STATEMENT_OF_WORK_POL_PUMP_and_Motor.docx

DOCX document 22 KB Posted

Attached to
Repair POL Pump and Motor
Solicitation number
F9V3CE-600150127
Issued by

View the file

Other files

File Type Posted
wages.pdf PDF
synopsis_pol.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Repair POL Pump #3 and #4 Skid System Wyoming Air National Guard, Cheyenne MAP Cheyenne, Wyoming

1. BACKGROUND: This project is the repair of existing petroleum transfer pump skid at Wyoming Air National Guard, 217 Dell Range Blvd., Cheyenne, Wyoming (See attached Base Plan). These facilities receive, store, distribute, and dispense fuel and lubrication products necessary to achieve Wyoming Air National Guard mission requirements.

2. Applicable Documents The Contractor shall identify and comply with all applicable federal, state, and local statutes; American National Standards Institute (ANSI); American Petroleum Institute (API); American Society of Mechanical Engineers (ASME); ASTM International (ASTM); Code of Federal Regulations (CFR); Executive Orders (EOs); International Building Code (IBC); National Electrical Code (NEC); National Fire Protection Association (NFPA); Society of Protective Coatings (SSPC); Steel Tank Institute (STI);

3. Intent: of this project is to repair this pump station to its original functionality.

A. Repair by replacement all electrical wiring and associated enclosures conduits, boxes and associated peripheral equipment supporting the controls and motors to intake line.

B. Repair and/or replace one non-functioning pump and motor associated with line intake #4 and #3.

C. Repair and/or repair all controls and associated wiring. Properly identify and mark associated breakers and disconnects.

4. Scope: The contractor shall perform the following tasks in order to repair Pump:

A. Repair includes but is not limited to the following tasks:

a. Remove and replace pump, motor and pump starter wiring.

b. Replace with equivalent or in kind or suitable alternate.

c. Coordinate and verify proper installation and operation with representative from the 153 CES.

B. The current pump motor at P.O.L. is a Siemens DutymaxOrd no. 3-5108-LR05587-1
Type: RGZZSD
H.P. 15
RPM 1170
Duty: Cont.
Frame 284T
Volts 230/460
Hertz 60

APPLICABLE DOCUMENTS

The Contractor shall identify and comply with all applicable federal, state, and local statutes; American National Standards Institute (ANSI); American Petroleum Institute (API); American Society of Mechanical Engineers (ASME); ASTM International (ASTM); Code of Federal Regulations (CFR); Executive Orders (EOs); International Building Code (IBC); National Electrical Code (NEC); National Fire Protection Association (NFPA); Society of Protective Coatings (SSPC); Steel Tank Institute (STI);

DEMOLITION

The Contractor shall demolish facilities, systems, and other (previous) improvements (as required) in this project. Demolition activities can be incidental to other requirements or a stand- alone project. The Contractor shall conduct demolition efforts in conjunction with such activities as new construction or renovation, removal of outdated facilities, and site clearing from natural disasters. The contractor will be responsible for the proper disposal of all material and debris as required.

HAZARDOUS MATERIAL AND HAZARDOUS WASTE

The Contractor shall handle hazardous materials and waste in accordance with applicable, federal, state, and local requirements. The Contractor shall provide hazardous materials use and hazardous waste disposal documentation to the installation POC, and shall register with the Hazardous Materials Pharmacy program (if available) at the installation to ensure appropriate and efficient tracking of the Contractor’s hazardous material purchases, inventories, use, and releases (such as required by the Emergency Planning and Community Right-to-Know Act [EPCRA], EOs, or installation reporting requirements).

SPILL AND DISCHARGE CONTROL PLAN

The Contractor shall develop and submit a plan to include the following information as a minimum in addition to other information that may be a site specific requirement. Develop a comprehensive spill and discharge control plan. Consider and provide contingency measures for potential spills and discharges from handling and transportation of contaminated soils and water.

a. Types and physical and chemical properties of hazardous materials and waste

b. Categorization of levels of spills and discharge

c. Control procedures and protective measures

d. Regulatory and base spills response plans

The Contractor shall comply with federal, state, and local requirements for tasks involving the transportation of hazardous wastes and/or contaminated materials to off-site treatment, storage, and/or disposal facilities. Requirements include 40 CFR 260; 49 CFR 172, 173, 178, 179; and other applicable federal, state, and transportation regulations.

OPERATIONS AND MAINTENANCE (O&M) MANUAL

Operations and Maintenance Manuals: The Contractor shall provide the technical publications specified herein for all of the components, assemblies, subassemblies, attachments, and accessories in accordance with submittal requirements of each equipment component.

File details come from the government source that posted it. Updated .