About this file

Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award, newest first.
File Type Posted
Amend3.doc DOC document
Attachment3.pdf PDF
Attachment19.pdf PDF
Attachment8.pdf PDF
Attachment5.pdf PDF
Attachment17.pdf PDF
Attachment11.pdf PDF
Attachment6.pdf PDF
Attachment15.pdf PDF
Div07.zip ZIP file
Div13.zip ZIP file
Div28.zip ZIP file
Div32.zip ZIP file
Attachment13.pdf PDF
Attachment24ClientAuthorization_Letter.docx DOCX document
Attachment23ConsentLetter.docx DOCX document
Attachment11.pdf PDF
Attachment21DemonstrationProjectSOW.zip ZIP file
Div27.zip ZIP file
Attachment5.pdf PDF
43 21 13.pdf PDF
Div33.zip ZIP file
Attachment6.pdf PDF
Attachment20Past Performance Questionnaire.doc DOC document
Div03.zip ZIP file
44 10 00.pdf PDF
43 21 29.pdf PDF
Div26.zip ZIP file
Div07.zip ZIP file
Attachment3.pdf PDF
Div02.zip ZIP file
04 20 00.pdf PDF
Div01.zip ZIP file
Div23.zip ZIP file
RequestforIndustryDay.docx DOCX document
01 55 07.pdf PDF
01 57 20.00 10 PAFB Environmental Protection.pdf PDF
01 35 00.pdf PDF
01 00 07.pdf PDF
Draft6April09.doc DOC document
01 57 20.00 10 SAFB Environmental Protection.pdf PDF
01 57 20.00 10 Environmental Protection.pdf PDF
01 55 07.pdf PDF
01 78 23.pdf PDF
01 55 04.pdf PDF
01 62 35 Recycled Recovered Materials.pdf PDF
01 78 00.pdf PDF
01 55 03.pdf PDF
01 00 02.pdf PDF
Draft6April09.doc DOC document
Show all 50

Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SABER Solicitation FA2517-08-R-5002

01 35 29-1 03/24/09

SECTION 01 35 29

SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

1.1.1 The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. Unless other wise noted, the latest published version and/or revision shall be used.

1.1.1.1 AMERICAN SOCIETY OF SAFETY ENGINEERING (ASSE)

a. ASSE A10.32 Personal Fall Protection - Safety Requirements for Construction and Demolition Operations

b. ASSE A10.34 Protection of the Public on or Adjacent to Construction Sites

c. ASSE Z359.1 Safety Requirements for Personal Fall Arrest Systems, Subsystems and Components

1.1.1.2 ASME INTERNATIONAL (ASME)

a. ASME B30.22 Articulating Boom Cranes

b. ASME B30.3 Construction Tower Cranes

c. ASME B30.5 Mobile and Locomotive Cranes

1.1.1.3 NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

a. NFPA 10 Standard for Portable Fire Extinguishers

b. NFPA 241 Safeguarding Construction, Alteration, and Demolition

Operations

c. NFPA 51B Fire Prevention During Welding, Cutting, and Other Hot Work

d. NFPA 70 National Electrical Code

e. NFPA 70E Electrical Safety in the Workplace

1.1.1.4 U.S. ARMY CORPS OF ENGINEERS (USACE)

a. EM 385-1-1 Safety -- Safety and Health Requirements

1.1.1.5 U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

a. 29 CFR 1910 Occupational Safety and Health Standards (OSHA)

b. 29 CFR 1910.146 Permit-required Confined Spaces

c. 29 CFR 1915 Confined and Enclosed Spaces and Other Dangerous

Atmospheres in Shipyard Employment

d. 29 CFR 1926 Safety and Health Regulations for Construction

e. 29 CFR 1926.500 Fall Protection

01 35 29-2 03/24/09

1.2 SUBMITTALS

1.2.1 Government approval may be required on any of the following items. Items requiring submittals will be listed on the Submittal Register. Provide copies of all submittals per the requirements in

Section 01 33 00, Submittal Procedures, or as listed on the Submittal Register.

1.2.1.1 SD-01 Preconstruction Submittals

a. Accident Prevention Plan (APP)

b. Activity Hazard Analysis (AHA)

c. Crane Critical Lift Plan

d. Proof of qualification for Crane Operators

1.2.1.2 SD-06 Test Reports

a. Reports

(1) Submit reports as their incidence occurs, in accordance with the requirements of the paragraph entitled, "Reports."

b. Accident Reports

c. Monthly Exposure Reports

d. Crane Reports

e. Regulatory Citations and Violations

1.2.1.3 SD-07 Certificates

a. Confined Space Entry Permit

b. Hot work permit

c. Contractor Safety Self-Evaluation Checklist

d. Submit one copy of each permit/certificate attached to each Daily Report.

