17-Reconstruction of Bridge 1111 Proposal Report Attachment Structure Foundation Recommendations.pdf
PDF 13 MB Posted
- Attached to
- Reconstruction of Bridge 1111
- Solicitation number
- US.216665
- Issued by
- Mercer County, Pennsylvania
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E-Mailed October 2, 2023 (marena@hrg-inc.com)
Herbert, Rowland & Grubic, Inc.
220 West Kensinger Drive, Suite 100
Cranberry Township, PA 16066
Attention: Matthew J. Arena, P.E.
Project Engineer
Re: Mercer County Bridge 1111
Carpenter Road (T-760) Over Little
Shenango River
New Vernon Township, Mercer County, Pennsylvania
GMI Project No. 22025
Structure Foundation Recommendations
Gentlemen:
GeoMechanics, Inc. is pleased to present Structure Foundation Recommendations for the above-referenced bridge replacement project in New Vernon Township, Mercer County, Pennsylvania.
We wish to once again extend our appreciation for this opportunity to be of service to you on this interesting and challenging project. Should you have any questions regarding the attached recommendations or require additional information, please contact us.
Very truly yours, GEO-MECHANICS, INC.
Betty J. Murphy Walter M. Lorence, P.E.
Vice President Executive Vice President
\BJM\WML
z:\2022\22025\Reports\Bridge 1111\Bridge 1111 Report (22025).docx
FOUNDATION RECOMMENDATIONS
1. Summary of Foundation Recommendations
2. Foundation Recommendations
Based on our analyses of the test boring and laboratory testing information obtained specifically for this project, the following recommendations are presented as guidelines for the design and construction of the proposed bridge carrying Carpenter Road (T-760) over the Little
Shenango River in New Vernon Township, Mercer County, Pennsylvania.
2.1 Type and Depth of Foundations
• Place the bottom of the footing a minimum of 6 feet below the adjacent streambed elevation.
• Overexcavate the in-place soils below the foundation to a depth of 4 feet and backfill in accordance with Special Provision for Foundation
Stabilization with Coarse Aggregate appended to this report.
STR-1
Max.
Fin.
SER-1
Max.
Fin.
Abutment 1 1111-1 1152.0 1139.00 12.00 4.22 3.01 9.56 4.30 4.40 >2
Wings
A & B 1111-1 1152.0 1139.00 12.00 1.68 1.15 8.24 0.45 3.71 <1
Abutment 2 1111-2 1154.0 1137.00 14.00 4.16 2.94 9.12 0.45 4.10 >2
Wings
C & D 1111-2 1154.0 1137.00 14.00 1.82 1.24 9.37 0.45 4.22 <1
(1) Settlements can be reduced less than 1 inch after completion of 1,350 PSF surcharge load (See Special Provision-Surcharge Loading)
4.0' Thick
Compacted
Coarse
Aggregate
Over Glacial
Till
Factored
Bearing
Resistance
(KSF)
Estimated (1)
Settlement
(In.)
Bottom of
Footing
Elevation
(ft.)
Substructure Applicable
Boring(s)
Estimate
Surface
Elevation
(ft.)
Bearing
Material
Foundation
Pressure Ultimate
Bearing
Resistance
(KSF)
Bearing
Resistance
Factor
Foundation
Width
(Ft.)
• Prior to foundation construction apply a surcharge load in accordance with the Special Provision – Surcharge Loading to reduce settlements to less than 1 inch.
• Refer to Section 1 - Summary of Foundation Recommendations above for the design bearing elevations, ultimate bearing resistance and resistance factor for design.
2.2 Lateral Earth Pressure Criteria
• Depending on their flexibility, design the abutments and wingwalls as either rigid or flexible retaining walls, and utilize current Department design criteria for full-saturated soils to estimate the “at-rest” lateral earth pressures.
• Provide adequate drainage behind the abutments and wingwalls to reduce the buildup of any hydrostatic pressure in accordance with PennDOT
Standard drawing BC-751M.
2.3 Seismic Design Considerations
• Mercer County is located wholly within Seismic Zone 1. According to
Section 4.7.3.1 of Design Manual, Part 4, 2019 detailed seismic analysis is not required for single span bridges in Seismic Zone 1 unless the site soils are classified as either Site Class E or F. Due to the thickness of the loose sands encountered by the borings the site soils are classified as Site Class E and a detailed seismic analysis is required.
2.4 Foundation Preparation
• Completely remove the existing structure prior to construction of the proposed bridge foundations.
• Continuously dewater all foundation excavations extending below groundwater.
• Overexcavate the in-place very loose glacial sands to a depth of 4 feet below the bottom of the footing. Extend the overexcavation and backfill a minimum of 2 feet beyond the edges of the foundation. Roll in a layer of
AASHTO No. 1 on top of the subgrade to stiffen the subgrade soils prior to placement of the remaining backfill. Place a Class 4, Type A geotextile on top of the AASHTO No. 1 coarse aggregate prior to placing the AASHTO
No. 57 coarse aggregate (see Special Provision for Foundation Stabilization with Coarse Aggregate appended to this report).
• Prior to foundation construction apply a surcharge load in accordance with the Special Provision – Surcharge Loading to reduce settlements to less than 1 inch.
2.5 Temporary Excavations
• Design all temporary excavations in accordance with current OSHA requirements (29 CFR Part 1926.650-.652, Subpart P) assuming Type C
Soils.
2.6 Temporary Roadways
• Traffic will be detoured during construction.
2.7 Notes on Drawings
• Include the following general notes pertaining to geotechnical considerations on the structure drawings:
1. Completely remove the existing structure.
2. Bottom of excavations may be ordered at any elevation by the
Representative in order to provide a proper foundation.
