7._Attch_7 _L-2_PP_Questionnaire_GEODSS.doc

DOC document 78 KB Posted

Attached to
REQUEST FOR PROPOSAL for GROUND-BASED ELECTRO-OPTICAL DEEP SPACE SURVEILLANCE (GEODSS)
Solicitation number
FA2517-13-R-8001
Issued by

About this file

Attch 7 L-2 PP Questionnaire

View the file

Other files

File Type Posted
GEODSS_RFP_Questions_3.pdf PDF
WD_CBA-2009-2470 _Rev_4_(Socorro).pdf PDF
FA2517-13-R-8001-0002_Conformed.pdf PDF
FA2517-13-R-8001-0002.pdf PDF
4._Attch_4 _REVISED_Socorro_CBA.pdf PDF
GEODSS_RFP_Questions_Round_2.pdf PDF
FA2517-13-R-8001-0001.pdf PDF
FA2517-13-R-8001-0001_Conformed.pdf PDF
OCI_Answer.pdf PDF
CBA_WD_2009-2470_Rev_3 _Socorro_NM.pdf PDF
WD_CBA-2009-2741 _Rev_4_(Maui).pdf PDF
GEODSS_RFP_Questions_1.pdf PDF
GEODSS_Site_Visit_Questions.pdf PDF
Site_Visit_Minutes.pdf PDF
Site_Visit_Attendees.pdf PDF
9._Attch_9 _L-4_PP_Client_Authorization_Letter_(Commercial)_GEODSS.doc DOC document
0._Request_for_Proposal_FA2517-13-R-8001.pdf PDF
1a._Attch_1 _DD_254_Continuation.docx DOCX document
11._Attch_11 _L-6_Staffing_Matrix_GEODSS.doc DOC document
3._Attch_3 _Maui_CBA.pdf PDF
12._Attch_12 _L-7_Site_Visit__Visit_Access_Request_(ESL_Form_100).xlsx XLSX spreadsheet
8._Attch_8 _L-3_PP_Consent_Letter_GEODSS.doc DOC document
6._Attch_6 _L-1_PP_Relevancy_Matrix_GEODSS.xls XLS spreadsheet
4._Attch_4 _Socorro_CBA.pdf PDF
10._Attch_10 _L-5_PP_Transmittal_Letter_(Govt_Kt)_GEODSS.doc DOC document
1._Attch_1 _DD_254.pdf PDF
5._Attch_5 _Quality_Assurance_Surveillance_Plan.doc DOC document
2._Attch_2 _Performance_Work_Statement.pdf PDF
4a._Attch_4 _Socorro_CBA_Addendum.pdf PDF
Diego_Garcia_Energy_Management_Program.pdf PDF
GEODSS_FY13_Workload_Data.pdf PDF
3. Attch 3 Det 1 Site Map.pdf PDF
1. Attch 1 Site Visit Schedule.pdf PDF
2. Attch 2 Site Visit Visit Access Request —
0. FA2517-13-R-8001 GEODSS REVISED Notice of Site Visit.pdf PDF
1. Attch 1 Site Visit Schedule.pdf PDF
3. Attch 3 Det 1 Site Map.pdf PDF
0. FA2517-13-R-8001 GEODSS Notice of Site Visit.pdf PDF
2. Attch 2 Site Visit Visit Access Request —
Oct Nov and Dec Facilities PMIs.pdf PDF
Det 1-Equipment Repair PM Log.pdf PDF
Det 1-Work Orders.pdf PDF
Sep Facilities and CAS PMI's.pdf PDF
Det 1-PMI INDEX.PDF PDF
Socorro CBA.pdf PDF
Socorro CBA Addendum.pdf PDF
Maui CBA.pdf PDF
Maui Wage Determination.pdf PDF
Socorro Wage Determination.pdf PDF
DET 1 RPIE PCCIE Inventory.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP #FA2517-13-R-8001

Section J – Atch L-2

GEODSS

PAST/PRESENT PERFORMANCE QUESTIONNAIRE

When filled in this document is source selection sensitivE iaw FAR 2.101 & 3.104

SECTION 1: CONTRACT IDENTIFICATION

A. Contractor: _________________________________________________________________________ B. Cage Code of contractor contract was awarded to: _________________________________

C. Contract number: _______________________________________

D. Contract type: ______________________________

E. Was this a competitive contract? Yes _____ No _____

F. Period of performance: _________________________________________________________

G. Initial contract cost: $____________________________

H. Current/final contract cost: $_______________________________

I. Reasons for differences between initial contract cost and final contract costs: ___________________

J. Description of service provided: ______________________________________________________

SECTION 2: CUSTOMER OR AGENCY IDENTIFICATION

A. Customer or agency name: _________________________________________________________________________ B. Customer or agency description (if applicable): _______________________________________________________________

