Amend3.doc

DOC document 89 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award Federal contract opportunity
Solicitation number
FA2517-08-R-5002
Issued by
Department of the Air Force Space Command

About this file

Solicitation FA2517-08-R-5002 Amendment 3

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award, newest first.
File Type Posted
23Sep09ConformedCopy.doc DOC document
Attachment10.pdf PDF
Attachment7.pdf PDF
Attachment16.pdf PDF
Attachment18.pdf PDF
Attachment4.pdf PDF
Div06.zip ZIP file
Div01.zip ZIP file
Div09.zip ZIP file
Div23.zip ZIP file
44 46 00.pdf PDF
Attachment12.pdf PDF
Div12.zip ZIP file
04 20 00.pdf PDF
Div33.zip ZIP file
14 24 00.pdf PDF
44 10 00.pdf PDF
34 71 13.19.pdf PDF
Div08.zip ZIP file
Amendment1.doc DOC document
Attachment4.pdf PDF
Attachment22CutSheets.zip ZIP file
25 08 10.pdf PDF
Attachment15.pdf PDF
32 93 00.zip ZIP file
Div28.zip ZIP file
Attachment17.pdf PDF
Attachment9.pdf PDF
04 21 13.pdf PDF
FA251708R5002.doc DOC document
Attachment23ConsentLetter.docx DOCX document
Attachment16.pdf PDF
Attachment4.pdf PDF
Div10.zip ZIP file
01 00 03.pdf PDF
01 04 00.pdf PDF
01 33 00.pdf PDF
01 00 05.pdf PDF
COVER SHT TOC ABBREVIATIONS.pdf PDF
01 55 02.pdf PDF
01 00 01.pdf PDF
01 00 04.pdf PDF
RequestforIndustryDay.docx DOCX document
01 57 20.00 10 SAFB Environmental Protection.pdf PDF
01 55 01.pdf PDF
01 00 05.pdf PDF
RequestforIndustryDay.docx DOCX document
01 00 07.pdf PDF
01 35 29.pdf PDF
01 33 00.pdf PDF
Show all 50

Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 24-Sep-2009 02:30 PM to 29-Sep-2009 02:30 PM.

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

EVALUATION FACTORS

CLAUSES INCORPORATED BY REFERENCE

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

(End of provision)

M-1 SOURCE SELECTION

A. Basis for Contract Award: This is a competitive best value source selection in which technically acceptable competing offerors' past performance will be evaluated on an approximately equal basis to cost or price considerations. Offerors must pass the technical evaluation for further consideration of their proposal. Where applicable, the techniques and procedures described under FAR 15.404-1 will be the primary means of assessing proposal reasonableness. The Government intends to award a contract(s) without discussions with respective offerors; therefore, offerors should submit proposals which represent their best efforts. The Government, however reserves the right to conduct discussions if deemed in its best interest. The Government proposes to award contracts to up to three offerors whose technically acceptable proposals represent the best overall value to the government based on the total evaluated coefficient and the past performance confidence rating. Failure to propose for any item in the Coefficient Schedule B, including any option year, or failure to comply with any terms and conditions of this solicitation may cause the offeror’s proposal to be rejected as non-responsive. If the lowest weighted evaluated coefficient, technically acceptable offer is judged to have “substantial confidence” assessment rating, that offer represents the best value for the Government. The Government reserves the right to award a contract to other than the lowest priced offeror if the lowest priced offeror is judged to have a performance confidence assessment of “Satisfactory Confidence” or lower. In that event, the Source Selection Authority (SSA) shall make an integrated assessment best value award decision.

B. Evaluation Process: Technical Proposals will be evaluated for technical acceptability on a pass/fail basis (Refer to Section M-2 Factor 1). Recent and relevant past performance will be evaluated for quality and an overall confidence assessment (Refer to Section M-2 Factor 2) will be assigned to each offeror. Cost/Price will be evaluated based on contractor coefficients for each installation where a weighted average of the contractor coefficients for each CLIN will be taken. Overall contractor coefficient will be a weighted average of the contractor coefficients for all installations (Refer to Section M-2 Factor 3).