3. Overexcavate the in-place very loose glacial materials to a depth of
4 feet below the bottom of the footing. Extend the overexcavation and backfill a minimum of 2 feet beyond the edges of the foundation. If any soft or wet zones are encountered, roll in
AASHTO No. 1 coarse aggregate to stiffen the subgrade soils prior to placement of the remaining backfill. Place a Class 4 geotextile on top of the AASHTO No. 1 coarse aggregate prior to placing of the AASHTO No. 57 coarse aggregate. (see Special Provision for
Foundation Stabilization with Coarse Aggregate appended to this report).
4. Notify the Representative at least 48 hours before the requested date and time of the inspection of an excavation. The Contractor is responsible for providing sufficient dewatering so that the excavations are dry enough to be inspected by the Representative.
5. Continuously dewater all foundation excavations extending below groundwater.
6. The Contractor is responsible for the stability of all temporary excavations. Direct surface runoff away from the excavations.
Perform all excavations in accordance with OSHA requirements.
2.8 Limitations
• During construction, if subsurface conditions are encountered that differ significantly from those reported herein, GeoMechanics, Inc. (GMI) should be notified immediately so that the analyses and recommendations presented herein can be reviewed and/or revised accordingly.
• In preparing this report, our professional services have been performed, our data has been obtained and our conclusions and recommendations have been prepared in accordance with generally accepted engineering principles and practices. This warranty is in lieu of all other warranties either expressed or implied. GMI assumes no responsibility for interpretations made by others based upon work or evaluations made by GMI.
Attachments
LIST OF APPENDICES
Tables
Appendix A: Test Boring Records Appendix B: Laboratory Test Results
Appendix C: Subsurface Cross Sections and
Calculations/Analysis
Appendix D: Draft Special Provisions
TABLES
LIST OF TABLES
Table No. 1: Summary of Pertinent Test Boring Information
Table No. 2: Laboratory Index Property Test Results for Soils
GMI Project No. 22025Mercer County
T-760 (Carpenter Road Over Little Shenango River) September 2023
Abutment 1 1111-1 52+40 10' LT 1152.0 73.5 10.5 ml, sm 6 1141.5 63.0
SP,
SP-SM
7 1078.5 73.5
Abutment 2 1111-2 53+20 10' RT 1154.0 22.5 10.5 ml, sm 11 1143.5 12.0 sp 5 1131.5 22.5
10.5 8 1142.5 37.5 6 1105.0 48.0
Not Present/Not Applicable
(1) Capital letters indicate classification based on laboratory test data; low case indicate visual classification.
Total
Soil
Thick-ness
(ft.)
Soil
TABLE NO. 1:
SUMMARY OF PERTINENT TEST BORING INFORMATION
Thick-ness
(ft.)
USCS
(1)
Class-ification
Navg
Base
Elev.
(ft.)
Glacial Till (1)Fill
Total
Depth
(ft.)
Thick-ness
(ft.)
Estimated
Ground
Surface
Elev.
(ft.)
Overall Structure Boring Averages
Base
Elev.
(ft.)
USCS
(2)
Class-ification
Navg
Notes:
L o c a ti o n
Boring
No.
Station Offset
GMI Project No. 22025Mercer County
T-760 (Carpenter Road Over Little Shenango River) September 2023
21.0 - 25.5 Jar Glacial Till NP NP NP 15.1 31.2 27.9 37.1 F2 A-1-b SP
30.0 - 35.0 Jar Glacial Till NP NP NP 11.8 12.1 41.9 37.9 F2 A-1-b SP-SM
LABORATORY TEST RESULTS
Frost
Group
(FHWA)
Soil Classification
Silt Clay Coarse
Sand
1111-1
Fine
Sand
3.8
8.1
TABLE NO. 2:
LABORATORY INDEX PROPERTY TEST RESULTS FOR SOILS
Boring
Number
Sample
Depth
(ft.)
Soil
Origin Aggre-gate
Natural
Moisture
Content
AASHTO USCS
Type of
Sample
Moisture (%) Gradation (% AASHTO)
Liquid
Limit
Plastic
Limit
Plasticity
Index
APPENDIX A
Test Boring Records
TABLE OF CONTENTS
• Geotechnical Specialist Certification
• Test Boring Records
Mercer County Bridge No. 1111
T-760, Carpenter Road over Little Shenango River GMI Project No. 22025
September 2023
GEOTECHNICAL SPECIALIST CERTIFICATION
I, the undersigned, hereby certify that I have observed the soil samples and rock cores for this project and that the classification of materials and depths presented on the following
Test Boring Records are, to the best of my knowledge, correct as submitted.
September 20, 2022
GEO-MECHANICS, INC.
Samuel Formica
Samuel A. Formica
Geotechnical Specialist
TEST BORING RECORDS
Boring Logs Included:
Borings 1111-1 and 1111-2
1141.5
1.5
4.5
7.5
10.5
13.5
16.5
19.5
22.5
0.0
3.0
10.5
Brown SANDY SILT, Trace Gravel, Trace Clay, Very Soft, Damp
(Fill)
Brown SILTY SAND, Some Gravel, Little Clay, Very Loose to Medium Dense, Damp
(Fill)
Gray Poorly-Graded SAND, Some Gravel Trace Silt, Very Loose to Loose, Wet
.Occasional Traces of Wood Fragments
.Gravel Component is Well Rounded
.Water in Jar @ 15.0'
(Glacial Outwash)
Water @ 9.0'
Driller Reported Running Sand
21.0-25.5' SP/A-1-b
GEO-MECHANICS, INC. TEST BORING RECORD
Surface Driller Matt Hart Boring No. 1111-1 Elevation 1152± Sheet No. 1 of sheets
Drill Rig CME-55 Track For Mercer Bridge No. 1111 Water Level: O-Hr. NR 24 Hrs. Caved T-760 (Carpenter Road) Over Little Shenango Casing Hammer: Wt. lbs. Drop in.
