Section C - Descriptions and Specifications
PBSOW
Performance-Based Statement of Work for Boeing DT-III Contract Support of the F/A-18 and EA-18G Project Team as of 01/11/ 2021
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 ABBREVIATIONS AND ACRONYMS
3.0 SCOPE
4.0 APPLICABLE DOCUMENTS
4.1 REFERENCE INSTRUCTIONS…………………………………………
4.2 RECORDS, FORMS, AND REPORTS…………………………………..
5.0 PERFORMANCE REQUIREMENTS
5.1 ENGINEERING SUPPORT……………………………………………
| 5.2 | INSTRUMENTATION SUPPORT………………………………………. |
| 5.3 | MAINTENANCE/MANUFACTURING OF PARTS SUPPORT |
5.4 SPECIAL REQUIREMENTS
6.0 SECURITY
7.0 DATA DELIVERABLES
8.0 STANDARDS OF MEASUREMENT ..
9.0 MINIMUM PERSONAL QUALIFICATIONS
10. PLACE OF PERFORMANCE……………………………………………………..
1.0 INTRODUCTION
The F/A-18A-F and EA-18G including future variants aircraft/systems ground and flight test programs are managed by the F/A-18 Project Team assigned to the VX-23 Squadron located at the NAWCAD, Patuxent River, MD. The Project Team is responsible for all project coordination, execution, and support issues related to the ground and flight test of these aircraft models. Additionally, the Project Team ensures compliance with test Squadron Standard Operating Procedures (SOPs) and of the processes/procedures governing all phases of test projects including development, maintenance, and implementation.
Developmental testing for the F/A-18 aircraft/systems has been ongoing at the NAWCAD, Patuxent River since 1978. These aircraft/systems are designed to perform Strike Fighter and Electronic Attack missions. Developmental test efforts for all F/A-18/ EA-18G and future variants aircraft/systems in support of both the domestic Fleet and programs is expected to continue into the foreseeable future.
The F/A-18 Project Team requires contract support that includes engineering, instrumentation, artisan maintenance, and manufacturing of parts for the uniquely configured non-production models of the F/A-18 & EA-18G aircraft and future variants (domestic/foreign) for ground and flight test programs conducted at the Naval Air Warfare Center Aircraft Division (NAWCAD), Patuxent River, MD. The artisan maintenance and manufacturing support could also be provided for production F/A-18 A-F or EA-18G aircraft in which flight performance capability has been expanded. These efforts will be requested by the VX-23 test squadron and could include Organizational (O), Intermediate (I), and Depot (D) level maintenance support required for the unique test capabilities. As this is an Indefinite Delivery, Indefinite Quantity (IDIQ) contract, all effort described in this Statement of Work will be contracted through the issuance of Task Orders.
2.0 ABBREVIATIONS, ACRONYMS AND DEFINITIONS
| AAE | Aircraft Ancillary Equipment | ||
| A/C | Aircraft | ||
| ACC | Aircraft Controlling Custodian | ||
| ACI | Aircraft Condition Inspection | ||
| ACM | Asbestos Containing Material | ||
| ACO | Administrative Contracting Officer | ||
| ACOR | Assistant Contracting Officer Representative | ||
| ACSP | Aircraft Confined Space Program (formally AVGFE) | ||
| ADB | Aircraft Discrepancy Book | ||
| ADPE | Automatic Data Processing Equipment | ||
| ADR | Aircraft Discrepancy Report | ||
| AEMS | Aircraft Engine Management System | ||
| AESR | Aeronautical Equipment Service Records | ||
| AFC | Airframe Change | ||
| ALSS | Aviation Life Support System | ||
| AMMT | Aviation Maintenance Management Team | ||
| AMMRL | Aircraft Maintenance Material Readiness List | ||
| AMSRR | Aircraft Material Supply Readiness Report | ||
| AOA | Aircraft Operating Account | ||
| AOA | Angle of Attack | ||
| APML | Assistant Program Manager, Logistics | ||
| APT | Aviation Program Team | ||
| ASLL | Authorized Stock Level List | ||
| AUL | Authorized Use List | ||
| AWM | Awaiting Maintenance | ||
| AWP | Awaiting Parts | ||
| BASH | Bird Animal Strike Hazard | ||
| BCM | Beyond Capable Maintenance | ||
| BER | Beyond Economic Repair | ||
| BPR | Beyond Physical Repair | ||
| BUNO | Bureau Number | ||
| CAD | Cartridge Actuated Device | ||
| CBA | Collective Bargaining Agreement | ||
| CDI | Collateral Duty Inspector | ||
| CDQAR | Collateral Duty Quality Assurance Representative | ||
| CDRL | Contract Data Requirements List | ||
| CFA | Cognizant Field Activity | ||
| CFE | Contractor Furnished Equipment | ||
| C.F.R. | Code of Federal Regulations | ||
| CFP | Contractor Furnished Property | ||
| CHRIMP | Consolidated Hazardous Material Reutilization and Inventory Management Program | ||
| CNATT | Chief for Naval Aviation Technical Training | ||
| CNAF | Commander Naval Air Forces | ||
| CNET | Chief of Naval Education and Training | ||
| COR | Contracting Officer's Representative | ||
| CQ | Carrier Qualification | ||
| CPI | Continuous Process Improvement | ||
| CTPL | Central Technical Publications Library | ||
| D- Level | Depot Level Maintenance | ||
| DASR | Daily Aircraft Status Report | ||
| DET | Detachment | ||
| DFS | Daily Flight Schedule | ||
| DLSC | Defense Logistics Service Center | ||
| DMO | Deputy Maintenance Officer | ||
| DOD | Department of Defense | ||
| DOL | Department of Labor | ||
| DON | Department of the Navy | ||
| DOT | Department of Transportation | ||
| DRMO | Defense Reutilization Management Office | ||
| DTPL | Dispersed Technical Publication Library | ||
| ECAMS | Enhanced Comprehensive Asset Management System | ||
| EI | Engineering Investigation | ||