1.3 DEFINITIONS

1.3.1 Competent Person for Fall Protection. A person who is capable of identifying hazardous or dangerous conditions in the personal fall arrest system or any component thereof, as well as their application and use with related equipment, and has the authority to take prompt corrective measures to eliminate the hazards of falling.

1.3.2 High Visibility Accident. Any mishap which may generate publicity and/or high visibility.

1.3.3 Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even though provided by a physician or registered personnel.

1.3.4 Operating Envelope. The area surrounding any crane. Inside this "envelope" is the crane, the operator, riggers and crane walkers, rigging gear between the hook and the load, the load and the crane's supporting structure (ground, rail, etc.).

01 35 29-3 03/24/09

1.3.5 Qualified Person for Fall Protection. A person with a recognized degree or professional certificate and with extensive knowledge, training and experience in the field of fall protection;

who is capable of performing design, analysis, and evaluation of fall protection systems and equipment.

1.3.6 Recordable Injuries or Illnesses. Any work-related injury or illness that results in:

1.3.6.1 Death, regardless of the time between the injury and death, or the length of the illness;

1.3.6.2 Days away from work (any time lost after day of injury/illness onset);

1.3.6.3 Restricted work;

1.3.6.4 Transfer to another job;

1.3.6.5 Medical treatment greater than first aid;

1.3.6.6 Loss of consciousness; or

1.3.6.7 A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (6) above.

1.3.7 U.S. Army Corps of Engineers (USACE) property and equipment specified in USACE EM 385-

1-1 should be interpreted as Government property and equipment.

1.3.8 Weight Handling Equipment (WHE) Accident. A WHE accident occurs when any one or more of the six elements in the operating envelope fails to perform correctly during operation, including operation during maintenance or testing resulting in personnel injury or death; material or equipment damage; dropped load; derailment; two-blocking; overload; and/or collision, including unplanned contact between the load, crane, and/or other objects. A dropped load, derailment, two-blocking, overload and collision are considered accidents even though no material damage or injury occurs. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) is not considered an accident solely due to material or equipment damage unless the component failure results in damage to other components (e.g., dropped boom, dropped load, roll over, etc.).

1.4 CONTRACTOR SAFETY SELF-EVALUATION CHECKLIST

1.4.1 Contracting Officer will provide a "Contractor Safety Self-Evaluation checklist" to the Contractor at the pre-construction conference. The checklist will be completed monthly by the Contractor and submitted with each request for payment voucher. An acceptable score of 90 or greater is required. Failure to submit the completed safety self-evaluation checklist or achieve a score of at least 90, will result in a retention of up to 10 percent of the voucher.

1.5 REGULATORY REQUIREMENTS

1.5.1 In addition to the detailed requirements included in the provisions of this contract, work performed shall comply with USACE EM 385-1-1, and federal, state, and local, laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this

01 35 29-4 03/24/09 specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements shall apply.

1.6 SITE QUALIFICATIONS, DUTIES AND MEETINGS

1.6.1 Personnel Qualifications

1.6.1.1 Site Safety and Health Officer (SSHO)

a. Site Safety and Health Officer (SSHO) shall be provided at the work site at all times to perform safety and occupational health management, surveillance, inspections, and safety enforcement for the Contractor. The Contractor Quality Control (QC) person can be the SSHO on this project. The SSHO shall meet the following requirements:

(1) Level 2:

(a) A minimum of 3 years safety work on similar project.

(b) 30-hour OSHA construction safety class or equivalent within last 3 years.

(c) Competent person training as needed.

1.6.1.2 Competent Person for Confined Space Entry

a. Provide a competent person for confined space meeting the definition and requirements of EM

385-1-1 if required by the Task Order SOW.

1.6.1.3 Crane Operators

a. Crane operators shall meet the requirements in USACE EM 385-1-1, Section 16 and Appendix

G. In addition, for mobile cranes with Original Equipment Manufacturer (OEM) rated capacitates of 50,000 pounds or greater, crane operators shall be designated as qualified by a source that qualifies crane operators (i.e., union, a government agency, or and organization that tests and qualifies crane operators). Proof of current qualification shall be provided.

1.6.2 Personnel Duties

1.6.2.1 Site Safety and Health Officer (SSHO)/Superintendent

a. Conduct daily safety and health inspections and maintain a written log which includes area/operation inspected, date of inspection, identified hazards, recommended corrective actions, estimated and actual dates of corrections. Safety inspection logs shall be attached to the

Contractors' daily report.

b. Conduct mishap investigations and complete required reports. Maintain the OSHA Form 300 and Daily Production reports for prime and sub-contractors.

c. Maintain applicable safety reference material on the job site.

d. Attend the pre-construction conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings.

e. Implement and enforce accepted Accident Prevention Plan (APPs) and Activity Hazard

Analyses (AHAs).

f. Maintain a safety and health deficiency tracking system that monitors outstanding deficiencies until resolution. A list of unresolved safety and health deficiencies shall be posted on the safety

01 35 29-5 03/24/09 bulletin board.

g. Ensure sub-contractor compliance with safety and health requirements.