Sampler Hammer: Wt. 140 lbs. Drop 30 in. Location New Vernon Township, Mercer County, PA Sampler Size 2 in. O.D. Casing Size 3.25 in. I.D. Started 9-29-2023 Completed 9-30-2023 Project No. 22025 Core Bit Size N/A Driller's Log Drilling Fluid N/A Orientation Vertical Geologist's Log SAF
E
LE
V A
TI
O
N
In-Situ Tests and
Instrumentation
RQD
% RUN-REC.
INTERV.
SPOON
BLOWS
BOTTOM
DEPTH
OF
SAMPLE
DEPTH
(Ft.) D E S C R I P T I O N REMARKS
River
1127 2
25.5
28.5
31.5
35.0
40.5
43.5
46.5
49.5
25.0 Continued From Previous Page
.No Recovery From 42.0-43.5'
30.0'-35.0' SP-SM/A-1-b
GEO-MECHANICS, INC. TEST BORING RECORD
Surface Driller Matt Hart Boring No. 1111-1 Elevation 1152± Sheet No. 2 of sheets
Drill Rig CME-55 Track For Mercer Bridge No. 1111 Water Level: O-Hr. NR 24 Hrs. Caved T-760 (Carpenter Road) Over Little Shenango Casing Hammer: Wt. lbs. Drop in.
Sampler Hammer: Wt. 140 lbs. Drop 30 in. Location New Vernon Township, Mercer County, PA Sampler Size 2 in. O.D. Casing Size 3.25 in. I.D. Started 9-29-2023 Completed 9-30-2023 Project No. 22025 Core Bit Size N/A Driller's Log Drilling Fluid N/A Orientation Vertical Geologist's Log SAF
E
LE
V A
TI
O
N
In-Situ Tests and
Instrumentation
RQD
% RUN-REC.
INTERV.
SPOON
BLOWS
BOTTOM
DEPTH
OF
SAMPLE
DEPTH
(Ft.) D E S C R I P T I O N REMARKS
1078.5
52.5
55.5
58.5
61.5
64.5
67.5
70.5
73.5
50.0
69.0
73.5
Continued From Previous Page
Gray SILTY GRAVEL and SAND, Trace Clay, Loose, Wet
(Glacial Outwash)
Bottom of Boring @ 73.5'
GEO-MECHANICS, INC. TEST BORING RECORD
Surface Driller Matt Hart Boring No. 1111-1 Elevation 1152± Sheet No. 3 of sheets
Drill Rig CME-55 Track For Mercer Bridge No. 1111 Water Level: O-Hr. NR 24 Hrs. Caved T-760 (Carpenter Road) Over Little Shenango Casing Hammer: Wt. lbs. Drop in.
Sampler Hammer: Wt. 140 lbs. Drop 30 in. Location New Vernon Township, Mercer County, PA Sampler Size 2 in. O.D. Casing Size 3.25 in. I.D. Started 9-29-2023 Completed 9-30-2023 Project No. 22025 Core Bit Size N/A Driller's Log Drilling Fluid N/A Orientation Vertical Geologist's Log SAF
E
LE
V A
TI
O
N
In-Situ Tests and
Instrumentation
RQD
% RUN-REC.
INTERV.
SPOON
BLOWS
BOTTOM
DEPTH
OF
SAMPLE
DEPTH
(Ft.) D E S C R I P T I O N REMARKS
1143.5
1131.5
1.5
4.5
7.5
10.5
13.5
16.5
19.5
22.5
0.0
3.0
10.5
22.5
Brown SANDY SILT, Little Clay, Little Gravel, Stiff, Damp
(Fill)
Brown to Gray SILTY SAND, Some Gravel, Little to Trace Clay, Very Loose to Medium Dense, Damp
.Contains Organics From 9.0- 10.5'
(Fill)
Gray Poorly-Graded SAND, Little Gravel, Trace Clay, Trace Silt, Very Loose to Loose, Moist to Wet
.Occasional Traces of Wood Fragments
.Water in Jar From 12.0-13.5'
(Glacial Outwash)
Bottom of Boring @ 22.5'
GEO-MECHANICS, INC. TEST BORING RECORD
Surface Driller Carlos Trevino Boring No. 1111-2 Elevation 1154± Sheet No. 1 of sheets
Drill Rig CME-55 Trailer For Mercer Bridge No. 1111 Water Level: O-Hr. NR 24 Hrs. Caved T-760 (Carpenter Road) Over Little Shenango Casing Hammer: Wt. lbs. Drop in.
Sampler Hammer: Wt. 140 lbs. Drop 30 in. Location New Vernon Township, Mercer County, PA Sampler Size 2 in. O.D. Casing Size 3.25 in. I.D. Started 9-30-2023 Completed 9-30-2023 Project No. 22025 Core Bit Size N/A Driller's Log Drilling Fluid N/A Orientation Vertical Geologist's Log SAF
E
LE
V A
TI
O
N
In-Situ Tests and
Instrumentation
RQD
% RUN-REC.
INTERV.
SPOON
BLOWS
BOTTOM
DEPTH
OF
SAMPLE
DEPTH
(Ft.) D E S C R I P T I O N REMARKS
APPENDIX B
Laboratory Test Results
TABLE OF CONTENTS
• Engineer’s Certification
• AASHTO Certificate of Accreditation
• Particle Size Distribution Reports LT-1 and LT-2
Mercer County Bridge No. 1111
T-760, Carpenter Road over Little Shenango River GMI Project No. 22025
September 2023
ENGINEER'S CERTIFICATION
I, the undersigned, hereby certify that I am Technical Director of the AASHTO-accredited laboratory of GeoMechanics, Inc. and that the following test methods were used for analysis of soil and rock samples during preparation of the Structure Foundation Report for Final
Design in Franklin County, Pennsylvania. All reported test results have been reviewed for their accuracy and validity.