| EIS | Equipment in Service | ||
| EMD | Engineering and Manufacturing Development | ||
| EMS | Environmental Management System | ||
| EOAC | Engine Oil Analysis Coordinator | ||
| EPA | Environmental Protection Agency | ||
| EPCRA | Emergency Planning Community Right-to-Know | ||
| ESD | Electro Static Discharge | ||
| ETR | Engine Transaction Report | ||
| FAME | F-18 Automated Maintenance Environment | ||
| FAR | Federal Acquisition Regulation | ||
| FCF | Functional Check Flight | ||
| FIST | Flight Information Scheduling & Tracking | ||
| FRC | Fleet Readiness Center | ||
| FMS | Foreign Military Sales | ||
| FOD | Foreign Object Damage | ||
| FSS | Federal Supply System | ||
| FST | Fleet Service Team | ||
| GFE | Government Furnished Equipment | ||
| GFP | Government Furnished Property | ||
| GFR | Government Flight Representative | ||
| GGFR | Ground Government Flight Representative | ||
| GOP | Ground Operating Procedures | ||
| GQAR | Government Quality Assurance Representative | ||
| HAZCOM | Hazardous Communication | ||
| HUREVAC | Hurricane Evacuation | ||
| HAZMAT | Hazardous Material | ||
| I-Level | Intermediate Level | ||
| IAW | In Accordance With | ||
| ICRL | Individual Component Repair List | ||
| IETM | Interactive Electronic Technical Manual | ||
| IMRL | Individual Material Readiness List | ||
| JDRS | Joint Deficiency Reporting System | ||
| JON | Job Order Number | ||
| KO | Contracting Officer | ||
| LOX | Liquid Oxygen | ||
| LTD | Long Term Down | ||
| MAF | Maintenance Action Form | ||
| MCA | Mission Capable Aircraft | ||
| MED | Maintenance Engineering Directive | ||
| MESM | Mission Essential Sub-system Matrix | ||
| MO | Maintenance Officer | ||
| MMCO | Maintenance Material Control Officer | ||
| MMP | Monthly Maintenance Plan | ||
| MRC | Maintenance Requirement Card | ||
| MSDS | Material Safety Data Sheets | ||
| NADEP | Naval Air Depot | ||
| NALCOMIS | Naval Aviation Logistics Command Management Information System | ||
| NAMDRP | Naval Aviation Maintenance Discrepancy Reporting Program | ||
| NAMP | Naval Aviation Maintenance Program | ||
| NAS | Naval Air Station | ||
| NATOPS | Naval Air Training and Operating Procedures Standardization | ||
| NAVAIR | Naval Air Systems Command | ||
| NAVICP | Navy Inventory Control Point | ||
| NAVSUP | Naval Supply (Systems Command) | ||
| NAWCAD | Naval Air Warfare Center Aircraft Division | ||
| NDI | Non-destructive Inspection | ||
| NGJ | Next Generation Jammer | ||
| NMCI | Navy-Marine Corps Internet | ||
| NMCM | Not Mission Capable, Maintenance | ||
| NMCS | Not Mission Capable Supply | ||
| NOAP | Navy Oil Analysis Program | ||
| NOSSA | Naval Ordnance Safety and Security Activity | ||
| NPDES | National Pollution Discharge Elimination System | ||
| NSN | National Stock Number | ||
| NTWL | Naval Test Wing Atlantic | ||
| O-Level | Organizational Level | ||
| OEM | Original Equipment Manufacturer | ||
| OIC | Officer in Charge | ||
| OJT | On-the-Job Training | ||
| OM&N | Operational Maintenance, Navy | ||
| OIMA | Optimized Intermediate Maintenance Activity | ||
| OOMA | Optimized Organizational Maintenance Activity | ||
| ORM | Operational Risk Management | ||
| OSGR | On-Site Government Representative | ||
| OSHA | Occupational Safety and Health Administration | ||
| P&E | Planning and Estimate | ||
| PADS | Propulsion Actuated Devices | ||
| PCO | Procuring Contracting Officer | ||
| PMA | Program Manager, Air | ||
| PMC | Partial Mission Capable | ||
| PMCM | Partial Mission Capable Maintenance | ||
| PMCS | Partial Mission Capable Supply | ||
| PMS | Periodic Maintenance Schedule | ||
| PN | Part Number | ||
| PO | Project Officer | ||
| POA&M | Plan of Action and Milestones | ||
| POC | Point of Contact | ||
| PPE | Personal Protective Equipment | ||
| PQS | Personnel Qualification Standard | ||
| PSE | Peculiar Support Equipment | ||
| PW | Public Works | ||
| PBSOW | Performance Based Work Statement | ||
| QA | Quality Assurance | ||
| QAR | Quality Assurance Representative | ||
| QASP | Quality Assurance Surveillance Plan | ||
| QDR | Quality Deficiency Report | ||
| RDT&E | Research, Development, Test and Evaluation | ||
| RFI | Ready for Issue | ||
| ROR | Repair or Replacement | ||
| SAME | Similar to Automated Maintenance Environment | ||
| SDD | System Development and Demonstration | ||
| SE | Support Equipment | ||
| SECA | Support Equipment Controlling Authority | ||
| SCIR | Subsystem Capability Impact Reporting | ||
| SM&R | Source, Maintenance, and Recoverability | ||
| TA | Trusted Agent | ||
| TASS | Trusted Agent Sponsorship System | ||
| TAT | Turn-Around-Time | ||
| TD | Technical Directive | ||
| TEC | Type Equipment Code | ||
| TFOA | Things Falling Off Aircraft | ||
| T/M/S | Type/Model/Series | ||
| TOC | Total Ownership Cost | ||
| TPDR | Technical Publication Deficiency Report | ||
| TSN | Time Since New | ||
| TSO | Time Since Overhaul | ||
| TYCOM | Type Commander | ||
| UIC | Unique Identification Code | ||
| USN | United States Navy | ||
| VIDS/MAF | Visual Information Display System/Maintenance Action Form | ||
| VOCs | Volatile Organic Compounds |
3.0 Applicable Documents
When applicable to the airframe, the Contractor shall adhere to the following documents in accordance with the Performance Requirements of this performance-based SOW. Due to frequent changes to Documents and Directives, it is expected that the most current version will be used.