1.6.2.2 Failure to perform the above duties will result in dismissal of the superintendent and/or SSHO, and a project work stoppage. The project work stoppage will remain in effect pending approval of a suitable replacement.

1.6.3 Meetings

1.6.3.1 Preconstruction Conference

a. Contractor representatives who have a responsibility or significant role in accident prevention on the project shall attend the preconstruction conference. This includes the project superintendent, site safety and health officer, quality control supervisor, or any other assigned safety and health professionals who participated in the development of the APP (including the

Activity Hazard Analyses (AHAs) and special plans, program and procedures associated with it).

b. The Contractor shall discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHAs that will be developed and implemented during the performance of the contract. This list of proposed AHAs will be reviewed at the conference and an agreement will be reached between the Contractor and the

Contracting Officer's representative as to which phases will require an analysis. In addition, a schedule for the preparation, submittal, review, and acceptance of AHAs shall be established to preclude project delays.

c. Deficiencies in the submitted APP will be brought to the attention of the Contractor at the preconstruction conference, and the Contractor shall revise the plan to correct deficiencies and re-submit it for acceptance. Work shall not begin until there is an accepted APP approved by the Contracting Officer.

d. The functions of a Preconstruction conference may take place at the Post-Award Kickoff meeting for Design Build Contracts.

1.6.3.2 Safety Meetings

a. Shall be conducted and documented as required by EM 385-1-1. Minutes showing contract title, signatures of attendees and a list of topics discussed shall be attached to the Contractors' daily report.

1.7 ACCIDENT PREVENTION PLAN (APP)

1.7.1 The Contractor shall use a qualified person to prepare the written site-specific APP. Prepare the

APP in accordance with the format and requirements of USACE EM 385-1-1 and as supplemented herein. Cover all paragraph and subparagraph elements in USACE EM 385-1-1, Appendix A, "Minimum Basic Outline for Accident Prevention Plan". Specific requirements for some of the APP elements are described below. The APP shall be job-specific and shall address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor's overall safety and health program. Any portions of the

Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors.

Contractors are responsible for informing their subcontractors of the safety provisions under the

01 35 29-6 03/24/09 terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The APP shall be signed by the person and firm (senior person) preparing the APP, the Contractor, the on-site superintendent, the designated site safety and health officer and any designated CSP and/or CIH.

1.7.1.1 Submit the APP to the Contracting Officer 15 calendar days prior to the date of the preconstruction conference for acceptance. Work cannot proceed without an accepted APP.

1.7.1.2 Once accepted by the Contracting Officer, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified.

1.7.1.3 Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the Contracting Officer, project superintendent, SSHO and quality control manager. Should any hazard become evident, stop work in the area, secure the area, and develop a plan to remove the hazard. Notify the Contracting Officer within 24 hours of discovery. Eliminate/remove the hazard. In the interim, all necessary action shall be taken to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public (as defined by ASSE A10.34,) and the environment.

1.7.1.4 Copies of the accepted plan will be maintained at the Contracting Officer's office and at the job site.

1.7.1.5 The APP shall be continuously reviewed and amended, as necessary, throughout the life of the contract. Unusual or high-hazard activities not identified in the original APP shall be incorporated in the plan as they are discovered.

1.7.2 EM 385-1-1 Contents

1.7.2.1 In addition to the requirements outlines in Appendix A of USACE EM 385-1-1, the following is required:

a. Names and qualifications (resumes including education, training, experience and certifications) of all site safety and health personnel designated to perform work on this project to include the designated site safety and health officer and other competent and qualified personnel to be used such as CSPs, CIHs, STSs, CHSTs. The duties of each position shall be specified.

b. Qualifications of competent and of qualified persons. As a minimum, competent persons shall be designated and qualifications submitted for each of the following major areas: excavation;

scaffolding; fall protection; hazardous energy; confined space; health hazard recognition, evaluation and control of chemical, physical and biological agents; personal protective equipment and clothing to include selection, use and maintenance.

c. Confined Space Entry Plan. Develop a confined space entry plan in accordance with USACE

EM 385-1-1, applicable OSHA standards 29 CFR 1910, 29 CFR 1915, and 29 CFR 1926, and any other federal, state and local regulatory requirements identified in this contract if there is confined space work on the project. Identify the qualified person's name and qualifications, training, and experience. Delineate the qualified person's authority to direct work stoppage in the event of hazardous conditions. Include procedure for rescue by contractor personnel and the coordination with emergency responders.