Type of Test Method
Soil
Moisture Content AASHTO: T 265; ASTM: D 2216
Gradation AASHTO: T 88; ASTM: D 422
Atterberg Limits AASHTO: T 89 and T 90; ASTM: D
September 20, 2023
GEO-MECHANICS, INC.
Walter M. Lorence, P.E.
Executive Vice President
LL PL D85 D60 D50 D30 D15 D10 Cc Cu
Material Description USCS AASHTO
Project No. Client: Remarks:
Project:
Source of Sample: 1111-1 Depth: 21.0'-25.5'
GEO-MECHANICS, INC. Figure
NV NP 5.2669 1.0732 0.5992 0.3149 0.2116 0.1803 0.51 5.95
poorly graded sand with gravel SP A-1-b
22025 HRG
LT-1
PE
R
C
EN
T
FI
N
ER
GRAIN SIZE - mm.
0.0010.010.1110100
% +3" % Gravel Coarse
% Sand
Fine Silt
% Fines
Clay
0.0 31.2 27.9 37.1 3.8 in in in
1½ in in
¾ in
½ in
3/ in
#4 #1
#2
#3
#4
#6
#1
#1
#2
Particle Size Distribution Report
MERCER COUNTY BRIDGE No. 1111
LL PL D85 D60 D50 D30 D15 D10 Cc Cu
Material Description USCS AASHTO
Project No. Client: Remarks:
Project:
Source of Sample: 1111-1 Depth: 30.0'-35.0'
GEO-MECHANICS, INC. Figure
NV NP 1.5126 0.5845 0.4655 0.2899 0.1806 0.1131 1.27 5.17
poorly graded sand SP-SM A-1-b
22025 HRG
LT-2
PE
R
C
EN
T
FI
N
ER
GRAIN SIZE - mm.
0.0010.010.1110100
% +3" % Gravel Coarse
% Sand
Fine Silt
% Fines
Clay
0.0 12.1 41.9 37.9 8.1 in in in
1½ in in
¾ in
½ in
3/ in
#4 #1
#2
#3
#4
#6
#1
#1
#2
Particle Size Distribution Report
MERCER COUNTY BRIDGE No. 1111
APPENDIX C
Geologic Profile and Calculations/Analyses
TABLE OF CONTENTS
• Appendix C-1: Geologic Profile
• Appendix C-2: Information Provided by HRG
• Appendix C-3: Geotechnical Engineering Analyses by GeoMechanics, Inc.
Appendix C-1: Geologic Profile
1,090
1,100
1,110
1,120
1,130
1,140
1,150
1,090
1,100
1,110
1,120
1,130
1,140
1,150
ELEV. 1152.0 FT.
STA. 52+40.0
OFFSET 10.0 FT. LT.
24 hr. NR 0 hr.: 1143.0 FT.
22.5'
ELEV. 1154.0 FT.
STA. 53+20.0
OFFSET 10.0 FT. RT.
24 hr. 1145.0 FT.
0 hr.: 1129.7 FT.
EL
EV
AT
IO
N (F
T.
) ELEVATIO
N
(FT.)
N60, Recovery. & RQD Fence Plot
Prepared by: GeoMechanics, Inc.
Note: Lines, if any, drawn between fence diagrams designate estimated subsurface conditions for presentation purposes only to indicate similar materials. Actual subsurface conditions between boring locations are not known.
Note:
- For description of graphic symbols see Publication 222.
- GRAV = Gravel
- BFE = Bottom of Footing Elevation
- SBE = Streambed Elevation
Mercer County Bridge #1111 T-760 (Carpenter Road Over Little Shenango River)
Date: 4/24/2023
Horizontal Scale: 1" = 10' Vertical Scale: 1" = 10'
DISTANCE ALONG SELECTED BASELINE
PE
N
N D
O T
N
R
EC
R Q
D F
EN
C
E
- P
EN
N
D O
T_ G
IN
T_
VE
R
SI
O
N _1
.2 .2
.3 _9
-2 1-
.G D
T
- 4
/2 4/
4:
Z:
\2
JO
BS
\2
M
ER
C
ER
C
O U
N
TY
B R
ID
G
ES
\T
ES
T
BO
R
IN
G
L O
G S\
BR
ID
G E
B O
R
IN
G L
O G
S.
G
EO
\1
1B
O R
IN
G
LO
G
S.