| DOCUMENT TYPE |
| No.Version |
| TITLE |
| SECNAV Instructions |
| 5239.3C |
| Department of the Navy Cybersecurity Policy |
| 5510.36B |
| Department of the Navy Information Security Program |
| 5510.30C |
| Department of the Navy Personnel Security Program |
| OPNAV Instructions |
| 3710.7V |
| NATOPS Program |
| 3750.6S |
| Naval Aviation Safety Management System |
| 4731.2 |
| Joint Oil Analysis Program |
| 5090.1E |
| Environmental Readiness Program |
| 5100.19F |
| Navy Safety and Occupational Health Program Manual for Forces Afloat |
| 5102.1D CH-2 |
| Navy and Marine Corps Mishap Investigation, Reporting, and Record Keeping |
| 5239.1D |
| U.S. Navy Cybersecurity Program |
| 5530.13C |
| Department of the Navy Physical Security Instruction for Conventional Arms, Ammunition, and Explosives (AA&E) |
| 8000.16E |
| Naval Ordonnance Management Policy |
| 8023.24C |
| Navy Personnel Conventional Ammunition and Explosive Handling Qualification and Certification Program |
| 5009.1 |
| Responsibility for Navy Housing and Lodging Programs |
| 5100.23G CH-1 |
| Navy Safety and Occupational Health Program Manual |
| 13700.2A |
| Propulsion, Engine and Engine Module Readiness |
| 3440.17A |
| Navy Installation Emergency Management Program |
| CNAF Instruction | |
| 4790.2C 2D CH-1 | Comment by Thompson, John T (Ted) CIV USN AIRTEVRON TWO THREE (USA): Current NAMP is 4790.2D |
| Naval Aviation Maintenance Program (NAMP) |
| NAVAIR Instructions |
| 3710.1(series) |
| Contractor's Flight and Ground Procedures |
| 3750.5D CH-1 |
| Aviation Safety Management Program |
| 5090.3A |
| Environmental Planning for Naval Air Systems Command Actions |
| 13100.17 |
| Red Stripe Memorandum System |
| 13023.1A |
| NAVAIRSYSCOM Workload Standards Required for the Aircraft and Engine |
| 13023.3 |
| Establishment of Procedures for Depot Planner & Estimator |
| 13034.1F |
| Airworthiness and Cybersecurity Safety Policies for Air Vehicles and Aircraft Systems |
| 13070.1E |
| NAVAIR Nondestructive Test and Inspection Program |
| 13120.1D |
| Fixed Wing Aircraft Structural Life Limits |
| 13130.1C |
| Rotary Wing Aircraft Structural Life Limits |
| 13280.1B |
| Battery Standardization Program |
| 13640.1C |
| Naval Aviation Metrology Calibration Program |
| 13650.1D |
| Aircraft Maintenance Material Readiness List (AMMRL) |
| 13680.1E |
| Depot Level Rework Program for SE End Items |
| 13700.15G CH-1 |
| Decision Knowledge Programming for Logistics Analysis and Technical Evaluation Engine/Propulsion System Module Management |
| 13920.1K |
| Procedures for Submittal of Flight Loads, Launch, and Landing Data for the Structural Appraisal of Fatigue Effects Program |
| NAWCAD Instructions |
| 3120.1A |
| Shipboard and Off-Site Shore Based Aircraft Test Operations |
| 5510.1B |
| Naval Air Warfare Center Aircraft Division Personnel, Information, and Industrial Security Program Manual |
| NAVTESTWINGLANT Instructions |
| 3140.1B |
| Disaster Response an Destructive Weather/Aircraft Evacuation Plan |
| 8023.1L |
| Explosives Handling Personnel Qualifications and Certification Training Plan |
| NAS Patuxent River Instructions |
| 5090.5A |
| Regulated Waste Management Plan Implementation Order |
| NAVCRANECEN Instruction |
| 11450.1A |
| Acquisition of Navy Shore Based Weight Handling Equipment |
| NAVSEA Instructions |
| OP-5 |
| Ammunition and Explosives Ashore |
| 8020.6E |
| Navy Weapons System Safety Program |
| NAVSEA Manual |
| S0420-AA-RAD-010 Rev 2 |
| Radiological Affairs Support Program Manual |
| NAVSUP Instructions |
| 4200.85D |
| DON Simplified Acquisition Procedures |
| P-409 |
| MILSTRIP/MILSTRAP Desk Guide |
| P-437 |
| Military Standard Transaction Reporting and Accounting |
| P-485 Volumes |
| Navy Supply Procedures |
| P-505 |
| Preparation of Hazardous Material for Military Air Shipment |
| P-805 |
| NAVSUP Ammunition Sentencing Publication |
| DOD Regulations |
| 7000-14R |
| DOD Financial Management Regulation |
| DOD Manual |
| 4161.2-M |
| DOD Manual for the Performance of Contract Property Administration |
| 4500.36-R |
| Management, Acquisition, and Use of Motor Vehicles |
| 5200.01 |
| DoD Information Security Program: Controlled Unclassified Information (CUI) Vol. 4, 9 Sept 2018 |
| 5200.2-R |
| Personnel Security Program |
| 5400.07 |
| Freedom of Information Act (FOIA) Program, 25 Jan 2017 |
| DOD Instruction |
| 8500.01 |
| Cybersecurity |
| 5230.24 |
| Distribution Statements on Technical Documents, Change 3, 15 Oct 2018 |
| 4715.1E |
| Environment, Safety, and Occupational Health (ESOH) |
| National Aerospace Standard |
| 410 |
| Nondestructive Testing Personnel Qualification and Certification |
| NAVAIR Manuals |
| 00-25-100 |
| NAVAIRSYSCOM Technical Publications Library Management Program |
| 00-25-300 |
| Management and Procedures Manual NAVAIRSYSCOM Technical Directives System |
| 00-80T-103 |
| NATOPS Conventional Weapons Handling Procedures Manual (Ashore) |
| 00-80T-105 |
| CV NATOPS Manual |
| 00-80T-106 |
| LHA/LHD NATOPS Manual |
| 00-80T-109 |
| Aircraft Refueling NATOPS Manual |
| 00-80T-120 |
| CVN Flight/Hangar Deck NATOPS Manual |
| 01-1A-17 |
| Organizational, Intermediate and Depot Maintenance Aviation Hydraulics Manual |
| 01-1A-35 |
| Maintenance Instructions Organizational, Intermediate, and Depot Aircraft Fuel Cells and Tanks |
| 01-1A-509 |
| Aircraft Weapons Systems Cleaning and Corrosion Control |
| 01-1A-509-1 |
| Cleaning and Corrosion Control, Volume I, Corrosion Program and Corrosion Theory |
| 01-1A-509-2 |
| Cleaning and Corrosion Control Volume II Aircraft |
| 01-1A-509-3 |
| Organizational, Intermediate and Depot Level Maintenance Cleaning and Corrosion Control Volume III Avionics and Electronics |
| 01-1A-509-4 |
| Cleaning and Corrosion Control Volume IV Consumable Materials and Equipment for Aircraft and Avionics |
| 01-1B-50 |
| Joint Service Technical Manual Organizational, Intermediate and Depot Maintenance Aircraft Weight and Balance |
| 04-10-506 |
| Inspection, Maintenance, Repair, Storage and Disposition Instructions Organizational, Intermediate and Depot Maintenance Aircraft Tires and Tubes |
| 00-80T-113 |
| Aircraft Signals NATOPS Manual |
| 11-140-25 |
| Armament Weapons Support Equipment (AWSE) Configuration Manual Organizational and Intermediate Maintenance Activities |
| 13-1-6 Series |
| ALSS Equipment Publications |
15-01-500 15-01-500 Cont.