01 35 29-7 03/24/09

d. Crane Critical Lift Plan. Prepare and sign weight handling critical lift plans for lifts over 75 percent of the capacity of the crane or hoist at any radius of lift; lifts involving more than one crane or hoist; lifts of personnel; and lifts involving non-routine rigging or operation, sensitive equipment, or unusual safety risks. The plan shall be submitted 15 calendar days prior to on-site work and include the requirements of USACE EM 385-1-1, paragraph 16.C.18. and the following:

(1) For lifts of personnel, the plan shall demonstrate compliance with the requirements of 29

CFR 1926.550(g).

e. Fall Protection and Prevention (FP&P) Plan. The plan shall be site specific and address all fall hazards in the work place and during different phases of construction. It shall address how to protect and prevent workers from falling to lower levels when they are exposed to fall hazards above 6 feet. A qualified person for fall protection shall prepare and sign the plan. The plan shall include fall protection and prevention systems, equipment and methods employed for every phase of work, responsibilities, assisted rescue, self-rescue and evacuation procedures, training requirements, and monitoring methods. Fall Protection and Prevention Plan shall be revised for lengthy projects, reflecting any changes during the course of construction due to changes in personnel, equipment, systems or work habits. The accepted Fall Protection and

Prevention Plan shall be kept and maintained at the job site for the duration of the project. The

Fall Protection and Prevention Plan shall be included in the Accident Prevention Plan (APP).

1.8 ACTIVITY HAZARD ANALYSIS (AHA)

1.8.1 The Activity Hazard Analysis (AHA) format shall be in accordance with USACE EM 385-1-1.

Submit the AHA for review at least 15 calendar days prior to the start of each phase. Format subsequent AHAs as amendments to the APP. The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls.

1.8.2 The AHA list will be reviewed periodically (at least monthly) at the Contractor supervisory safety meeting and updated as necessary when procedures, scheduling, or hazards change.

1.8.3 The activity hazard analyses shall be developed using the project schedule as the basis for the activities performed. Any activities listed on the project schedule will require an AHA. The

AHAs will be developed by the contractor, supplier or subcontractor and provided to the prime contractor for submittal to the Contracting Officer for acceptance.

1.9 DISPLAY OF SAFETY INFORMATION

1.9.1 Within 1calendar days after commencement of work, erect a safety bulletin board at the job site.

The safety bulletin board shall include information and be maintained as required by EM 385-1-1, section 01.A.06. Additional items required to be posted include:

1.9.1.1 Confined space entry permit.

1.9.1.2 Hot work permit.

1.10 SITE SAFETY REFERENCE MATERIALS

1.10.1 Maintain safety-related references applicable to the project, including those listed in the article

01 35 29-8 03/24/09

"References." Maintain applicable equipment manufacturer's manuals.

1.11 EMERGENCY MEDICAL TREATMENT

1.11.1 Call 911 for emergency medical, police, or fire.

1.12 REPORTS

1.12.1 Accident Reports

1.12.1.1 For recordable injuries and illnesses, and property damage accidents resulting in at least $2,000 in damages, the Prime Contractor shall conduct an accident investigation to establish the root cause(s) of the accident, complete the Navy Contractor Significant Incident Report (CSIR) form USACE Accident Report Form 3394 and provide the report to the Contracting Officer within 5 calendar day(s) of the accident. The Contracting Officer will provide copies of any required or special forms.

1.12.2 Accident Notification

1.12.2.1 Notify the Contracting Officer as soon as practical, but not later than four hours, after any accident meeting the definition of Recordable Injuries or Illnesses or High Visibility Accidents, property damage equal to or greater than $2,000, or any weight handling equipment accident.

Information shall include contractor name; contract title; type of contract; name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (to include type of construction equipment used, PPE used, etc.). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted. Contracting Office will notify the installation Safety Office within four hours of accidents that involve serious injuries or death.

1.12.3 Monthly Exposure Reports

1.12.3.1 Monthly exposure reporting to the Contracting Officer is required to be attached to the monthly billing request. This report is a compilation of employee-hours worked each month for all site workers, both prime and subcontractor. The Contracting Officer will provide copies of any special forms.

1.12.4 Crane Reports

1.12.4.1 Submit crane inspection reports required in accordance with USACE EM 385-1-1, Appendix H and as specified herein with Daily Reports of Inspections.

1.12.5 Certificate of Compliance

1.12.5.1 The Contractor shall provide a Certificate of Compliance for each crane entering an activity under this contract (see Contracting Officer for a blank certificate). Certificate shall state that the crane and rigging gear meet applicable OSHA regulations (with the Contractor citing which

OSHA regulations are applicable, e.g., cranes used in construction, demolition, or maintenance shall comply with 29 CFR 1926 and USACE EM 385-1-1 section 16 and Appendix H. Certify

01 35 29-9 03/24/09 on the Certificate of Compliance that the crane operator(s) is qualified and trained in the operation of the crane to be used. The Contractor shall also certify that all of its crane operators working on the Department of Defense (DoD) activity have been trained in the proper use of all safety devices (e.g., anti-two block devices). These certifications shall be posted on the crane.

1.13 HOT WORK

1.13.1 Prior to performing "Hot Work" (welding, cutting, etc.) or operating other flame-producing/spark producing devices, a written permit shall be requested from the Fire Division. CONTRACTORS

ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS ISSUED. The

Contractor will provide at least two (2) twenty (20) pound 4A:20 BC rated extinguishers for normal "Hot Work". All extinguishers shall be current inspection tagged, approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "Hot

Work" done at this activity. The Fire Watch shall be trained in accordance with NFPA 51B and remain on-site for a minimum of 30 minutes after completion of the task or as specified on the hot work permit.

1.13.2 When starting work in the facility, Contractors shall require their personnel to familiarize themselves with the location of the nearest fire alarm boxes and place in memory the emergency

Fire Division phone number. ANY FIRE, NO MATTER HOW SMALL, SHALL BE

REPORTED TO THE RESPONSIBLE FIRE DIVISION IMMEDIATELY.

1.13.3 Contact Fire Department at 556-7774/4242/6574 for welding permit at least 24 hours prior to work.

PART 2 PRODUCTS

2.1 CONFINED SPACE SIGNAGE

2.1.1 The Contractor shall provide permanent signs integral to or securely attached to access covers for new permit-required confined spaces. Signs wording: "DANGER--PERMIT-REQUIRED

CONFINED SPACE - DO NOT ENTER -" in bold letters a minimum of one inch in height and constructed to be clearly legible with all paint removed. The signal word "DANGER" shall be red and readable from 5 feet.

2.2 FALL PROTECTION ANCHORAGE

2.2.1 Fall protection anchorage, conforming to ASSE Z359.1, installed under the supervision of a qualified person in fall protection, shall be left in place for continued customer use and so identified by signage stating the capacity of the anchorage (strength and number of persons who may be tied-off to it at any one time).

PART 3 EXECUTION

3.1 CONSTRUCTION AND/OR OTHER WORK

3.1.1 The Contractor shall comply with USACE EM 385-1-1, NFPA 241, the APP, the AHA, Federal and/or State OSHA regulations, and other related submittals and activity fire and safety

01 35 29-10 03/24/09 regulations. The most stringent standard shall prevail.

3.1.1.1 Hazardous Material Use

a. Each hazardous material must receive approval prior to being brought onto the job site or prior to any other use in connection with this contract. Allow a minimum of 10 working days for processing of the request for use of a hazardous material.

3.1.1.2 Hazardous Material Exclusions

a. Notwithstanding any other hazardous material used in this contract, radioactive materials or instruments capable of producing ionizing/non-ionizing radiation (with the exception of radioactive material and devices used in accordance with USACE EM 385-1-1 such as nuclear density meters for compaction testing and laboratory equipment with radioactive sources) as well as materials which contain asbestos, mercury or polychlorinated biphenyls, di-isocynates, lead-based paint are prohibited. The Contracting Officer, upon written request by the

Contractor, may consider exceptions to the use of any of the above excluded materials.

3.1.1.3 Unforeseen Hazardous Material

a. The design should have identified materials such as PCB, lead paint, and friable and non-friable asbestos. If additional material, not indicated, that may be hazardous to human health upon disturbance during construction operations is encountered, stop that portion of work and notify the Contracting Officer immediately. Within 14 calendar days the Government will determine if the material is hazardous. If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a modification pursuant to "FAR 52.243-4, Changes" and "FAR 52.236-2, Differing Site Conditions."

3.2 PRE-OUTAGE COORDINATION MEETING

3.2.1 Contractors are required to apply for utility outages at least 15 days in advance. As a minimum, the request should include the location of the outage, utilities being affected, duration of outage and any necessary sketches. Special requirements for electrical outage requests are contained elsewhere in this specification section. Once approved, and prior to beginning work on the utility system requiring shut down, the Contractor shall attend a pre-outage coordination meeting with the Contracting Officer to review the scope of work and the lock-out/tag-out procedures for worker protection. No work will be performed on energized electrical circuits unless proof is provided that no other means exist.

3.3 FALL HAZARD PROTECTION AND PREVENTION PROGRAM

3.3.1 The Contractor shall establish a fall protection and prevention program, for the protection of all employees exposed to fall hazards. The program shall include company policy; identify responsibilities, education and training requirements, fall hazard identification, prevention and control measures, inspection, storage, care and maintenance of fall protection equipment and rescue and evacuation procedures.

3.3.1.1 Training

a. The Contractor shall institute a fall protection training program. As part of the Fall Hazard

Protection and Prevention Program, the Contractor shall provide training for each employee

01 35 29-11 03/24/09 who might be exposed to fall hazards. A competent person for fall protection shall provide the training. Training requirements shall be in accordance with USACE EM 385-1-1, section

21.A.16.