C. Number of Contracts to Be Awarded: The Government may award up to three contracts for this acquisition.

M-2 EVALUATION FACTORS AND SUBFACTORS

A. Evaluation of Proposals: The Government will select the proposal(s) that gives the best value to the Government. To arrive at a decision, the Source Selection Evaluation Team will assess each offer in accordance with the following evaluation factors:

Factor 1: Technical Capability Factor

Subfactor 1: Organizational Management

Subfactor 2: Demonstration Project

Factor 2: Past Performance Information Factor

Factor 3: Price/Cost Factor

B. Relative Importance or Weighting of the Factors: The relative importance or weighting of each factor is as follows: Factor 2 (Past Performance/Performance Confidence) is approximately equal to Factor 3 (Price/Cost). Past Performance is the only factor to be traded against Cost/Price. The technical proposal must meet minimum standards on a pass/fail basis.

Factor 1- Technical Capability: The Government technical evaluation team shall evaluate, on a pass/fail basis, the technical proposals submitted against the following subfactors:

Subfactor 1- Organizational Management: The Offeror shall demonstrate their approach to satisfying the requirements of Section 01 31 01 of the specifications. The standard is met when the proposal adequately:

a) provides an organizational plan described in section 01 31 01 which includes a chart showing clear, logical lines of authority for the management of this contract, including all Key Personnel, subcontractor or teaming partner management, and all other required functions;

b) meets the job descriptions and required qualifications of each Key Personnel member; and

c) provides a Quality Control Plan as required in section 01 45 01 of the specifications.

Subfactor 2 - Demonstration Project: The proposal shall demonstrate the offeror’s performance capability. The proposal shall meet the requirements in the specifications. The standard is met when the proposal adequately:

a) provides the requirements listed in Section 01 00 00 of the specifications.

b) demonstrates reasonable decisions in the offeror’s assumptions and approaches regarding the demonstration project;

c) provides all incidental design information that was missing from the demonstration project;

d) provides correct calculations or other documents to support the design information required in the proposal for the project to include a complete and reasonable cost proposal adhering to the requirements in Section 01 00 40 of the specifications; and

e) demonstrates RS MEANS line items adhering to the criteria detailed in the specifications for this RFP.

Factor 2- Past Performance Information: Using the past performance questionnaires referenced in Section L, found in Section J, Attachment 20, or any other means (e.g. telephone email etc.), the contracting officer shall seek performance information based on (1) the references provided by the offeror and (2) data independently obtained from other Government and commercial sources. The purpose of the past performance evaluation is to allow the Government to assess the offeror’s ability to perform the effort described in this solicitation, based on the offeror’s demonstrated present and past performance. Past Performance shall be evaluated in accordance with AFFARS 5315.305. The assessment process will result in an overall confidence assessment rating (see below table) of substantial confidence, satisfactory confidence, limited confidence, no confidence, and unknown confidence. Past performance regarding predecessor companies, key personnel who have relevant experience, or sub-contractors or teaming partners that will perform major or critical aspects of the requirement will be rated as highly as past performance information for the principal offeror. Adverse past performance is defined as past performance information that supports a less than satisfactory confidence assessment on any evaluation aspect or any unfavorable comment received from sources without a formal rating system. The offeror will have an opportunity to address any negative past performance information which he has not already had the opportunity to address. The Government’s Performance Confidence Assessment Group (PCAG) shall evaluate the offeror’s past performance and will assign a confidence rating to the past performance as follows:

Performance Confidence Table

Substantial Confidence
Based on the offeror’s performance record, the government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s performance record, the government has an expectation that the offeror will successfully perform the required effort.
Limited Confidence
Based on the offeror’s performance record, the government has low expectation that the offeror will successfully perform the required effort.
No Confidence
Based on the offeror’s performance record, the government has no expectation that the offeror will be able to successfully perform the required effort.
Unknown Confidence
No performance record is identifiable or the offeror’s performance record is so limited that no confidence assessment rating can be reasonably assigned.

Recency: The Offeror shall provide past performance from work accomplished in the last three years prior to the issue date of the solicitation. Projects that are not recent will not be evaluated. The date of recent projects will be validated by the PCAG, as approved by the Contracting Officer.

Relevancy: A relevancy determination of the offeror's present and past performance, including joint ventures, subcontractors and/or teaming partners, will be made. In determining relevancy for individual citations, consideration will be given to the effort, or portion of the effort, being proposed by the offeror, teaming partner, or subcontractor whose contract is being reviewed and evaluated. Higher relevancy will be assessed for contracts that are most similar to the effort, or portion of the effort, for which that contractor is being proposed, and may contribute to an overall higher relevancy determination for the offeror. A relevant contract includes multi-tasked construction projects, preferably at multiple locations and cities, of varying complexity, as well as prior SABER or multiple delivery order type construction contracts with multiple simultaneous projects at different locations and cities ranging from $50,000.00 to $750,000.00 or greater. A relevant project must consist of any performance on a broad range of maintenance, repair, alteration or new construction of real property, showing the capability to perform and manage a wide scope of construction trades including, but not limited to, carpentry, road repair, roofing, excavation, interior electric, steam fitting, plumbing, sheet metal, painting, demolition, concrete, masonry and welding. The Government is not bound by the offeror's opinion of relevancy. In evaluating past performance, the Government reserves the right to give greater consideration to information on those contracts deemed most relevant to the effort described in this solicitation. The following relevancy definitions apply:

Relevancy Table

Relevant
Past/present performance effort involved much of the magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Past/present performance effort involved some of the magnitude of effort and complexities this solicitation requires.
Not Relevant
Past/present performance effort did not involve any of the magnitude of effort and complexities this solicitation requires.

Performance Quality: The PCAG shall evaluate the quality of the past performance. Quality will be evaluated in the following five focus areas: Quality Control, Timely Performance, Effectiveness of Management, Compliance with Labor Standards, and Compliance with Safety. Performance Quality ratings are described by one of the following five adjectives: Outstanding, Above Average, Satisfactory, Marginal and Unsatisfactory. A single performance quality rating will be assessed for each citation based on an integrated assessment in the performance quality ratings of the five focus areas listed above.

Quality Evaluation Table

Outstanding
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Above Average
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet significant contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

An overall confidence assessment will then be developed based upon the recency, relevancy, and quality rating. (See Performance Confidence Table in Factor 2 above).

Factor 3- Cost/Price: The Government will evaluate all items identified in Section L Volume III a-g. The Government will ensure all fill-ins are complete, all Small Business documentation is in order, and offeror’s bonding capacity is in accordance with Section F paragraph B, (FAR clause 52.228-15). For proposal evaluation purposes a single coefficient will be developed on each offer. This single coefficient will be based on the amount of work anticipated by each Coefficient listed in the Coefficient Schedule B, based on the following estimated percentages of work distribution. Each numbered coefficient from the Coefficient Schedule B will be multiplied by the percentage listed below for that coefficient and summed to a subtotal. The subtotal will be multiplied by the percentage of anticipated work for each installation. Those subtotals will then be summed to result in the single weighted coefficient for evaluation purposes. The lowest numerical single weighted coefficient will be considered the lowest price proposal. For purposes of evaluation, the dollar value of $200,000,000.00 will be multiplied by the single coefficient to determine the proposed price for purposes of any price-past performance tradeoff.

Example Weighted Evaluation of Price Proposal – Coefficients Base Year Estimated Percentages of Work Distribution

LOCATION

PERCENTAGE

Peterson AFB:

21%

Peterson AFB:

Standard Hours-Secured Area (Order $750,000 and Below)

4%

Standard Hours-Secured Area (Order Above $750,000)

1%

Standard Hours-Non-Secured Area (Order $750,000 and Below)

70%

Standard Hours-Non-Secured Area (Order Above $750,000)

21%

Non-Standard Hours-Secured Area (Order $750,000 and Below)

Non-Standard Hours-Secured Area (Order Above $750,000)

Non-Standard Hours-Non-Secured Area (Order $750,000 and Below)

1%

Non-Standard Hours-Non-Secured Area (Order Above $750,000)

Cheyenne Mountain Air Force Station:

13%

Cheyenne Mountain Air Force Station:

62%

32%

1%

Non-Standard Hours-Non-Secured Area (Order Above $750,000)

1%

Ft Carson: (to include Pinon Canyon and Pueblo Chemical Depot)

14%

Ft Carson:

46%

40%

1%

Non-Standard Hours-Non-Secured Area (Order Above $750,000)

1%

Pinon Canyon:

Standard Hours-Non-Secured Area (Order $750,000 and Below)

1%

Non-Standard Hours-Non-Secured Area (Order Above $750,000)

1%

Pueblo Chemical Depot:

Non-Standard Hours-Non-Secured Area (Order Above $750,000)

Schriever AFB:

4%

Schriever AFB:

Standard Hours-Secured Area (Order $750,000 and Below) 67%

Standard Hours-Secured Area (Order Above $750,000) 1%

Standard Hours-Non-Secured Area (Order $750,000 and Below) 27%

Standard Hours-Non-Secured Area (Order Above $750,000) 1%

Non-Standard Hours-Secured Area (Order $750,000 and Below) 1%

Non-Standard Hours-Secured Area (Order Above $750,000) 1%

Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) 1%

Non-Standard Hours-Non-Secured Area (Order Above $750,000) 1%

United States Air Force Academy: (to Include Farish Memorial Recreation 24% and Bulls Eye Auxiliary Air Field)