Organizational, Intermediate and Depot Maintenance Preservations of Naval Aircraft
| 17-1-123 |
| Operation and Maintenance Instructions with Illustrated Parts Breakdown Organizational and Intermediate Level Tire Inflator Assembly Kit Part Number M85352/1 Dual Chuck Stem Gage Part Number M85352/4 |
| 17-1-125 |
| Maintenance Instructions Organizational and Intermediate Level Support Equipment Cleaning, Preservation and Corrosion Control |
| 70 |
| National Electrical Code |
| NFPA Manual |
| 407 |
| Standard for Aircraft Fuel Servicing |
| 409 |
| Standard on Aircraft Hangars |
| 410 |
| Standard on Aircraft Maintenance |
| Handbooks |
| MIL-HDBK-844 |
| Aircraft Refueling Handbook for Navy/Marine Corps Aircraft |
| SW020-AF-HBK-010 |
| Motor Vehicle Driver and Shipping Inspector’s Manual for Ammunition, Explosives, and Related Hazardous Materials |
| Federal Regulations |
| CFR |
| Code of Federal Regulations |
Note: This list is not meant to be exhaustive or inclusive of all guidance that may be required, referenced, or otherwise identified in the Task Order.
3.0 SCOPE
The majority of work performed under this contract will be provided in direct support of unique non-production F/A-18 A-F and EA-18G flight test assets. The scope includes engineering, instrumentation, and maintaining F/A-18 A-F and EA-18G aircraft along with required laboratories, machine/metal shops, tooling, tool cribs, aircraft parts/aircraft ancillary equipment (AAE)/support equipment (SE), and personnel to support the project requirements. The unique artisan support will be provided for current F/A-18 ground and flight test programs such as the Next Generation Jammer (NGJ), Conformal Fuel Tanks (CFT), Growler Block Two, and other emergent requirement programs including but not limited to, Electromagnetic Air Launch System (EMALS) upgrades, Super Blues support, Sniper Pod. This support could also be provided for future emergent programs.
Scope of the contract will also include support/artisan work for USN production F/A-18A-F & EA-18G aircraft and modifications that will require test and evaluation support associated with expanding flight performance capabilities. The VX-23 department will determine which unique production aircraft or unique modifications will be supported by Boeing. The production aircraft may require Organizational, Intermediate, or Depot Level maintenance. In addition, the production aircraft may require the installation of instrumentation unique to test items. This support will be provided to the government on a 1 to 2-shift operation and include the following specific items: technical engineering and aircraft instrumentation support; scheduled/unscheduled aircraft maintenance; parts manufacturing and fabrication support; aircraft systems support; aircrew support; laboratory support; material handling support and hazardous material program; documentation support; inventory control; quality assurance; and facilities support. Additionally, the scope includes engineering and maintenance support as required for NADEP Integrated Maintenance Concept (IMC) Periodic Maintenance Inspections (PMI-2) level efforts at NAWCAD, Patuxent River for NAVAIR assigned F/A-18 and future variants aircraft.
The scope of the contract may include the performance of maintenance, as required, for one to two F/A-18E/F EMD and F/A-18 / EA18G test aircraft in flying status and/or flyable storage and also provide support for USN maintained production F/A-18A-F & EA-18G as directed by VX-23. In addition, Contractor support includes supporting the tactical static display aircraft as required. The Contractor shall provide engineering and maintenance support as required for Technical Directive (TD) installation / compliance. This effort will be required by VX-23 and the NAVAIR Aircraft Controlling Custodian (ACC) at NAWCAD, Patuxent River for NAVAIR assigned F/A-18/ EA-18G and future variants aircraft.
The Contractor shall meet the IMC planned schedule according to NAVAIR ACC requirements. In support of the IMC effort, the Contractor shall also provide engineering and maintenance support as required for Technical Directive (TD) installation/compliance. The Contractor shall also support Off-site engineering and technical support (system studies, data reduction/analysis, reports, simulations, instrumentation, etc.) as requested by VX-23. The Contractor is required to support possible Off-site repair of aircraft (diverted to/from VX-23). This Off-site repair will be requested by VX-23. The Contractor shall also support F/A-18A-F & EA-18G Foreign Military Sales (FMS) test programs at VX-23.
4.0 APPLICABLE DOCUMENTS
When applicable to the airframe, the Contractor shall adhere to the following documents in accordance with the Performance Requirements of this performance-based SOW. Due to frequent changes to Documents and Directives, it is expected that the most current version will be used.
4.1 Reference Instructions
4.2 Records, Forms, and Reports
4.2.1 The Contractor shall initiate and maintain the following records and forms. Records and forms maintained by the Contractor in support of this contract are Government property and shall be turned over to the Government at the end of this contract. In addition, the Contractor shall maintain NALCOMIS LOG-SET electronic logbooks and associated aeronautical equipment IAW CNAFINST 4790.2 and maintain paper logbooks as a backup. Log reports to execute maintenance services are listed below and in Table A at 4.2.10 below.
4.2.2 Pre-Flight Acceptance and Personnel Record OPNAV FORM 4790/141. The Contractor shall complete the "Safe for Flight" certification portion of the form IAW CNAFINST 4790.2 . The pilot will indicate acceptance or rejection of the aircraft in its present condition and (on the reverse) list all personnel aboard. This form shall be retained in the ADB for 10 flights.
4.2.3 Visual Information Display System/Maintenance Action Form (VIDS/MAF) OPNAV 4790/60 (used for detachment maintenance or as a contingency plan). In all cases, the Contractor shall complete VIDS/MAFs and load the back-up information into NALCOMIS OOMA.
4.2.4 Equipment Master Roster (E-00) Accounting: The E-00 shall be kept up-to-date by Contractor maintenance control to reflect the current aircraft inventory and status on a day-to-day basis during the reporting period IAW CNAFINST 4790.2. A copy of the E-00 shall be forwarded to the appropriate OSGR following the reporting period for review and accuracy of reporting. For sites operating NALCOMIS OOMA, the MAINT 2 report shall be extracted, saved as an HTML document, and sent via email to the appropriate OSGR.
4.2.5 Aircraft Record "A" Card (OPNAV 5442/9 The record "A" card shall be maintained IAW CNAFINST 4790.2 by the Contractor having physical custody of aircraft/logbooks. The "A" card shall be initiated upon receipt of an aircraft, maintained throughout custody and retained for a 12 month period following transfer or strike of the aircraft. A facsimile of the current "A" card shall be included with the aircraft logbook on all transfer or strike evolutions. The Quarterly Aircraft Accounting Audit Report shall be prepared in message format utilizing guidelines of CNAFINST 4790.2.
4.2.6 X-RAY Reporting – Submit an XRAY report to the MO/DMO as XRAY data items change IAW CNAFINST 4790.2.
4.2.7 Logbook/ AESRs - The following forms shall be initiated, completed IAW the applicable instructions, maintained by the Contractor and made available to the Government as required.