3.3.1.2 Fall Protection Equipment and Systems

a. The Contractor shall enforce use of the fall protection equipment and systems designated for each specific work activity in the Fall Protection and Prevention Plan and/or AHA at all times when an employee is exposed to a fall hazard. Employees shall be protected from fall hazards as specified in EM 385-1-1, section 21. In addition to the required fall protection systems, safety skiff, personal floatation devices, life rings etc., are required when working above or next to water in accordance with USACE EM 385-1-1, paragraphs 05.H. and 05.I. Personal fall arrest systems are required when working from an articulating or extendible boom, swing stages, or suspended platform. In addition, personal fall arrest systems are required when operating other equipment such as scissor lifts if the work platform is capable of being positioned outside the wheelbase. The need for tying-off in such equipment is to prevent ejection of the employee from the equipment during raising, lowering, or travel. Fall protection must comply with 29 CFR 1926.500, Subpart M, USACE EM 385-1-1 and ASSE A10.32.

(1) Personal Fall Arrest Equipment

(a) Personal fall arrest equipment, systems, subsystems, and components shall meet ASSE

Z359.1. Only a full-body harness with a shock-absorbing lanyard or self-retracting lanyard is an acceptable personal fall arrest body support device. Body belts may only be used as a positioning device system (for uses such as steel reinforcing assembly and in addition to an approved fall arrest system). Harnesses shall have a fall arrest attachment affixed to the body support (usually a Dorsal D-ring) and specifically designated for attachment to the rest of the system. Only locking snap hooks and carabiners shall be used. Webbing, straps, and ropes shall be made of synthetic fiber.

The maximum free fall distance when using fall arrest equipment shall not exceed 6 feet. The total fall distance and any swinging of the worker (pendulum-like motion) that can occur during a fall shall always be taken into consideration when attaching a person to a fall arrest system.

3.3.1.3 Fall Protection for Roofing Work

a. Fall protection controls shall be implemented based on the type of roof being constructed and work being performed. The roof area to be accessed shall be evaluated for its structural integrity including weight-bearing capabilities for the projected loading.

(1) Low Sloped Roofs:

(a) For work within 6 feet of an edge, on low-slope roofs, personnel shall be protected from falling by use of personal fall arrest systems, guardrails, or safety nets. A safety monitoring system is not adequate fall protection and is not authorized.

(b) For work greater than 6 feet from an edge, warning lines shall be erected and installed in accordance with 29 CFR 1926.500 and USACE EM 385-1-1.

(2) Steep-Sloped Roofs: Work on steep-sloped roofs requires a personal fall arrest system, guardrails with toe-boards, or safety nets. This requirement also includes residential or housing type construction.

3.3.1.4 Existing Anchorage

a. Existing anchorages, to be used for attachment of personal fall arrest equipment, shall be

01 35 29-12 03/24/09 certified (or re-certified) by a qualified person for fall protection in accordance with ASSE

Z359.1. Exiting horizontal lifeline anchorages shall be certified (or re-certified) by a registered professional engineer with experience in designing horizontal lifeline systems.

3.3.1.5 Horizontal Lifelines

a. Horizontal lifelines shall be designed, installed, certified and used under the supervision of a qualified person for fall protection as part of a complete fall arrest system which maintains a safety factor of 2.

3.3.1.6 Guardrails and Safety Nets

a. Guardrails and safety nets shall be designed, installed and used in accordance with EM 385-1-1 and 29 CFR 1926 Subpart M.

3.3.1.7 Rescue and Evacuation Procedures

a. When personal fall arrest systems are used, the contractor must ensure that the mishap victim can self-rescue or can be rescued promptly should a fall occur. A Rescue and Evacuation Plan shall be prepared by the contractor and include a detailed discussion of the following: methods of rescue; methods of self-rescue; equipment used; training requirement; specialized training for the rescuers; procedures for requesting rescue and medical assistance; and transportation routes to a medical facility. The Rescue and Evacuation Plan shall be included in the Activity

Hazard Analysis (AHA) for the phase of work, in the Fall Protection and Prevention (FP&P)

Plan, and the Accident Prevention Plan (APP).

3.4 SCAFFOLDING

3.4.1 Employees shall be provided with a safe means of access to the work area on the scaffold.

Climbing of any scaffold braces or supports not specifically designed for access is prohibited.

Access to scaffold platforms greater than 20 feet in height shall be accessed by use of a scaffold stair system. Vertical ladders commonly provided by scaffold system manufacturers shall not be used for accessing scaffold platforms greater than 20 feet in height. The use of an adequate gate is required. Contractor shall ensure that employees are qualified to perform scaffold erection and dismantling. Do not use scaffold without the capability of supporting at least four times the maximum intended load or without appropriate fall protection as delineated in the accepted fall protection and prevention plan. Stationary scaffolds must be attached to structural building components to safeguard against tipping forward or backward. Special care shall be given to ensure scaffold systems are not overloaded. Side brackets used to extend scaffold platforms on self-supported scaffold systems for the storage of material is prohibited. The first tie-in shall be at the height equal to 4 times the width of the smallest dimension of the scaffold base. Work platforms shall be placed on mud sills. Scaffold or work platform erectors shall have fall protection during the erection and dismantling of scaffolding or work platforms that are more than six feet. Delineate fall protection requirements when working above six feet or above dangerous operations in the Fall Protection and Prevention (FP&P) Plan and Activity Hazard

Analysis (AHA) for the phase of work.

3.5 EQUIPMENT

3.5.1 Material Handling Equipment

01 35 29-13 03/24/09

3.5.1.1 Material handling equipment such as forklifts shall not be modified with work platform attachments for supporting employees unless specifically delineated in the manufacturer's printed operating instructions.

3.5.1.2 The use of hooks on equipment for lifting of material must be in accordance with manufacturer's printed instructions.

3.5.1.3 Operators of forklifts or power industrial trucks shall be licensed in accordance with OSHA.

3.5.2 Weight Handling Equipment

3.5.2.1 Cranes and derricks shall be equipped as specified in EM 385-1-1, section 16.

3.5.2.2 The Contractor shall notify the Contracting Officer 15 days in advance of any cranes entering the activity so that necessary quality assurance spot checks can be coordinated. Prior to cranes entering federal activities, a Crane Access Permit must be obtained from the Contracting

Officer. A copy of the permitting process will be provided at the Preconstruction Conference.

Contractor's operator shall remain with the crane during the spot check.

3.5.2.3 The Contractor shall comply with the crane manufacturer's specifications and limitations for erection and operation of cranes and hoists used in support of the work. Erection shall be performed under the supervision of a designated person (as defined in ASME B30.5). All testing shall be performed in accordance with the manufacturer's recommended procedures.

3.5.2.4 The Contractor shall comply with ASME B30.5 for mobile and locomotive cranes, ASME

B30.22 for articulating boom cranes, and ASME B30.3 for construction tower cranes.

3.5.2.5 Under no circumstance shall a Contractor make a lift at or above 90% of the cranes rated capacity in any configuration.

3.5.2.6 When operating in the vicinity of overhead transmission lines, operators and riggers shall be alert to this special hazard and shall follow the requirements of USACE EM 385-1-1 section 11 and ASME B30.5 or ASME B30.22 as applicable.

3.5.2.7 Crane suspended personnel work platforms (baskets) shall not be used unless the Contractor proves that using any other access to the work location would provide a greater hazard to the workers or is impossible. Personnel shall not be lifted with a line hoist or friction crane.

3.5.2.8 Portable fire extinguishers shall be inspected, maintained, and recharged as specified in NFPA

10, Standard for Portable Fire Extinguishers.

3.5.2.9 All employees shall be kept clear of loads about to be lifted and of suspended loads.

3.5.2.10 The Contractor shall use cribbing when performing lifts on outriggers.

3.5.2.11 The crane hook/block must be positioned directly over the load. Side loading of the crane is prohibited.

3.5.2.12 A physical barricade must be positioned to prevent personnel from entering the counterweight swing (tail swing) area of the crane.

3.5.2.13 Certification records which include the date of inspection, signature of the person performing

01 35 29-14 03/24/09 the inspection, and the serial number or other identifier of the crane that was inspected shall always be available for review by Contracting Officer personnel.

3.5.2.14 Written reports listing the load test procedures used along with any repairs or alterations performed on the crane shall be available for review by Contracting Officer personnel.

3.5.2.15 Certify that all crane operators have been trained in proper use of all safety devices (e.g. anti-two block devices).

3.5.2.16 Take steps to ensure that wind speed does not contribute to loss of control of the load during lifting operations. Prior to conducting lifting operations the contractor shall set a maximum wind speed at which a crane can be safely operated based on the equipment being used, the load being lifted, experience of operators and riggers, and hazards on the work site. This maximum wind speed determination shall be included as part of the activity hazard analysis plan for that operation.

3.5.3 Equipment and Mechanized Equipment

3.5.3.1 Proof of qualifications for operator shall be kept on the project site for review.

3.5.3.2 Manufacture specifications or owner's manual for the equipment shall be on-site and reviewed for additional safety precautions or requirements that are sometimes not identified by OSHA or

USACE EM 385-1-1. Such additional safety precautions or requirements shall be incorporated into the AHAs.

