01 62 35 Recycled Recovered Materials.pdf
PDF 11 KB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award Federal contract opportunity
- Solicitation number
- FA2517-08-R-5002
About this file
Specification
View the file
Other files for this federal contract opportunity
Show all 50
Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SABER Solicitation FA2517-08-R-5002
01 62 35 - 1 03/24/09
SECTION 01 62 35
RECYCLED / RECOVERED MATERIALS
PART 1 GENERAL
1.1 REFERENCES
1.1.1 The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. Unless other wise noted, the latest published version and/or revision shall be used.
1.1.1.1 U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
a. 40 CFR 247 Comprehensive Procurement Guideline for Products Containing
Recovered Materials
1.2 OBJECTIVES
1.2.1 Government procurement policy is to acquire, in a cost effective manner, items containing the highest percentage of recycled and recovered materials practicable consistent with maintaining a satisfactory level of competition without adversely affecting performance requirements or exposing suppliers' employees to undue hazards from the recovered materials. The
Environmental Protection Agency (EPA) has designated certain items which must contain a specified percent range of recovered or recycled materials. EPA designated products specified in this contract comply with the stated policy and with the EPA guidelines. The Contractor shall make all reasonable efforts to use recycled and recovered materials in providing the EPA designated products and in otherwise utilizing recycled and recovered materials in the execution of the work.
1.3 EPA DESIGNATED ITEMS INCORPORATED IN THE WORK
1.3.1 Various sections of the specifications contain requirements for materials that have been designated by EPA as being products which are or can be made with recovered or recycled materials. These items, when incorporated into the work under this contract, shall contain at least the specified percentage of recycled or recovered materials unless adequate justification (non-availability) for non-use is provided. When a designated item is specified as an option to a non-designated item, the designated item requirements apply only if the designated item is used in the work.
1.4 EPA PROPOSED ITEMS INCORPORATED IN THE WORK
1.4.1 Products other than those designated by EPA are still being researched and are being considered for future Comprehensive Procurement Guideline (CPG) designation. It is recommended that these items, when incorporated in the work under this contract, contain the highest practicable percentage of recycled or recovered materials, provided specified requirements are also met.
1.5 EPA LISTED ITEMS USED IN CONDUCT OF THE WORK BUT NOT INCORPORATED IN
THE WORK
1.5.1 There are many products listed in 40 CFR 247 which have been designated or proposed by EPA
SABER Solicitation FA2517-08-R-5002
01 62 35 - 2 03/24/09 to include recycled or recovered materials that may be used by the Contractor in performing the work but will not be incorporated into the work. These products include office products, temporary traffic control products, and pallets. It is recommended that these non-construction products, when used in the conduct of the work, contain the highest practicable percentage of recycled or recovered materials and that these products be recycled when no longer needed.
1.6 SUBMITTALS
1.6.1 Government approval may be required on any of the following items. Items requiring submittals will be listed on the Submittal Register. Provide copies of all submittals per the requirements in
Section 01 33 00, Submittal Procedures, or as listed on the Submittal Register.
1.7 RELATED REQUIREMENTS
1.7.1 The information provided in this section applies to all other specification sections that are applicable to project.
END OF SECTION 01 62 35