4.2.8 Navy Aircraft Records
| FORM | TITLE/REMARKS | |||||
| OPNAV 4790/21A | Monthly Flight Summary | |||||
| OPNAV 4790/22A | Inspection Record | |||||
| OPNAV 4790/23A | Repair/Rework Record | |||||
| OPNAV 4790/24A | Technical Directives | |||||
| OPNAV 4790/25A | Miscellaneous/History | |||||
| OPNAV 4790/26A | Installed Explosive Devices | |||||
| OPNAV 4790/28A | Scheduled Removal Component Card | |||||
| OPNAV 4790/31A | Equipment Operating Records | |||||
| OPNAV 4790/111 (DD7801) | Aircraft Inventory Records | |||||
| OPNAV 4790/112 (DD7802) | Aircraft Inventory Record Shortages | |||||
| OPNAV 4790/104 (DD7803) | Aircraft Inventory Record Certification and Record of Transfer | |||||
| OPNAV 4790/138A | Aviation Crew System History Card | |||||
| OPNAV 4790/142 | Structural Life Limits (to be initiated and maintained only as necessitated by changes to applicable maintenance instructions.) | |||||
| OPNAV 5442/9 | Aircraft Record A Card | |||||
| DD 365-1 | Basic Weight Checklist | |||||
| DD 365-2 | Aircraft Weighing Record | |||||
| DD 365-3 | Basic Weight and Balance Record | |||||
| DD 365-4 | Weight and Balance Clearance Form |
Transport/Tactical
| CNATRA Form 4790/23 | Scheduled Removal Components | |
| Gas Free Engineering Log Book | ||
| Gas Free Engineering Certificate |
4.2.9 Navy Engine and Propeller Logbooks/Records
| FORM | TITLE/REMARKS |
| OPNAV 4790/22A | Inspection Record |
| OPNAV 4790/23A | Repair/Rework Record |
| OPNAV 4790/24A | Technical Directives |
| OPNAV 4790/106A | Assembly Service Record |
| OPNAV 4790/25A | Miscellaneous/History (to record special test data, over-temp, abnormal characteristics, significant damage/repair, JOAP entries, authorization for extensions of operating intervals, exposure to large quantities of salt water or any other corrosive media with description of contamination and time between exposure and decontamination) |
| OPNAV 4790/28A | Scheduled Removal Component Card |
| CNATRA Form 4790/23 | Scheduled Removal Components |
4.2.10 Records and Reports for Maintenance Services (Table A)
TABLE A
| RECORD OR REPORT |
| MEDIA |
| FREQUENCY |
| DISTRIBUTION |
| FORM/REFERENCE |
Aircraft Flight Record (NAVFLIR) Hard Copy
| Each Flight |
| OPS, Logs and Records |
| OPNAV Form 3710/4* |
CNAFINST4790.2
Functional Check Flight Records
| Hard Copy |
| As Occurring |
| Filed on site |
| NATOPS, CNAFINST 4790.2 |
| Custody Record Card (if required) |
| Hard Copy |
| Per SE End |
Item
| Filed on site |
| NATOPS, CNAFINST 4790.2 |
| Aircraft Logbook |
| Hard Copy |
| As Occurring |
| Filed on site |
| CNAFINST 4790.2 |
| Oil Analysis Request |
| Hard Copy |
| As Occurring |
| Filed on site |
| DD Form 2026 |
| Oil Consumption Logbook |
| Hard Copy |
| As Occurring |
| Filed on site |
| CNAFINST 4790.2 |
TD Applicability & Compliance Record List #2 & #4 Hard Copy
Quarterly
| Filed on site |
| CNAFINST 4790.2 |
Aeronautical Equipment Service Record Hard Copy
| As Occurring |
| Accompany Components |
| OPNAV 4790/29 |
| Weight and Balance |
| Hard copy |
| As Occurring |
| Filed on site |
| NAVAIR 01-1B-40 |
| Hydraulic Contamination Trend Analysis |
| Hard Copy |
| As Occurring |
| Filed on site |
| CNAFINST 4790.2 |
| A/C Discrepancy Book |
| Hard Copy |
| As Occurring |
| Filed on site |
| CNAFINST 4790.2 |
Missing/Lost/Damage/ Destroy Notification - SURVEY
| Hard Copy |
| As Occurring |
| Responsible Officer, COC |
| DOD 4161.2-M |
DD Form 200
SECNAV 5500.4
DOD Financial Reg. Vol. 12, Chapter 7
| IMRL Inventory Letter |
| Hard copy |
| Annual or As Required |
| MO, AMO, CO |
| CNAFINST 4790.2 |
| X-RAY |
| Electronically |
| As Occurring |
| As required |
| CNAFINST 4790.2 |
| Engine Transaction Report |
| Electronically |
| As Occurring |
| As required |
| NAVAIRINST 13700.15 |
NAMDRP Reports e.g. HMR, EMR, EI, QDR, ADR, TPDR, CODR
Electronically
As Occurring
As required
CNAFINST 4790.2
| Monthly Maintenance Plan Inputs |
| Electronically |
| Monthly NLT 15th |
| MO/DMO |
| CNAFINST 4790.2 |
Missing, Lost, Stolen - Tool Report
| Hard Copy |
| As Occurring |
| As required |
| CNAFINST 4790.2 |
| FOD Reports |
| Hard Copy |
| As Occurring |
| As required |
| CNAFINST 4790.2 |
| IMRL Revision Request |
| Hard Copy |
| As Occurring |
| As required |
| CNAFINST 4790.2 |
| IMRL Transaction Report |
| Hard Copy |
| As Occurring |
| As required |
| CNAFINST 4790.2 |
| IMRL Inventory |
| Electronically |
| Within 30 days of contract Assumption, completion, termination |
| As Required |
| CNAFINST 4790.2 |
Inventory of Aircraft Armament Equipment Items
| Hard Copy |
| Quarterly |
| As required |
| OPNAVINST 8000.16 series |
| SE Misuse and Abuse |
| Hard Copy |
| As Required |
| As Required |
| OPNAVINST 4790/108 |
| Hazardous Material Usage |
| Electronic |
| Quarterly |
| As Required |
| OPNAVINST 5090.1 |
NASPAXINST 4010.6
| Authorized Use List - HAZMAT |
| Hard Copy |
| ON Demand |
| As Required |
| NASPAXINST 4010.5B |
| Aircraft Daily Status Report |
| Electronic |
| Daily NLT 0600 |
| As Required |
| Government Furnished Format |
| DOD Property in Custody of Contractors report |
| Electronic |
| Annually and as required |
| As Required |
| FAR Part 45 |
| Certificate of Completion Summarizing work completed and Government Acceptance |
| Hard Copy/May be digitally signed and forwarded via email |
| Weekly or as Required |
| Squadron/Activity QA and MO/DMO |
| Contractor Provided/Government Approved |
| Relief From Performance Metrics |
| Hard Copy |
| As Required |
| Squadron MO/DMO |
| Government Furnished Format |
| NMCS/PMCS Report (NALCOMIS) |
| Electronically |
| Daily NLT 0630 |
| Post to: Y:\PAXR\AD\6.0\FRC\ |
Intranet\WEB\Pages\ Front Page.htm Web Portal
| Mishap Reporting |
| Verbally / Electronically |
| On Occurrence |
| OPNAVINST 3750.6 |
| OPNAVINST 3750.6 |
| 3-M Summary |
| Electronically |
| Monthly, NLT 12th |
| MMCO |
| Government Furnished Format |
Phase-In-Status (Contractor Furnished Format)
| Conference Call / Electronically |
| Weekly Call TBA: |
POA&M update NLT Wed Noon
| MO/DMO/COR |
| Contractor Provided |
5.0 PERFORMANCE REQUIREMENTS
Engineering, Instrumentation, and Maintenance/Manufacturing support may be funded with either Research and Development, Procurement, Working Capital Fund, Operation and Maintenance, or Foreign Military Sales depending which program requires the support and the stage of the programmatic acquisition cycle of the program. This will be specified on each Task Order and effort will be traced to the appropriate CLIN in Section B
Engineering, Instrumentation, and Maintenance/Manufacturing support described below supporting a Navy Working Capital acquisition effort shall be funded with Navy Working Capital funding
Engineering, Instrumentation, and Maintenance/Manufacturing support described below provided during the Technology Development and/or Engineering and Manufacturing Development acquisition cycles shall be funded with Research and Development funding.