3.6 EXCAVATIONS

3.6.1 The competent person shall perform soil classification in accordance with 29 CFR 1926.

3.6.1.1 Utility Locations

a. Prior to digging, the appropriate digging permit must be obtained. All underground utilities in the work area must be positively identified by a private utility locating service in addition to any station locating service and coordinated with the station utility department. Contractor shall maintain any markings made during the utility investigation throughout the contract.

3.6.1.2 Utility Location Verification

a. The Contractor must physically verify underground utility locations by hand digging using wood or fiberglass handled tools when any adjacent construction work is expected to come within three feet of the underground system. Digging within 2 feet of a known utility must not be performed by means of mechanical equipment; hand digging shall be used. If construction is parallel to an existing utility the utility shall be exposed by hand digging every 100 feet if parallel within 5 feet of the excavation.

3.6.1.3 Shoring Systems

a. Trench and shoring systems must be identified in the accepted safety plan and AHA.

Manufacture tabulated data and specifications or registered engineer tabulated data for shoring or benching systems shall be readily available on-site for review. Job-made shoring or shielding shall have the registered professional engineer stamp, specifications, and tabulated data. Extreme care must be used when excavating near direct burial electric underground

01 35 29-15 03/24/09 cables.

3.6.1.4 Trenching Machinery

a. Trenching machines with digging chain drives shall be operated only when the spotters/laborers are in plain view of the operator. Operator and spotters/laborers shall be provided training on the hazards of the digging chain drives with emphasis on the distance that needs to be maintained when the digging chain is operating. Documentation of the training shall be kept on file at the project site.

3.7 UTILITIES WITHIN CONCRETE SLABS

3.7.1 Utilities located within concrete slabs or pier structures, bridges, and the like, are extremely difficult to identify due to the reinforcing steel used in the construction of these structures.

Whenever contract work involves concrete chipping, saw cutting, or core drilling, the existing utility location must be coordinated with station utility departments in addition to a private locating service. Outages to isolate utility systems shall be used in circumstances where utilities are unable to be positively identified. The use of historical drawings does not alleviate the contractor from meeting this requirement.

3.8 ELECTRICAL

3.8.1 Conduct of Electrical Work

3.8.1.1 Underground electrical spaces must be certified safe for entry before entering to conduct work.

Cables that will be cut must be positively identified and de-energized prior to performing each cut. Positive cable identification must be made prior to submitting any outage request for electrical systems. Arrangements are to be coordinated with the Contracting Officer and

Station Utilities for identification. The Contracting Officer will not accept an outage request until the Contractor satisfactorily documents that the circuits have been clearly identified.

Perform all high voltage cable cutting remotely using hydraulic cutting tool. When racking in or live switching of circuit breakers, no additional person other than the switch operator will be allowed in the space during the actual operation. Plan so that work near energized parts is minimized to the fullest extent possible. Use of electrical outages clear of any energized electrical sources is the preferred method. When working in energized substations, only qualified electrical workers shall be permitted to enter. When work requires Contractor to work near energized circuits as defined by the NFPA 70, high voltage personnel must use personal protective equipment that includes, as a minimum, electrical hard hat, safety shoes, insulating gloves with leather protective sleeves, fire retarding shirts, coveralls, face shields, and safety glasses. In addition, provide electrical arc flash protection for personnel as required by NFPA

70E. Insulating blankets, hearing protection, and switching suits may also be required, depending on the specific job and as delineated in the Contractor's AHA.

3.8.2 Portable Extension Cords

3.8.2.1 Portable extension cords shall be sized in accordance with manufacturer ratings for the tool to be powered and protected from damage. All damaged extension cords shall be immediately removed from service. Portable extension cords shall meet the requirements of NFPA 70.

01 35 29-16 03/24/09

3.9 WORK IN CONFINED SPACES

3.9.1 The Contractor shall comply with the requirements in Section 06.I of USACE EM 385-1-1, OSHA 29 CFR 1910.146, OSHA 29 CFR 1926.21(b)(6), and AFA OSHA AIF’s. Any potential for a hazard in the confined space requires a permit system to be used.

3.9.1.1 Entry Procedures. Prohibit entry into a confined space by personnel for any purpose, including hot work, until the qualified person has conducted appropriate tests to ensure the confined or enclosed space is safe for the work intended and that all potential hazards are controlled or eliminated and documented. (See Section 06.I.06 of USACE EM 385-1-1 for entry procedures.) All hazards pertaining to the space shall be reviewed with each employee during review of the AHA.

3.9.1.2 Forced air ventilation is required for all confined space entry operations and the minimum air exchange requirements must be maintained to ensure exposure to any hazardous atmosphere is kept below its' action level.

3.9.1.3 Sewer wet wells require continuous atmosphere monitoring with audible alarm for toxic gas detection.

PART 4 PRODUCTS – Not Used

PART 5 EXECUTION – Not Used

END OF SECTION 01 35 29