About this file

Specification

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award, newest first.
File Type Posted
Amend3.doc DOC document
Attachment3.pdf PDF
Attachment19.pdf PDF
Attachment8.pdf PDF
Attachment5.pdf PDF
Attachment17.pdf PDF
Attachment11.pdf PDF
Attachment6.pdf PDF
Attachment15.pdf PDF
Div07.zip ZIP file
Div13.zip ZIP file
Div28.zip ZIP file
Div32.zip ZIP file
Attachment13.pdf PDF
Attachment24ClientAuthorization_Letter.docx DOCX document
Attachment23ConsentLetter.docx DOCX document
Attachment11.pdf PDF
Attachment21DemonstrationProjectSOW.zip ZIP file
Div27.zip ZIP file
Attachment5.pdf PDF
43 21 13.pdf PDF
Div33.zip ZIP file
Attachment6.pdf PDF
Attachment20Past Performance Questionnaire.doc DOC document
Div03.zip ZIP file
44 10 00.pdf PDF
43 21 29.pdf PDF
Div26.zip ZIP file
Div07.zip ZIP file
Attachment3.pdf PDF
Div02.zip ZIP file
04 20 00.pdf PDF
Div01.zip ZIP file
Div23.zip ZIP file
RequestforIndustryDay.docx DOCX document
01 55 07.pdf PDF
01 57 20.00 10 PAFB Environmental Protection.pdf PDF
01 35 00.pdf PDF
01 00 07.pdf PDF
Draft6April09.doc DOC document
01 57 20.00 10 SAFB Environmental Protection.pdf PDF
01 57 20.00 10 Environmental Protection.pdf PDF
01 55 07.pdf PDF
01 78 23.pdf PDF
01 55 04.pdf PDF
01 62 35 Recycled Recovered Materials.pdf PDF
01 78 00.pdf PDF
01 55 03.pdf PDF
01 00 02.pdf PDF
Draft6April09.doc DOC document
Show all 50

Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SABER Solicitation FA2517-08-R-5002

01 45 01-1 03/24/09

SECTION 01 45 01

CONTRACTOR’S QUALITY CONTROL

PART 1 GENERAL

1.1 QUALITY CONTROL

1.1.1 The Contractor is responsible for an effective quality control system in compliance with contract clause 52.246-12, “Inspection of Construction”. The quality control system shall consist of plans, procedures, and organization necessary to manage all task orders to produce end products that comply with the contract requirements. The system shall cover all construction operations, both on site and off site, and shall be keyed to the proposed construction sequence.

1.1.2 The Contractor shall establish, maintain, and implement a complete Quality Control Plan to ensure the requirements of the contract are provided as specified within 30 days after contract award. The Quality Control Plan shall be provided to the Contracting Officer for approval prior to task order execution.

1.1.3 Notification of Noncompliance. The Contracting Officer (CO) will notify the Contractor of any detected noncompliance with the requirements of this section. The Contractor shall take immediate corrective action after receipt of such notice. If the Contractor fails or refuses to comply promptly, the CO may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders shall be made the subject of claim for extension of time or for excess costs or damages by the Contractor.

1.2 QUALITY CONTROL PLAN CONTENTS

1.2.1 The Quality Control Plan shall identify:

1.2.1.1 Personnel, procedures, instructions, tests, forms, and records to be used.

1.2.1.2 The person within the Contractor’s organization identified as the Quality Control

Officer.

1.2.1.3 The authority and responsibilities of all the quality control personnel.

1.2.1.4 Procedures for reviewing and approving all shop drawings, product data samples or other submittals before submission to the Contracting Officer. Include procedures for obtaining field measurements.

1.2.1.5 Method of documenting quality control operation, inspection, and testing of both prime and subcontract work including samples of proposed forms.

1.2.1.6 Method of documenting and tracking deficiencies including responsibilities and procedures for correcting deficiencies.

01 45 01-2 03/24/09

1.3 COORDINATION MEETINGS

1.3.1 Initial Quality Meeting. After the pre-construction conference, before issuance of any task order under this contract the Contractor shall meet with the CO and discuss the contractor’s Quality Control Plan. During the meeting, a mutual understanding of the system details shall be developed, including the forms for recording quality control operations, control activities, testing, administration of the system for both on site and off site work, and the interrelationship of contractor's management and control with the government's quality assurance. Minutes of the meeting shall be prepared by the

Government and signed by both the Contractor and the CO. The minutes shall become a part of the contract file. There may be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings and/or address deficiencies in the quality control system or procedures that may require corrective action by the

Contractor.

1.3.2 Interface with Government Inspectors. The Quality Control Officer may request meetings with the Government to discuss quality issues when they arise. The Government reserves the right to conduct quality meetings at its discretion.

1.4 QUALITY CONTROL DOCUMENTATION

1.4.1 The Contractor shall maintain current records (daily construction logs) providing documented evidence that required quality control activities and/or tests have been performed. These records shall include the work of subcontractors and suppliers and shall be on a form acceptable to the CO that includes, as a minimum, the following information:

1.4.1.1 Contractor/subcontractor and their area of responsibility.

1.4.1.2 Work performed each day, giving location, description, and by whom.

1.4.1.3 Visitors (including inspectors) on site each day.

1.4.1.4 Test and/or control activities performed with results and references to specifications/ drawings requirements. List deficiencies noted along with corrective action.

1.4.1.5 Job safety evaluations stating what was checked, results, and instructions or corrective actions.

1.4.1.6 Instructions given/received and conflicts in plans and/or specifications.

1.4.2 These records shall indicate a description of trades working on the project; the number of personnel working; weather conditions encountered; and any delays encountered. These records shall cover both conforming and deficient features and shall include a statement that equipment and materials incorporated in the work and workmanship comply with the contract.

1.4.3 These records shall be available to government personnel upon request.

01 45 01-3 03/24/09

PART 2 PRODUCTS – Not Used

PART 3 EXECUTION – Not Used

END OF SECTION 01 45 01

01 45 01-4 03/24/09