Engineering, Instrumentation, and Maintenance/Manufacturing support described below provided during the Production and Deployment acquisition cycles shall be funded with Procurement funding.
Engineering, Instrumentation, and Maintenance/Manufacturing support described below provided during Operations and Support acquisition cycles or programs currently in sustainment shall be funded with Operations and Maintenance funding.
Engineering, Instrumentation, and Maintenance/Manufacturing support described below provided for Foreign Military Sales (FMS) customers shall be funded with FMS funding.
5.1 ENGINEERING SUPPORT.
5.1.1 The Contractor shall provide engineering and technical support to VX-23/ Air -5.0 at both Patuxent River and off-site, including Contractor facilities, as required, in accordance with 10.0 Place of Performance. The engineering and technical support shall include design, development, fabrication/manufacturing, integration/installation, calibration, checkout/troubleshoot and repair of new or modified systems/structures in F/A18A-F & EA-18G and future variants aircraft. The effort shall include system studies; test planning (including Test Working Documents) and execution including daily operations, data reduction/analysis, reports, simulations, system/clearance recommendations, and procurement of components/systems. The Contractor shall provide engineering support as required and for the incorporation of Technical Directives (TDs) / Remote Site (RSE) level efforts at NAWCAD, Patuxent River for NAVAIR assigned F/A-18 and future variants aircraft.
5.2 INSTRUMENTATION SUPPORT
5.2.1 The contractor shall provide aircraft instrumentation and technical support at both Patuxent River and off-site, including the use of contractor facilities, as required. The aircraft instrumentation and technical support shall include both on-/off-aircraft efforts including system design, development, fabrication/manufacturing of parts, hardware procurement, integration/installation, pre-/post-flight checkout/troubleshoot and repair, system calibrations, and database support of instrumentation systems installed in F/A18A-F & EA-18G and future variants aircraft to ensure their technical adequacy for required test efforts. In addition, instrumentation support shall remove/relocate instrumentation to facilitate aircraft accessibility during the PMI efforts. Instrumentation support shall ensure the accuracy, resolution, and reliability of the aircraft instrumentation systems. The contractor shall ensure that contractor data processing systems and Navy aircraft instrumentation systems remain compatible. The contractor shall monitor the development of Navy aircraft instrumentation systems and modify their data processing systems to remain compatible. Upgrades to hardware and software for the contractor data processing systems shall be incorporated as required. The contractor shall provide material control for all aircraft instrumentation test equipment and ensure the proper handling and accountability of Government Property (including data) in support of aircraft test requirements.
5.3 MAINTENANCE/MANUFACTURING OF PARTS SUPPORT
5.3.1 MAINTENANCE/MANUFACTURING GENERALLY
5.3.1.1 All aircraft maintenance and administrative tasks are to be performed per applicable Navy technical manuals and directives. The contractor shall develop the Ground Operating Procedures (GOPs) and the Flight Operating Procedures (FOPs) to cover the requirements in the NAVAIRINST 3710.1G and based on the COMNAVAIRFORINST 4790.2. CDRL A001 Contractor shall submit Flight and Ground Operating Procedures (FOPS/GOPS) to the Government Flight Representative (GFR)/Ground Government Flight Representative (GGFR) for review and approval prior to the first maintenance evolution. Contractor shall extract the requirements from the COMNAVAIRFORINST 4790.2 to ensure they are safe and effective, but may choose to reduce the number of OJT events or other redundant elements to reduce time and cost to the Contractor. Once signed, the FOPS/GOPs will be accepted based on service guidance, but must be re-submitted annually as per NAVAIRINST 3710.1G requirements. Contractor local work package shall be for complex, repetitive tasks such as engine changes. Contractor’s quality control inspection procedures shall provide a clear audit trail for all work accomplished. Comment by Thompson, John T (Ted) CIV USN AIRTEVRON TWO THREE (USA): If this contract has FOPS it means that there are contract pilots on this contract, if so, we will require a GFR vice GGFR.
5.3.1.2.Transient aircraft shall receive normal servicing and correction of safety of flight discrepancies. Any other work to be performed on transient aircraft shall be approved by the COR or the Maintenance Officer (MO)/Deputy Maintenance Officer (DMO) and the senior member of the detachment (military/civilian). Number of transient aircraft and duration of support varies. Maintenance of transient aircraft will follow the same FOP/GOP procedures as identified in 5.3.1.1.
5.3.1.3 Support Concept - The aircraft support concept is maintenance at the Organizational (O) level, however Intermediate (I), and Limited Depot (D) level maintenance may be performed at the direction of VX-23 via task order provided skilled artisans and required tools are available. The Contractor shall be responsible for providing total maintenance, logistic, and technical support, for squadron/activity aircraft, and associated equipment, in order to meet the daily flight schedule (DFS).