G
PJ
3.0'
10.5'
1111-1
3.0'
10.5'
22.5'
1111-2
SILT
SAND
SILT
SAND
SAND &
GRAV
73.5'
1,080 sformica Line sformica Line sformica Text Box
BFE @ 1139'
sformica Text Box
ADJ. SBE @ 1146.3'
sformica Line sformica Text Box N60avg = 9 sformica Line sformica Line sformica Line sformica Text Box
GLACIAL TILL
sformica Text Box No Recovery From 42.0 - 43.5' sformica Text Box Gray Poorly-Graded Sand, Trace to Some Gravel, Trace Silt, Very Loose to Medium Dense, Wet sformica Line sformica Text Box Gray Silty Gravel and Sand, Trace Clay, Loose, Wet sformica Line sformica Text Box
FILL
sformica Text Box
GEOLOGIC PROFILE
sformica Text Box
21.0 - 22.5' SP / A-1-b (3.8% Fines) sformica Text Box
30.0 - 35.0' SP-SM / A-1-b (8.1% Fines) sformica Line sformica Text Box
ADJ. SBE @ 1144.25'
sformica Text Box
BFE @ 1137'
sformica Line sformica Line sformica Line sformica Line
Appendix C-2: Information Provided by
HRG
TABLE OF CONTENTS
• General Plan and Elevation (1 Sheet)
• ABLRFD Analysis for Abutment 1
• ABLRFD Analysis for Wings A & B
• ABLRFD Analysis for Abutment 2
• ABLRFD Analysis for Wings C & D
General Plan
REVISIONS
Mark Description By Chk'd Recm'd. Date
RECOMMENDED
SHEET OF
DEPARTMENT OF BRIDGES
MERCER COUNTY, PENNSYLVANIA
DES: DWG: CKD:
S
E P
:3
P
L O
T T
E D
BRIDGE NO. 1111
NEW VERNON TOWNSHIP
T-760 (CARPENTER RD)
OVER LITTLE SHENANGO RIVER
SINGLE SPAN STEEL ROLLED BEAM BRIDGE
43 7216 0760 1111 BMS STR ID: 26202 BRKEY:
O P
E R
A T
O R
F
IL
E N
A M
E r p a le
.1
.0
.3
\P r o je c t\
\0
\M ic r o s ta ti o n \B
R I D
G E
C a r p e n te r R o a d
\B R
I D
G E
\F D
\B
G
P E
.d g n
CARPENTER ROAD (T-760)
H&T
H&T
WING B
WING C
CLEAR SPAN
70'-6"
� BRG TO � BRG
72'-0"
ABUT 2
STA 53+14.00
� BRG
ABUT 1
STA 52+42.00
� BRG
STA 52+41.08
BEGIN BRIDGE
TO BE REMOVED
EXISTING BRIDGE
(ROADWAY ITEM) TYP
APPROACH GUIDE RAIL
WING A
90°0'0"
30°0'0"
(TYP)
L
IT
T L E
S H
E N
A N
G O
R
IV
E R
BARRIER (TYP)
MOUNTED GUIDERAIL
PA STRUCTURE
WITH R-4 (TYP)
ROCK, CLASS R-7 CHOKED
SELECTED BORROW EXCAVATION
CONSTR �
(CARPENTER RD)
T-760
STA AHEAD
WING D
STA 53+14.92
END BRIDGE
(T Y P
'-0
L A
N E
L A
N E
S H
L D
R
S H
L D
R
O U
T -T
O -O
U T
C U
R B
-T O
-C U
R B
B A
R R
IE
R
B A
R R
IE
R
(TYP)
ITEM) TYP
(ROADWAY
APPROACH
N24°04'42"E
.5
S
T A
P
T
(T Y P
FOR TWP RD
REQ'D R/W LINE
FOR TWP RD
REQ'D R/W LINE
FOR TWP RD
LEGAL R/W LINE
FOR TWP RD
LEGAL R/W LINE
POINT OF MIN UNDERCLEARANCE
(FIX)
ELEV 1152.90
ABUT 2
� BRG
(EXP)
ELEV 1153.26
ABUT 1
� BRG
� BRG TO � BRG
72'-0"
(ROADWAY ITEM) TYP
APPROACH GUIDE RAIL
ROADWAY SURFACE
DATUM: 1130
PROPOSED STREAMBED
EXISTING AND
STEEL ROLLED BEAM
W30X148
WITH R-4 (TYP)
ROCK, CLASS R-7 CHOKED
SELECTED BORROW EXCAVATION
1.5
ELEV 1149.37
LOW CHORD
-0.50% -2.13%GUIDE RAIL BARRIER
PA STRUCTURE MOUNTED
-0.5%
ELEV 1146.50
BFE: 1139.00
3'-0" (TYP)
ELEV 1144.50
BFE: 1137.00
(TYP)
2'-0" BENCH
MIN UNDERCLEARANCE
"8
523'-
CLEAR SPAN
70'-6"
Q100 Q50
BRIDGE ENGINEER
4 0 4 8 FEET
4 0 4 8 FEET
(TYP)
FEB. 27, 2023RC-51MTYPE 31 STRONG POST GUIDE RAIL
NOV. 01, 2022RC-12MBACKFILL AT STRUCTURES
JUN. 01, 2010RC-11MCLASSIFICATION OF EARTHWORK FOR STRUCTURES
NOV. 23, 2022BC-788MTYPICAL WATERPROOFING AND EXPANSION DETAILS
JAN. 31, 2019BC-755MBEARINGS
NOV. 23, 2022BC-754M
(STRAIGHT GIRDERS ONLY)
STEEL DIAPHRAGMS FOR STEEL BEAM/GIRDER STRUCTURES
JAN. 31, 2019BC-753MSTEEL GIRDER DETAILS
NOV. 23, 2022BC-752MCONCRETE DECK SLAB DETAILS
JAN. 31, 2019BC-751MBRIDGE DRAINAGE
NOV. 23, 2022BC-736MREINFORCEMENT BAR FABRICATION DETAILS
FEB. 19, 2021BC-734MANCHOR SYSTEMS
NOV. 23, 2022BC-732MPERMANENT METAL DECK FORMS
JAN. 31, 2019BC-706MPA STRUCTURE MOUNTED GUIDE RAIL BARRIER
RECM'D DATEDWG NODESCRIPTION
SUPPLEMENTAL DRAWINGS
DIRECTION OF TRAVEL FLOW
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
EXISTING WETLANDS
EXISTING SIGN
EXISTING CONTOUR LINE
EXISTING EDGE OF STREAM
TANGENT ON BRIDGE
VERTICAL CURVE DATA
HYDRAULIC DATA
VELOCITY = 5.38 FPS
ELEVATION = 1147.93
MAGNITUDE = 1970 CFS
100 YEAR FLOOD:
VELOCITY = 5.08 FPS
ELEVATION = 1147.36
MAGNITUDE = 1650 CFS
DESIGN FLOOD:
DRAINAGE AREA: 9.77 SQ MI
LEGEND
HORIZONTAL CURVE DATA
ELEVATION
PLAN
RJP RJP
GENERAL PLAN AND ELEVATION
PENNSYLVANIA 16066
CRANBERRY TOWNSHIP,
220 WEST KENSINGER DRIVE, SUITE 100
HERBERT, ROWLAND AND GRUBIC INC.
