FA NSN 1005010463536.pdf
PDF 93 KB Posted
- Solicitation number
- SPRWA1-25-R-0011
- Issued by
-
Defense Logistics Agency Aviation
About this file
This First Article Requirements document is for the F-16 20MM Transfer Unit (NSN 1005010463536, Part Number 211F603), dated 02 June 2023. The document specifies detailed requirements for first article testing and approval of two units, which will be part of the production quantity. Key testing requirements include 100% government testing involving dimensional inspection, material checks, hardness checks, and non-destructive inspection, as well as 100% contractor testing of master gears, surface roughness, form, fit, and function testing.
The first article must be manufactured at the same facilities intended for production, with a delivery deadline of 270 calendar days from the contract date. The first article exhibits will consist of one uncoated article for government material/process certification and dimensional testing, and one article for contractor first article testing. The document notes this item is undergoing a transition to model-based definition, with 3D solid models requiring validation before full and open competition. The estimated cost of government testing and inspection evaluation is $83,386.00, and the cognizant engineering organization responsible for approving and conducting tests is Rickey C. Moore from 409 SCMS/GUEA.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PKGRQMT_REPORT.pdf | ||
| CDRLs A001-A004.pdf | ||
| TRNSPDATA_REPORT.pdf | ||
| Pricing Matrix_00147_.xlsx | XLSX spreadsheet | |
| Qualification Requirements.pdf | ||
| SPRWA1-25-R-0011.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
02 JUN 2023(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
05606 / 211F603
4. NSN
1005010463536
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 2 UNIT(S) OF LOT / ITEM ea
AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
X REQUIRED NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A. X
X
CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
Performance or other characteristics which the First Articles must meet are
Government: 100% dimensional inspection, material checks, hardness checks, non-destructive inspection.
Contractor: 100% master gears, surface roughness, Form, Fit, Function Test.
B. The detailed technical requirements for First Article approval tests are contained in
Drawing 211F603 and associated drawings and specifications found in dwg number 8525473.
(Cite Spec and Para number)
C. X TEST PLAN REQUIRED
Number of days for government approval / disapproval 45 days.
D. Contractor's notification to ACO and
782cbsg.afat@us.af.mil
(Requesting Activity) of test time and location due 30 days prior to start of testing.
E. X TEST REPORT REQUIRED
(1) Forwarded to
Rickey C. Moore
235 Byron St., Suite 19A
BLDG 300 EW, NORTH END
ROBINS AFB GA 31098-1670
(2) Government written notice of approval / disapproval due 30 days after receipt of contractor's report.
F. FIRST ARTICLE DELIVERY
(1) Due within 270 calendar days from date contract.
(2) Notify 30 calendar days prior to shipment.
(3) Delivered to government at
CODE:FD2060 Special Handling Unit, First Article Test Unit
455 Byron St., Building 376
Robins AFB, GA 31098-1887
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 135 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$83,386.0000
Page 1 of 3AFMC IMT 260, 20020830, V-3 Version 4Generated by PRPS using Jasper Reports on 02 Jun 2023
02 JUN 2023(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
10. DISPOSITION OF FIRST ARTICLES
X Approved First Articles will be forwarded to
Manufacture
(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
X Disapproved First Articles will be returned to the contractor
X will be retained by Robins AFB pending disposition instructions from the contractor.
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
X Other Disposition:
Vendor to supply pre-paid shipping label.
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.
b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.
c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, X Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 36 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. X See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
12. REMARKS
Moore, Rickey CNAME: 02 JUN 2023DATE:
This item is undergoing a transition to model-based definition and the 3D solid models must be validated before full and open competition. This item has been coded Q for the first buy only to validate the 3D models at General Dynamics CAGE 05606.
The 1 uncoated first article shall be delivered to the government for material/process certification and dimensional testing. Contractor shall mark exterior container with 2" Red Lettering as follows: "FIRST ARTICLE". This exhibit will be destroyed during testing. The 2nd exhibit is for the contractor first article testing as described on the contractor first article test plan and includes form, fit, and function testing. If approved, this exhibit will be put in supply. The form, fit, function portion of the testing shall not commense until the contractor has received written notification that the exhibit delivered to the government has passed all tests. The contractor is responsible for testing all requirements in the Contractor Test Plan and FFF memo.
Request vendor provide prepaid shipping label to be used to return conditional approval or failure exhibits. Material Certifications, verification and inspection documentation, and contractor first article documentation are required and will be shipped with the exhibit, in electronic format (preferred). One First Article shall be delivered without the coating. Contract Distribution: One copy of contract and amendments to First Article Manager email to 782cbsg.afat@us.af.mil
The manufacturer shall provide the certified master gears required per all gears drawings on the EDL with the first article exhibits for use in verifying gear data or have a third party certified the verification of the gear data by a test report.
ESA reserves the right to approve ANY test plans/reports for the first articles generated for this contract.
Provide 1 assembled and coated assembly, and 1 unassembled uncoated assembly.
Silver, DeanNAME: 05 AUG 2013DATE:
Contractor is responsible for providing P/N 132D1644 to complete requirements of DWG 209F825 note 50 and 51. Only 1 first article (unassembled and without solid film lubricant) shall be delivered to the government for testing and will be destroyed during testing. The contractor tested part, if not damaged in testing should be included in the production quantity. ESA reserves the right to approve ANY test plan/reports for the first articles generated for this contract.
Page 2 of 3AFMC IMT 260, 20020830, V-3 Version 4Generated by PRPS using Jasper Reports on 02 Jun 2023
02 JUN 2023(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST
(Name, Organization, Phone)
Rickey C. Moore
409 SCMS/GUEA
478-327-2785
497-2785
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Rickey C. Moore
409 SCMS/GUEA
478-327-2785
497-2785