C. Geographic description of services under this contract, i.e. local, nationwide, worldwide, other Commands:

SECTION 3: EVALUATOR IDENTIFICATION

A. Evaluator's name: _________________________________________________________________________ B. Evaluator's title: _________________________________________________________________________ C. Evaluator's phone/fax number: ___________________________________________________________________

D. Number of year’s evaluator worked on subject contract: _____________________

SECTION 4: EVALUATION

Please indicate your satisfaction with the contractor’s performance by placing an “X” in the appropriate block using the scale provided to the right of each question. This scale is defined as follows:

CODE

PERFORMANCE LEVEL

E EXCEPTIONAL - The contractor’s performance meets contractual requirements and exceeds many (requirements) to the Government’s benefit. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

VG

VERY GOOD- The contractor’s performance meets contractual requirements and exceeds some (requirements) to the Government’s benefit. The contractual performance was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

S SATISFACTORY – The contractor’s performance meets contractual requirements. The contractual performance contained some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

M MARGINAL – Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

U UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

N

NOT APPLICABLE - Unable to provide a score.

TECHNICAL PERFORMANCE (T1 – T7)

E
VG
S
M
U
N

T1. Contractor’s ability to operate and maintain complex and critical mission system equipment.

T2. Ability to operate and maintain complex and critical communications-electronics equipment.

T3. Supply: Effectiveness in managing, controlling, acquiring and issuing supplies and equipment to assure continuous system operations.

T4. Ability to operate and maintain communications hardware and software, perform upgrades and maintain configuration control.

T5. Effectiveness in prioritizing and completing real property preventive maintenance and repair actions and documenting the work performed.

Please discuss response for which you indicated E (Exceptional), M (Marginal) or U (Unsatisfactory) in response to the questions above (use additional sheets, if necessary).

PROGRAM MANAGEMENT (P1 – P15)

E
VG
S
M
U
N

P1. Ability to attract and retain a qualified workforce at remote location(s).

P2. Ability to hire, retain and replace, if necessary, qualified personnel with required expertise to include appropriate certifications (when applicable).

P3. Effectiveness and efficiency of contractor’s organizational structure and staffing concept providing ability to organize, staff, lead, plan, coordinate and control resources.

P4. Contractor employees obtained and maintained the appropriate certifications (when applicable).

P5. Managers and supervisors possess technical and administrative abilities to meet contract requirements.

P6. Contract problems are effectively resolved in a timely manner without extensive guidance.

P7. Quality/effectiveness of sub-contracted efforts.

P8. Contractor is reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes).

P9. Effectiveness in managing Collective Bargaining Agreements and/or union negotiations

P10. Effectiveness in quality control and/or inspection procedures to meet contract requirements.

P11. Effectiveness in correcting deficiencies in a timely manner and pursuant to quality control procedures.

P12. Responsiveness to contract changes.

P13. Accuracy in completing line item cost proposals including all aspects of work required for each task.

P14. Effectiveness of material management (including Government Furnished Property)

P15. Contractor effectiveness in maintaining continuity of mission support while transitioning/phasing in resources and personnel to support other efforts.

P16. Overall compliance with contract terms and conditions.

Please discuss response for which you indicated E (Exceptional), M (Marginal) or U (Unsatisfactory) in response to the questions above (use additional sheets, if necessary).

COST/PRICE (C1)

E
VG
S
M
U
N

C1. Notification to Government of unforeseen costs before they occur; for example, notification of expenditure rate on Cost Reimbursable CLIN(s)

Please discuss response for which you indicated E (Exceptional), M (Marginal) or U (Unsatisfactory) in response to the questions above (use additional sheets, if necessary).

ADDITIONAL QUESTIONS:

1. Government Contracts Only: Has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations?

Yes___ Default___ Convenience___ Pending Terminations___

No ___

If yes, based on default, please explain (e.g., inability to meet cost, performance, or delivery schedules, etc).

2. What were the contractor’s most positive aspects in the performance of the contract?

3. What were the contractor’s most negative aspects in the performance of the contract? ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

4. Would you have any reservations about soliciting this contractor in the future or having them perform one of your critical and demanding programs?

5. Please provide any additional comments concerning this contractor’s performance, as desired.

Evaluator’s Signature

Date

Thank you for your prompt response and assistance!

Please return this completed questionnaire to:

Mailing Address: Mr. Austin Frindt, 21 CONS/LGCZB

135 Dover Street, Suite 1055

Peterson AFB CO 80914-1055

E-Mail/phone: austin.frindt@us.af.mil/719-556-1599 FAX to: (719) 556-1597

File details come from the government source that posted it. Updated .