PREPARED BY
MJA
TANGENT ON BRIDGE
SUPERSTRUCTURE REINFORCEMENT BAR SCHEDULE26
BARRIER DETAILS25
SLAB REINFORCEMENT SECTION24
SLAB REINFORCEMENT PLAN23
ABUTMENT 2 END DIAPHRAGM AND DETAILS22
ABUTMENT 1 END DIAPHRAGM AND DETAILS21
BEARING DETAILS20
BEAM ELEVATION AND DIAPHRAGM DETAILS19
FRAMING PLAN18
ABUTMENT 2 REINFORCEMENT BAR SCHEDULE17
ABUTMENT 2 WING D16
ABUTMENT 2 WING C15
ABUTMENT 2 SECTIONS14
ABUTMENT 2 FOOTING PLAN13
ABUTMENT 2 PLAN AND ELEVATION12
ABUTMENT 1 REINFORCEMENT BAR SCHEDULE11
ABUTMENT 1 WING B10
ABUTMENT 1 WING A9
ABUTMENT 1 SECTIONS8
ABUTMENT 1 FOOTING PLAN7
ABUTMENT 1 PLAN AND ELEVATION6
STAKE-OUT PLAN5
TYPICAL SECTION AND ELEVATIONS4
QUANTITIES AND RATING TABLE3
GENERAL NOTES2
GENERAL PLAN AND ELEVATION1
TITLESHEET NO.
INDEX OF DRAWINGS
ABLRFD Analysis for Abutment 1
Project: R003366.0442
Calc By: RJP Date:1/7/2023
Chkd By: MJA Date: 1/29/23
ABLRFD INPUT CALCULATIONS
Purpose:
Worksheet calculates input parameters for PennDOT ABLRFD v1.18.0.0 program.
Location:
Mercer County Bridge 1111 Abutment 1 (Expansion)
AWB Tab Input:
≔BFE 1139.00 ft "Bottom of footing elevation"
≔BSE 1149.69 ft "Bearing seat elevation"
≔FTGDepth 2 ft "Footing depth"
≔HABUT =--BSE BFE FTGDepth 8.69 ft "Height of stem below superstructure"
≔tdeck 8 in “Thickness of proposed deck”
≔thaunch 1 in “Proposed haunch thickness”
≔dbeam 30.7 in “Proposed beam depth - W30x148”
≔tsole_plate 1 in “Thickness of sole plate”
≔tbrg 2.1034 in “Bearing pad thickness”
≔Hsuper =++++tdeck thaunch dbeam tsole_plate tbrg 3.57 ft “Total height of proposed superstructure”
≔Tstem_top +1 ft 8 in “Thickness of stem at top”
≔BFVert_Comp 12 “H:1.0 V component of rear face batter - BD-621M”
≔WeepElev 1147.00 ft “Weep hole elevation, 6" above GWL (BC-751M)”
≔WA 3 ft “Differential water height - DM4, 3.11.3”
≔HWA_F =-BSE WeepElev 2.69 ft “Front water level (3ft Min)”
≔HWA_R =-HWA_F WA -0.31 ft “Rear water level”
FTG Tab Input:
≔FtgWidth 12 ft
≔MinToeProjection 4 ft
≔StemBottom =+――――
HABUT
BFVert_Comp
Tstem_top 2.3908 ft
≔MinHeelProjection =--FtgWidth MinToeProjection StemBottom 5.6092 ft
LDC Tab Input:
\\192.168.0.34\Project\0033\003366_0442\Admin\Structures\Final Design\Bridge 1111\07. Abutment Design\Analysis\ABLRFD 1 Input Calc.mcdx
Chkd By: MJA Date: 1/29/23
LDC Tab Input:
≔LSTEMP 3 ft “Temporary Live Surcharge”
≔LSFINAL 3 ft “Final Live Surchage, DM4 T3.11.6.4-1”
≔ESTEMP 0 ft “Temporary Earth Surcharge”
≔ESFINAL 0 ft “Final Earth Surcharge”
MAT Tab Input:
≔ϕ 33.25 ° “Backfill friction angle - ABLRFD default utilized”
≔γd 120 pcf ≔γsat 135 pcf "Default value used"
≔γMEFP 35 pcf “Default value used”
LAB Tab Input:
≔γc 150 pcf
≔WDIA 1.64 ft “Average width of end diaphragm”
≔wDIA =⋅⋅γc WDIA Hsuper 0.877 klf “End diaphragm weight”
≔PDC1_INT 30.63 kip ≔PDC2_INT 4.00 kip “Interior beam reactions from STLRFD”
≔PDC1_EXT 29.10 kip ≔PDC2_EXT 4.00 kip “Exterior beam reactions from STLRFD”
≔PDW_EXT 5.29 kip ≔PDW_INT 5.29 kip “Future wearing surface reactions”
≔LABUT +27 ft 6.5 in “Length along front face of abutment”
≔nINT 3 “Number of interior beams”
≔PDC_INT =+PDC1_INT PDC2_INT 34.63 kip
≔PDC_EXT =+PDC1_EXT PDC2_EXT 33.1 kip
≔wDC =+―――――――― +⋅2 PDC_EXT ⋅nINT PDC_INT
LABUT
wDIA 7.05 klf “Dead load on abutment”
≔wDW =―――――――― +⋅2 PDW_EXT ⋅nINT PDW_INT
LABUT
0.96 klf “Future wearing surface load on abutment”
See Abutment Wind Load Input Calculation for vertical and horizontal wind loads acting on abutments.
