Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch 1 - DFARS 252 209 7999.docx | DOCX document | |
| Atch 3 - Salient Characteristics.docx | DOCX document | |
| FA2517-12-T-6077 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
COMMERCIAL STACKABLE WASHER/DRYERS
27 August 2012
GENERAL INFORMATION
1.1 Provide non-personal services for all labor, materials, tools, equipment, and other work necessary to purchase, deliver, and install 3 stackable washer and dryers; in addition, remove all existing washers and dryers for the Main Child Development Center in Building 1350 located at 135 W. Paine Street, Peterson Air Force Base, Colorado Springs, CO. 80914
2. DESCRIPTION OF WORK
2.1 Remove existing washers and dryers from building 1350 laundry room located at 135 W. Paine Street, Peterson Air Force Base, Colorado Springs, CO. 80914. The laundry room will not be occupied at the time of installation and removal.
2.2 Deliver and install 3 stackable washers and dryers including all equipment necessary to make the installation (see attached sheets for specifications).
2.2.1 After the delivery, assembly, and installation of the 3 stackable washers and dryers is completed, mop the floors if water and dirt is present and dispose of the old 3 stackable washers and dryers off Peterson Air Force property in accordance with all applicable Federal, State and local criteria.
1. REQUIREMENTS
3.1 Environmental/Hazardous Materials Handling: all potentially hazardous materials removed from Peterson AFB shall be disposed of off Air Force property in accordance with all applicable Federal, State and local environmental criteria.
3.2 Records: The contractor shall provide delivery and warranty paperwork upon completion of work.
3.3 Warranty: A warranty shall be provided for all products against all defects in materials and workmanship, for one year period from the acceptance date.
4. TASK VERIFICATION/ACCEPTANCE: Representatives from 21 FSS/FSFC will be on site to verify all items were delivered and installed.
5. HOURS OF OPERATION
5.1 The contractor shall perform services required under this Statement of Work during the hours of 6:00 P.M. – 6:00 A.M., Monday through Friday excluding Federal Holidays.
6. SECURITY REQUIREMENTS
6.1 The Contractor shall be responsible for obtaining all necessary cards, passes, decals or other items required for access to Peterson AFB. The Contractor shall be required to apply for vehicle and individual base passes at the Peterson AFB Security Police Squadron Visitor Control Center at the West Gate. All personnel operating a vehicle on Peterson AFB shall be a licensed driver and all vehicles shall be licensed and insured. Upon completion or termination of the contract, the contractor shall surrender any vehicle identification to the Security Police at the Visitor Control Center.
7. DELIVERY: The contractor shall coordinate the day and time of delivery, installation, and removal of old furniture with Peterson Child Development Center Management (Ms. Ruby M. Belton or Ms. Dylia White) at 719-554-9572 or 719-554-9573.