5.3.1.4 The Contractor shall supply the following aircraft maintenance/manufacturing of parts and technical support. This support can be performed at VX-23 and off-site detachments:
· Scheduled/unscheduled aircraft maintenance and Quality Assurance (QA) based on a 1 to 2-shift operation;
· Parts manufacturing and fabrication support for the replacement of unique or limited supply parts;
· Aircraft systems support for the integration/installation, checkout/troubleshoot and repair of avionics, unique systems, structural components, etc.;
· Laboratory support for avionics systems and data handling;
· Material Control handling support for all aircraft and instrumentation equipment/parts;
· Hazardous material program for the associated hazardous material at the storage sites;
· Documentation support including a Maintenance Data Center with blue print files, aircraft technical manuals and aircraft/system design specifications requirements for the F/A18A-F/ EA-18G and future variants aircraft. All non-production or project modifications incorporated onto aircraft by the Contractor shall include documentation of the installation(s) sufficient to support maintenance and associated Logs and Records entries;
· Inventory control for tools/tool cribs, aircraft parts, aircraft ancillary equipment (AAE), and support equipment (SE) in Contractor custody at the hangar and warehouse storage sites; and
5.3.1.5 The Contractor shall be responsible for the Repair or Replacement (ROR) of aircraft/system parts which includes the repair, modification (excludes Class I) and/or calibration of all EMD/SDD-unique aircraft/system and support equipment components. The Contractor shall repair, modify, restore and/or return items to be serviceable, but not like new, operating condition. The Contractor shall not begin servicing or continue to service any article, where it is apparent that a reasonable service life will not be attained or that the resulting total repair price (labor and parts) to the Navy is expected to exceed eighty percent (80%) of an item's replacement price. The ROR price shall be estimated by the Contractor based on current production prices. The Contractor shall promptly notify the COR and/or the Alternate Contracting Officer Representative (ACOR), which shall include confirmation by the Squadron MO/DMO of the Contractor’s beyond economic/physical repair (BER/BPR) evaluation. No further repair action shall occur until written authorization to proceed or disposition instructions are received from the COR and/or the ACOR. The Contractor is authorized to interchange components on inducted assets during the repair cycle, on a part number for part number basis.
5.3.1.6 The Contractor shall provide maintenance support as required and for the incorporation of Technical Directives (TDs) level efforts at NAWCAD, Patuxent River for NAVAIR assigned F/A-18 and future variants aircraft.
5.3.1.7 The Contractor shall follow the Program Office procedures which may include modifications from the basic maintenance manuals and will issue Navy approved Maintenance Engineering Directives (MEDs), Interim Operational Supplements (IOSs), or Technical Directives (TDs) to incorporate the specific requirement.
5.3.1.8 The Navy reserves the right to deviate from criteria established by the approved technical service maintenance procedures. The MO/DMO will notify the Contractor, in writing, of deviations to the approved maintenance requirements. At times to gain efficiencies the Contractor may need to deviate from approved technical service maintenance procedures. The Contractor shall request such deviations through the MO/DMO.
5.3.1.9 In instances when new preliminary procedures must be developed/utilized, the Contractor shall have the preliminary procedures reviewed and approved by the Naval Test Wing Atlantic Ordnance Officer per NAVTESTWINGLANTINST 8020.1 (e.g. procedures such as Government ground and flight test plans involving carriage or employment of air launched stores or ordnance systems that are under test).
5.3.1.10 The Contractor shall establish and maintain contact with military, civilian and/or other Contractor personnel as needed to solve technical or logistics issues. The Contractor Maintenance Control shall communicate directly with squadron Operations for flight schedule preparation and execution.
5.3.1.11 The Contractor shall staff to the appropriate levels associated with each Type/Model/Series aircraft. If required, the Contractor shall adjust the levels to support aircraft availability and ensure flight safety. Staffing requirements will be identified and adjusted with each task order.
5.3.1.12 Maintenance Department General Hours of Operation: The Government maintains the following general operating hours:
DX – Day Shift NX – Night Shift
| Activity/Shift/Hours |
| Days |
| DX 0530 - 1500 |
| Monday - Friday |
| *NX 1500 - 2330 |
| *Monday - Friday |
| *Prior Notification |
| *Saturday - Sunday |
*Only needed if longer hours are required to support mission and funding is available.
The Government reserves the right to adjust days/hours of operation to meet the needs of test programs. All changes will be provided by the squadron MO/DMO and /or COR. When the need for Weekend/Holiday flight and maintenance operations arises, notice will be given by the MO/DMO or COR to the Contractor. The Contractor shall not work any overtime without approval by the squadron MO/DMO and COR. In instances where overtime is required, the Contractor shall provide an estimate of number of OT hours required for the OT effort.
5.3.2 Applicable Maintenance Documents, Instructions and Notices
5.3.2.1 All maintenance performed by the Contractor shall be accomplished in accordance with applicable publications, technical directives, instructions, standards, and procedures contained in pertinent manuals using blueprints, drawings or schematics as provided by VX-23. All applicable technical manuals, forms, publications, bulletins, directives, specifications, standards, and field procedures guides shall be used and will be provided. When a maintenance or technical publication provided by the Government (via the CTPL) is subsequently revised, supplemented, replaced, or rescinded, the Contractor shall be required to comply. Conflict between this and any applicable document shall be referred to the VX-23MO/DMO and COR for resolution.
5.3.2.2 Combined Regulation/Instruction -- The Contractor shall be bound by the operating procedures contained in the combined regulation/instruction entitled “Contractor’s Flight and Ground Operations” (NAVAIRINST 3710.1G) in effect on the date of contract award. The Ground Operating Procedures (GOPs) will be written to cover the requirements in the NAVAIRINST 3710.1G and based on the COMNAVAIRFORINST 4790.2.; however, if commercial best practices or company procedures are submitted in lieu of COMNAVAIRFORINST 4790.2 standards, the GGFR is authorized to accept these standards if he/she deems them safe and effective to carry out a given aviation maintenance program. In all cases, the GFR must approve the procedures to be accepted by the Government.
5.3.2.3 The following are specific maintenance programs or procedures that shall follow the COMNAVAIRFORINST 4790.2 due to the tools they use to manage these programs/processes: Maintenance Control, Phase Maintenance, Technical Directives (TDs), SE Training and Licensing, SE Misuse and Abuse, SE PMS, NAMDRP, Logs and Records /Aeronautical Equipment Service Records (AESRs), X Ray reporting, Egress Systems Checkout, Data Analysis, CTPL, METCAL, Fuel Surveillance/Sampling, ALSS, and Acceptance and Transfer of Aircraft/SE. NOTE: The CTPL school requirement for the Aeronautical Technical Publications Management Course (C-555-0007 and subsequent course numbers), is encouraged for new hires, but not required if a robust CTPL training/OJT program is in place. All other aviation ground programs must have a Ground Operating Procedure as per the requirements of NAVAIRINST 3710.1G. In all cases, the Contractor is responsible for writing, implementing and enforcing its GOPs. The Contractor shall provide each employee with comprehensive initial indoctrination training sufficient to enable him/her to perform authorized ground operations in a safe and effective manner.
5.3.3 Technical/Performance Requirements
5.3.3.1 The Contractor shall:
· Validate NMCS/PMCS status Daily through Fleet & Industrial Supply Center “ONE TOUCH” Program.
· Conduct validation of outstanding NMCS/PMCS requirements daily.
· Ensure up to date status is maintained and corrections to status reports and maintenance reports are processed expeditiously.
· Coordinate with Technical Research to ensure manufacturer PNs are converted to NSNs, validate assigned SM&R code for non-stock numbered material to determine proper procurement source.
· Through the MO/DMO liaise with Inventory Managers, Inventory Control Points, Depot's, Field Representatives, ACCs, TYCOMS, and other units to obtain data for use in providing optimum supply support and reduced supply related downtime. Provide a monthly report to MO/DMO NLT COB the first Monday of each month to include updated notes on each NMCS/PMCS requisition.
· Act as liaison between customer, supplying activity, and host activity in coordinating delivery of material to the required pickup point.
· Perform tracer actions as required.
· Submit to the COR a monthly report summarizing type of work and man-hours expended. CDRL A002
· Submit a monthly on-board manpower report with losses / gains and turnover rate annotated. CDRL A003
· Submit to the COR a monthly Hours Executed report indicating straight time and overtime hours by activity assigned under the contract. CDRL A004
· Submit a Monthly Cost Summary Report (Vouchers to include cost and hours) to the COR. CDRL A005
· Submit Detachment and Overtime Reports to the COR. CDRL A006
· Submit to the COR a monthly completed and signed Certificate of Completion Acceptance of work (COCA). CDRL A010
5.3.3.2 Naval Logistics Command Management Information System (NALCOMIS) Systems Administrator Optimized Organizational Maintenance Activity (OOMA)
5.3.3.2.1 The Contractor shall operate and utilize NALCOMIS OOMA for Fleet representative aircraft that have established baselines. NALCOMIS OOMA is a real time on-line computer based maintenance information system that requires the Contractor’s maintenance personnel to record all flight information, maintenance actions, and aircraft status. The Contractor shall use the “In Process” function of OOMA, IAW CNAFINST 4790.2. In support of this requirement, the Government will provide NALCOMIS OOMA including all hardware, software, upgrades and 24 hour a day, seven days a week technical assistance via website and telephone.
5.3.3.2.2 Other Management Information Systems – The Contractor shall provide networked maintenance management information system for aircraft that are not covered by OOMA (EMD aircraft). The management information system shall be used to track all maintenance activity, high-time items, tool control, quality assurance, material requisitioning, 3M data, recurring inspections and documentation for releasing aircraft safe-for-flight. The government shall have full access to all modules and data files in real time.
5.3.3.2.3 Automated Data Processing Equipment (ADPE) - The Contractor shall comply with all computer system and ADPE accountability and security procedures required by the Government, including appointment of an ADPE Custodian for Government furnished ADPE. Additionally, the Contractor shall conduct inventories as changes occur, and support periodic inspections by base officials. The Contractor shall not attempt to repair Government furnished ADPE. The Contractor ADPE Custodian shall notify the appropriate Government representative when ADPE equipment needs repair.
5.3.3.3 Contractor Maintenance Control – Maintenance Control shall be established by the Contractor under the Government’s VX-23 Maintenance Control. Contractor Maintenance Control shall be responsible for the overall day to day performance of maintenance by the Contractor and be established in accordance with 4790.2 and GOP’s. VX-23 Maintenance Control shall be the single point of contact for the MO/DMO to receive updates and information on daily events. The Contractor Maintenance Control shall immediately notify the MO/DMO of any significant event involving safety, aircraft status changes, and cancelled flights due to maintenance.
5.3.3.4 Flight Documents - The Contractor shall perform up line reporting when notified by the squadron Operations Department IAW COMNAVAIRFORINST 4790.2 series and System Administrator Manual. The Contractor shall coordinate corrective actions between Data Services Facility and squadron Operations Department. All other duties relating to flight documents will be handled by the squadron Operations Department.
5.3.3.5 Long Term Down (LTD) Aircraft - An LTD aircraft is defined as an asset that has been in a non-flyable status due to placement in an Awaiting Parts and/or Awaiting Maintenance status for 60 days or more. To maximize utilization of all assigned assets, the Contractor shall closely monitor aircraft that approach a non-flyable status of 60 days. The Contractor shall include updated status on the daily aircraft status report, to include estimated repair time. The Contractor’s Maintenance Manager shall work with the squadron’s MO/DMO for Preservation requirements of aircraft IAW NA 01-1A-509. The Contractor shall refer to the NA 01-1A-509 for specific preservation guidance and applicable MRC’s.
5.3.3.6 Monthly Maintenance Plan is required by the COMNAVAIRFORINST 4790.2. Inputs for an encompassing VX-23 MMP will be provided to the VX-23 MMCO by the 15th of the month prior to the month to which it applies, for example, the MMP input for April would be required by the 15th of March. The Contractor shall update the MMPs to meet changing workload requirements determined at Navy scheduled maintenance conferences between the squadron maintenance officers and the Contractor.
5.3.3.7 Reports - The Contractor shall submit an input to the VX-23 MMCO for the Daily Aircraft Status Report (DASR) each work day. Reports provided to the Government for transmission by naval message shall be prepared in the proper format and submitted to MO/DMO for approval.
5.3.3.8 Dispersed Technical Library – The Contractor shall maintain a Dispersed Technical Library for VX-23’s Central Technical Library. Upon contract award, the Government will provide an initial digital inventory of publications, as they exist, in the current technical libraries. Authorized Government and Contractor personnel will have access to all libraries. All publications shall be considered Government property and turned over to the Government at the conclusion of the contract.
5.3.3.8.1 The Contractor shall:
· Update the publications (in either digital or hard copy format as applicable) and ensure the information contained in all technical publications is current and accurate.
· Collect all technical publication data and incorporate that digital data into the applicable publications. All changes shall be distributed to all appropriate technical libraries by the Contractor.
· Submit proposed changes to any technical publications IAW COMNAVAIRFORINST 4790.2 series.
5.3.3.9 The Contractor shall staff Aviation Life Support Systems (ALSS) personnel. The ALSS personnel shall maintain those items of equipment and clothing needed to allow aircrew members and aircraft passengers to: (1) function within all parameters of the flight environment, (2) safely egress from disabled aircraft, and (3) survive on land and water while awaiting rescue.
5.3.4 Tool Control
The Contractor shall manage a Tool Room for all Contractor Furnished Equipment (CFE) and provided Government Furnished Equipment (GFE) IAW applicable directives and instructions.
5.3.4.1 The Contractor shall maintain aircraft and engine slings IAW NA17-1-114.1.
5.3.4.2 The Contractor shall ensure the calibration requirements for all calibration items CFE/GFE are accomplished per Contractor GOPs and the CNAFINST 4790.2 and…