United States Air Force Academy:

Standard Hours-Secured Area (Order $750,000 and Below) 37%

Standard Hours-Secured Area (Order Above $750,000) 3%

Standard Hours-Non-Secured Area (Order $750,000 and Below) 37%

Standard Hours-Non-Secured Area (Order Above $750,000) 3%

Non-Standard Hours-Secured Area (Order $750,000 and Below) 9%

Non-Standard Hours-Secured Area (Order Above $750,000) 1%

Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) 9%

Non-Standard Hours-Non-Secured Area (Order Above $750,000) 1%

Buckley AFB:

14%

Buckley AFB:

16%

Standard Hours-Non-Secured Area (Order $750,000 and Below) 78%

Standard Hours-Non-Secured Area (Order Above $750,000) 1%

Non-Standard Hours-Secured Area (Order $750,000 and Below) 1%

Non-Standard Hours-Secured Area (Order Above $750,000) 1%

Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) 1%

Non-Standard Hours-Non-Secured Area (Order Above $750,000) 1%

FE Warren AFB:

10%

FE Warren AFB:

Standard Hours-Secured Area (Order $750,000 and Below) 23%

Standard Hours-Secured Area (Order Above $750,000) 1%

Standard Hours-Non-Secured Area (Order $750,000 and Below) 54%

Standard Hours-Non-Secured Area (Order Above $750,000) 1%

Non-Standard Hours-Secured Area (Order $750,000 and Below) 1%

Non-Standard Hours-Secured Area (Order Above $750,000) 1%

Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) 1%

Non-Standard Hours-Non-Secured Area (Order Above $750,000) 1%

FE Warren Missile Field:

14%

The following is an example of the evaluation weighting for the base year:

Peterson AFB

Anticipated

Proposed Weighted

Work %

Coeff.

Coeff.

Standard Hours-Secured Area (Order $750,000 and Below)

4% 1.1100

.0444

Standard Hours-Secured Area (Order Above $750,000)

1% 1.1000

.0110

Standard Hours-Non-Secured Area (Order $750,000 and Below) 70% 1.0000

.7000

Standard Hours-Non-Secured Area (Order Above $750,000)

21% 1.0500

.2205

Non-Standard Hours-Secured Area (Order $750,000 and Below) 1% 1.2000

.0120

Non-Standard Hours-Secured Area (Order Above $750,000)

1% 1.1700

.0117

Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) 1% 1.1000

.0110

Non-Standard Hours-Non-Secured Area (Order Above $750,000) 1% 1.0800

.0108

SUBTOTAL

1.0214 X 21%

Cheyenne Mountain Air Force Station:

Standard Hours-Secured Area (Order $750,000 and Below)

62% 1.1500

.7130

Standard Hours-Secured Area (Order Above $750,000)

1% 1.1200

.0112

Standard Hours-Non-Secured Area (Order $750,000 and Below) 32% 1.0500

.3360

Standard Hours-Non-Secured Area (Order Above $750,000)

1% 1.0300

.0103

Non-Standard Hours-Secured Area (Order $750,000 and Below) 1% 1.2000

.0120

Non-Standard Hours-Secured Area (Order Above $750,000)

1% 1.1800

.0118

Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) 1% 1.1200

.0112

Non-Standard Hours-Non-Secured Area (Order Above $750,000) 1% 1.0800

1.1163 X 13%

Ft Carson:

Standard Hours-Secured Area (Order $750,000 and Below)

1% 1.1100

.0111 Standard Hours-Secured Area (Order Above $750,000)

1% 1.1000

.0110

Standard Hours-Non-Secured Area (Order $750,000 and Below) 46% 1.0000

.4600 Standard Hours-Non-Secured Area (Order Above $750,000)

40% 1.0500

.4200 Non-Standard Hours-Secured Area (Order $750,000 and Below) 1% 1.2000

.0120

Non-Standard Hours-Secured Area (Order Above $750,000)

1% 1.1700

.0117

Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) 1% 1.1000

.0110

Non-Standard Hours-Non-Secured Area (Order Above $750,000) 1% 1.0800

.0108

Pinon Canyon:

Standard Hours-Non-Secured Area (Order $750,000 and Below) 1% 1.1000

.0110

Standard Hours-Non-Secured Area (Order Above $750,000)

1% 1.2000

.0120

Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) 1% 1.1000

.0110

Non-Standard Hours-Non-Secured Area (Order Above $750,000) 1% 1.0800

.0108

Pueblo Chemical Depot:

Standard Hours-Non-Secured Area (Order $750,000 and Below) 1% 1.1000 .0110

Standard Hours-Non-Secured Area (Order Above $750,000) 1% 1.2000 .0120

1.1000 .0110

Non-Standard Hours-Non-Secured Area (Order Above $750,000)

1.0800

1.0372 X 14%

Schriever AFB:

67% 1.1500

.7705 Standard Hours-Secured Area (Order Above $750,000)

1% 1.1200

.0112

Standard Hours-Non-Secured Area (Order $750,000 and Below) 27% 1.0500

.2835 Standard Hours-Non-Secured Area (Order Above $750,000)

1% 1.0300

.0103

Non-Standard Hours-Secured Area (Order $750,000 and Below) 1% 1.2000

.0120

Non-Standard Hours-Secured Area (Order Above $750,000)

1% 1.1800

.0118

Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) 1% 1.1200

.0112

Non-Standard Hours-Non-Secured Area (Order Above $750,000) 1% 1.0800

1.1213 X 4%

United States Air Force Academy: (to include Farish Memorial Recreation and Bulls Eye Auxiliary Air Field)

37% 1.1500

.4255

Standard Hours-Secured Area (Order Above $750,000)

3% 1.1200

.0334

Standard Hours-Non-Secured Area (Order $750,000 and Below) 37% .09800

.3626

Standard Hours-Non-Secured Area (Order Above $750,000)

3% .09950

.0299

Non-Standard Hours-Secured Area (Order $750,000 and Below) 9% 1.2000

.1080

Non-Standard Hours-Secured Area (Order Above $750,000)

1% 1.1800

.0118

Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) 9% .09950

.0896

Non-Standard Hours-Non-Secured Area (Order Above $750,000) 1% 1.0800

1.0716 X 24%

Buckley AFB:

16% 1.1500

.1840 Standard Hours-Secured Area (Order Above $750,000)

1% 1.1200

.0112

Standard Hours-Non-Secured Area (Order $750,000 and Below) 78% 1.0500

.8190 Standard Hours-Non-Secured Area (Order Above $750,000)

1% 1.0300

.0103

Non-Standard Hours-Secured Area (Order $750,000 and Below) 1% 1.2000

.0120

Non-Standard Hours-Secured Area (Order Above $750,000)

1% 1.1800

.0118

Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) 1% 1.1200

.0112

Non-Standard Hours-Non-Secured Area (Order Above $750,000) 1% 1.0800

1.0703 X 14%

FE Warren AFB:

23% 1.2000

.2760

Standard Hours-Secured Area (Order Above $750,000)

1% 1.1800

.0118

Standard Hours-Non-Secured Area (Order $750,000 and Below) 54% 1.0500

.5670

Standard Hours-Non-Secured Area (Order Above $750,000)

1% 1.0300

.0103

Non-Standard Hours-Secured Area (Order $750,000 and Below) 1% 1.2500

.0125

Non-Standard Hours-Secured Area (Order Above $750,000)

1% 1.2300

.0123

Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) 1% 1.1200

.0112

Non-Standard Hours-Non-Secured Area (Order Above $750,000) 1% 1.1000

.0110 FE Warren Missile Field:

Standard Hours-Secured Area (Order $750,000 and Below)

14% 1.100 .1540

Standard Hours-Secured Area (Order Above $750,000)

1% 1.120 .0112

Non-Standard Hours-Secured Area (Order $750,000 and Below) 1% 1.230 .0123 Non-Standard Hours-Secured Area (Order Above $750,000)

1% 1.100 .0110

1.1006 X 10%

Calculation for base year Weighted Average Coefficient:

Peterson + Cheyenne + Ft Carson + Schriever +

USAFA +

Buckley + FE Warren =

(1.0214 x .21)+(1.1163 x .13)+(1.0372 x .14)+(1.1213 x .04)+(1.0716 x .24)+(1.0703 x .14)+(1.1006 x .10)= 1.0668

Total Weighted Average Coefficient (base year)

1.0668 (100%)

Total Weighted Average Coefficient (option year 1) 1.0735

Total Weighted Average Coefficient (option year 2) 1.0910

Total Weighted Average Coefficient (option year 3) 1.0852

Total Weighted Average Coefficient (option year 4) 1.0715

Total (base year plus option years, used for proposal evaluation) 5.3880/5= 1.0776

1.0776 times $200,000,000.00 equals $215,520,000.00, "proposed price" for evaluation of tradeoffs.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .