About this file

Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award, newest first.
File Type Posted
23Sep09ConformedCopy.doc DOC document
Attachment10.pdf PDF
Attachment7.pdf PDF
Attachment16.pdf PDF
Attachment18.pdf PDF
Attachment4.pdf PDF
Div06.zip ZIP file
Div01.zip ZIP file
Div09.zip ZIP file
Div23.zip ZIP file
44 46 00.pdf PDF
Attachment12.pdf PDF
Div12.zip ZIP file
04 20 00.pdf PDF
Div33.zip ZIP file
14 24 00.pdf PDF
44 10 00.pdf PDF
34 71 13.19.pdf PDF
Div08.zip ZIP file
Amendment1.doc DOC document
Attachment4.pdf PDF
Attachment22CutSheets.zip ZIP file
25 08 10.pdf PDF
Attachment15.pdf PDF
32 93 00.zip ZIP file
Div28.zip ZIP file
Attachment17.pdf PDF
Attachment9.pdf PDF
04 21 13.pdf PDF
FA251708R5002.doc DOC document
Attachment23ConsentLetter.docx DOCX document
Attachment16.pdf PDF
Attachment4.pdf PDF
Div10.zip ZIP file
01 00 03.pdf PDF
01 04 00.pdf PDF
01 33 00.pdf PDF
01 00 05.pdf PDF
COVER SHT TOC ABBREVIATIONS.pdf PDF
01 55 02.pdf PDF
01 00 01.pdf PDF
01 00 04.pdf PDF
RequestforIndustryDay.docx DOCX document
01 57 20.00 10 SAFB Environmental Protection.pdf PDF
01 55 01.pdf PDF
01 00 05.pdf PDF
RequestforIndustryDay.docx DOCX document
01 00 07.pdf PDF
01 35 29.pdf PDF
01 33 00.pdf PDF
Show all 50

Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SABER Solicitation FA2517-08-R-5002

01 35 00-1 03/24/09

SECTION 01 35 00

SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE

AIRFIELD OR AIRFIELD HANGARS

PART 1 GENERAL

1.1 The following provisions apply when work is required to take place on the active airfield/hangar, or within the clear zones or primary surfaces. Flightlines are present on the

United States Air Force Academy, Buckley AFB, Peterson AFB, and Fort Carson Army

Post.

1.2 CLOSURES

1.2.1 All runway, taxiway or hangar closures will require the coordination of Base Operations through the Contracting Officer not less than 14 calendar days prior to the requested closure, unless otherwise provided for in these specifications. The Contractor will make the maximum utilization of time during the requested closure period. The Contractor will notify the Contracting Officer when he is finished with the work requiring the closure.

The Contractor will schedule his operations in phases if necessary so as to minimize the effect of his construction closures on normal airfield operations.

1.3 COORDINATION OF WORK

1.3.1 The Contractor shall coordinate with the Contracting Officer before initiating any work and will notify them of the proposed location of work and time of operation.

1.4 PERSONNEL SAFETY PRECAUTIONS

1.4.1 Aircraft and support equipment operating in/near hangars, on/near the runways, taxiways, and aprons make the area of construction a zone of high level noise. The Contractor shall take the necessary precautions, such as the use of earplugs or muffs to prevent injury to the auditory systems of all personnel working in the area.

1.5 RESTRICTIONS

1.5.1 No Contractor vehicles, equipment, or personnel shall be on or crossing any active runway or taxiway, except during construction period closures as outlined herein or when clearance is requested from and granted by the control tower. All Contractor vehicles operating on the landing areas (1,000 feet on either side of the runway center line) during the period from dawn to dusk will be identified by mounted electric battery operated low intensity, yellow or amber flashing lights. When Contractor operations require them to cross an active runway or other controlled area on a regular basis, they shall furnish a two-way radio in order to maintain contact with the control tower. The Government will provide the Contractor with the correct frequency. Use of the government provided radio frequency for other purposes will be strictly prohibited.

SABER Solicitation FA2517-08-R-5002

01 35 00-2 03/24/09

1.6 CLEANLINESS OF WORK AREA

1.6.1 The Contractor will be required to maintain cleanliness of all work areas at all times during progression of work in order to alleviate foreign object damage (FOD). The

Contractor will be required to remove all materials and equipment to a safe distance from the runway or aircraft parking area at the close of each day’s work. This distance will be determined by Base Operations. The Contractor will not be allowed to stockpile any materials or store any equipment within 1,000 feet of the runway centerline.

1.7 EMERGENCIES

1.7.1 There may be periods of time when the Contractor, due to declared aircraft emergencies, will be required to vacate the work site and move their personnel and equipment a distance of several hundred feet away from the work site. Such removals, when ordered, will be given on short notice and expeditious action will be required. Whenever the

Contractor is required to clear the work area, the Contractor accompanied by the inspector or Air Force representative will make an inspection sweep of the entire area to ensure all tools, equipment, and personnel have been removed from the runway, active taxiway or hangar, and that the area is available for landings or parking.

PART 2 PRODUCTS – Not Used

PART 3 EXECUTION – Not Used

END OF SECTION 01 35 00