≔HTU 3.906 kip “Horizontal force due to thermal movement per bearing”
≔nbrg 5 "Number of bearings"
≔TU =⋅HTU ――
nbrg
LABUT
0.71 klf "Thermal force on substructure"
DLL Tab Input:
\\192.168.0.34\Project\0033\003366_0442\Admin\Structures\Final Design\Bridge 1111\07. Abutment Design\Analysis\ABLRFD 1 Input Calc.mcdx
Chkd By: MJA Date: 1/29/23
DLL Tab Input:
≔nlanes 2 “Number of design lanes”
≔PLL 85.71 kip “Live load per lane w/o impact from STLRFD”
≔wLL =―――― ⋅nlanes PLL
LABUT
6.22 klf “Live load on abutment”
≔BR 0 kip “Maximum live load reaction due to braking force”
≔wBR =――
BR
LABUT
0 klf “Braking force applied to abutment”
≔CE 0 kip “Centrifugal force - Not Applicable”
≔wCE =――
CE
LABUT
0 klf “Centrifugal force applied to abutment”
\\192.168.0.34\Project\0033\003366_0442\Admin\Structures\Final Design\Bridge 1111\07. Abutment Design\Analysis\ABLRFD 1 Input Calc.mcdx
* Program Title LRFD Abutment and Retaining Wall *
* Program Name ABLRFD *
* Version 1.18.0.0 *
* Last Updated 01/28/2022 *
* Documentation 01/2022 *
* License No. 335685 *
* BRIDGE 1111 ABUTMENT 1 ANALYSIS *
* COPYRIGHT (C) 1997-2022 *
* COMMONWEALTH OF PENNSYLVANIA *
* DEPARTMENT OF TRANSPORTATION *
* ALL RIGHTS RESERVED *
* DUPLICATION, ALTERATION, OR OTHER UNAUTHORIZED *
* USE OF THESE MATERIALS IS STRICTLY PROHIBITED. *
* THE COMMONWEALTH EXCLUDES ANY AND ALL IMPLIED WARRANTIES, INCLUDING WARRANTIES OF *
* MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, AND LIMITS THE USER'S REMEDY *
* TO RETURN OF THE SOFTWARE AND DOCUMENTATION TO THE COMMONWEALTH FOR REPLACEMENT. *
* THE COMMONWEALTH MAKES NO WARRANTY OR REPRESENTATION, EITHER EXPRESS OR IMPLIED, *
* WITH RESPECT TO THIS SOFTWARE OR ACCOMPANYING DOCUMENTATION, INCLUDING THEIR *
* QUALITY, PERFORMANCE, MERCHANTABILITY, OR FITNESS FOR A PARTICULAR PURPOSE. THIS *
* SOFTWARE AND DOCUMENTATION ARE PROVIDED "AS IS" AND THE USER ASSUMES THE ENTIRE RISK *
* AS TO THEIR QUALITY AND PERFORMANCE. *
* THE COMMONWEALTH WILL NOT BE LIABLE FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, *
* OR CONSEQUENTIAL DAMAGES ARISING OUT OF THE USE OR INABILITY TO USE THE SOFTWARE OR *
* ANY ACCOMPANYING DOCUMENTATION. *
* THE COMMONWEALTH WILL NOT BE LIABLE FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, *
* OR CONSEQUENTIAL DAMAGES ARISING OUT OF ANY DEFECT IN THE SOFTWARE OR ANY *
* ACCOMPANYING DOCUMENTATION. *
LRFD Abutment and Retaining Wall, Version 1.18.0.0 PAGE 2 Input File: Bridge 1111 ABLRFD Abutment 1 Analysis.dat 09/01/2023 11:08:01
BRIDGE 1111 ABUTMENT 1 ANALYSIS
SUMMARY OF INPUT FILE
COMMAND: CTL
SYSTEM OF UNITS US (default)
TYPE OF RUN A
FOOTING DATUM * (computed, if necessary)
COMMAND: AWB
HEIGHT 8.69 ft TOP WIDTH 20 in BEARING LOCATION 9 in FRONT FACE HORZ COMP. * (computed, if necessary) FRONT FACE VERT COMP. * (computed, if necessary)
BACK FACE HORZ COMP. 1
BACK FACE VERT COMP. 12
ADDITIONAL FILL HEIGHT 3.57 ft FRONT WATER LEVEL 3 ft BACK WATER LEVEL 0 ft
TYPE OF WALL C
ARCHT TREAT THICKNESS 0.0 in (default)
COMMAND: FTG
MINIMUM FOOTING THICKNESS 2 ft MINIMUM TOE PROJECTION 4 ft MINIMUM HEEL PROJECTION 5.61 ft MINIMUM FOOTING WIDTH * ft (computed, if necessary) MAXIMUM FOOTING THICKNESS * ft (computed, if necessary) MAXIMUM TOE PROJECTION * ft (computed, if necessary) MAXIMUM HEEL PROJECTION * ft (computed, if necessary) MAXIMUM FOOTING WIDTH * ft (computed, if necessary) FOOTING THICK INCREMENT 2.0 in (default) FOOTING WIDTH INCREMENT 3.0 in (default) FOOTING STEM INCREMENT 1.0 in (default)
COMMAND: MAT
