December 17, 2013 Tuesday, December 17, 2013 1-105 JB MONTHLY
CAS T.O. 1-036, .1-.3 (Str #3) completed monthly PM Tuesday, December 17, 2013 Tuesday, December 17, 2013 1-112 JB MONTHLY
CAS T.O. 2-013.1 (Str #3) completed QTRLY PM Tuesday, December 17, 2013 Tuesday, December 17, 2013 1-157 JB QUARTERLY
CAS T.O. 1-049.1 (Str #3) completed QTRLY PM Tuesday, December 17, 2013 Tuesday, December 17, 2013 1-158 JB QUARTERLY
CAS T.O. 2-015, .1-.2 (Str #3) completed Semi Annual PM Tuesday, December 17, 2013 Tuesday, December 17, 2013 1-202 JB SEMI ANNUAL
CAS T.O. 2-016 (Str #3) completed Semi Annual PM Tuesday, December 17, 2013 Tuesday, December 17, 2013 1-203 JB SEMI ANNUAL
Liebert Unit #6 completed Monthly PM Thursday, December 19, 2013 Thursday, December 19, 2013 1-102 JB MONTHLY
Liebert Unit #7 completed Monthly PM Thursday, December 19, 2013 Thursday, December 19, 2013 1-102 JB MONTHLY
Liebert Unit #8 completed Monthly PM Thursday, December 19, 2013 Thursday, December 19, 2013 1-102 JB MONTHLY
LIEBERT Unit #8 completed Semi-Annual PM Thursday, December 19, 2013 Thursday, December 19, 2013 1-205 JB SEMI ANNUAL
LIEBERT Unit #7 completed Semi-Annual PM Thursday, December 19, 2013 Thursday, December 19, 2013 1-205 JB SEMI ANNUAL
LIEBERT Unit #6 completed Semi-Annual PM Thursday, December 19, 2013 Thursday, December 19, 2013 1-205 JB SEMI ANNUAL