BACKWALL CONC. STRENGTH * ksi (computed, if necessary) STEM CONC. STRENGTH 3 ksi FOOTING CONC. STRENGTH 3 ksi REINF. YIELD STRENGTH 60 ksi EPOXY COAT BARS - BACK * (computed, if necessary)
EPOXY COAT BARS - STEM Y
EPOXY COAT BARS - FOOT Y
BACKFILL FRICTION ANGLE 33.25 deg (default) BACKFILL UNIT WEIGHT DRY 120.0 lb/ft^3 (default) BACKFILL UNIT WEIGHT SAT 135.0 lb/ft^3 (default) MIN EQUIV EARTH PRESSURE 35.0 lb/ft^3 (default) DENSITY OF CONC. FOR DL 150.0 lb/ft^3 (default) DENSITY OF CONC. FOR E 145.0 lb/ft^3 (default) DENSITY OF CONC. FOR AT 150.0 lb/ft^3 (default) REINF ULT TENS STRENGTH * ksi (computed, if necessary)
COMMAND: SOI
STEM TOP TO SOIL LAYER 10.69 ft FOOTING LENGTH (PARALLEL) 27.5417 ft
FOOTING NEAR SLOPE? N
SOIL LEVEL OVER TOE 5.3333 ft ALLOWABLE SETTLEMENT 1 in
BEARING CAPACITY PHI 0.45
SLIDING PHI FACTOR 0.80
NUMBER OF SOIL LAYERS 2
L1 SOIL LAYER THICKNESS 4 ft L1 UNDRAINED SHEAR STR * ksf (computed, if necessary) L1 MASS UNIT WEIGHT 105 lb/ft^3 L1 SAT UNIT WEIGHT 110 lb/ft^3 L1 ELASTIC MODULUS 2000 ksf
L1 POISSONS RATIO 0.35
L1 COHESION 0 ksf L1 FRIC ANGLE(EFFECT) 38 deg L1 NCQ (NEAR SLOPE) * (computed, if necessary) L1 N_GAMMA_Q(NEAR SLOPE) * (computed, if necessary) L2 SOIL LAYER THICKNESS 53 ft L2 UNDRAINED SHEAR STR * ksf (computed, if necessary) L2 MASS UNIT WEIGHT 110 lb/ft^3 L2 SAT UNIT WEIGHT 115 lb/ft^3 L2 ELASTIC MODULUS 400 ksf
L2 POISSONS RATIO 0.3
L2 COHESION * ksf (computed, if necessary) L2 FRIC ANGLE (EFFECT) 29 deg
LRFD Abutment and Retaining Wall, Version 1.18.0.0 PAGE 3
BRIDGE 1111 ABUTMENT 1 ANALYSIS
SUMMARY OF INPUT FILE (cont.)
COMMAND: SOI (cont.)
L2 NCQ (NEAR SLOPE) * (computed, if necessary) L2 N_GAMMA_Q(NEAR SLOPE) * (computed, if necessary)
APPLY INCLINATION FACTORS Y
PRECAST OR CAST-IN-PLACE C
L1 REDUC COEFF RCBC * (computed, if necessary) L2 REDUC COEFF RCBC * (computed, if necessary)
COMMAND: MRD
AGGREGATE SIZE 1.5 in DEVELOPMENT CORRECTION 1.0 (default) BACKWALL EXPOSURE * (computed, if necessary) STEM EXPOSURE 1 (default) FOOTING EXPOSURE 1 (default)
COMMAND: CVR
BACKWALL BACK - VERT. * in (computed, if necessary) STEM BACK - VERTICAL 3.0 in (default) FOOTING TOP PERPEND. 3.0 in (default) FOOTING TOP PARALLEL * in (computed, if necessary) FOOTING BOTTOM PERPEND. 4.0 in (default) FOOTING BOTTOM PARALLEL * in (computed, if necessary) TOE END COVER 2.0 in (default) HEEL END COVER 2.0 in (default)
COMMAND: BAR
BACKWALL BACK - VERT. * US bar (computed, if necessary) FOOTING TOP PERPEND. 5 US bar FOOTING TOP PARALLEL * US bar (computed, if necessary) FOOTING BOTTOM PERPEND. 6 US bar FOOTING BOTTOM PARALLEL * US bar (computed, if necessary)
FOOTING TOP PERP HOOKED S
FOOTING BOT PERP HOOKED S
COMMAND: SPA
BACKWALL BACK - VERT. * in (computed, if necessary) FOOTING TOP PERPEND. 9 in FOOTING TOP PARALLEL * in (computed, if necessary) FOOTING BOTTOM PERPEND. 9 in FOOTING BOTTOM PARALLEL * in (computed, if necessary)
COMMAND: SRB
BAR SIZE 6 US bar BAR SPACING 9 in GROUP OFFSET * in (computed, if necessary) END LOCATION 8.69 ft
COMMAND: LDC
DUCTILITY FACTOR (ETA) 1
REDUNDANCY FACTOR (ETA) 1
IMPORTANCE FACTOR (ETA) 1
LS (TEMP STAGE) 3 ft LS (FINAL STAGE) 3 ft ES (TEMP STAGE) 0 ft ES (FINAL STAGE) 0 ft
COMMAND: LAB
DC - SUPERSTRUCTURE 7.05 kip/ft DW - SUPERSTRUCTURE 0.96 kip/ft PL - PEDESTRIAN * kip/ft (computed, if necessary) WS - WIND VERT ON SUP -0.551 kip/ft WS - WIND HORZ ON SUP * kip/ft (computed, if necessary) WL - WIND ON LIVE LOAD 0.0 kip/ft (default) TU - THERMAL FORCE 0.71 kip/ft BACKWALL VERTICAL LL * kip/ft (computed, if necessary) BACKWALL HORIZONTAL LL * kip/ft (computed, if necessary) WS - WIND HORZ ON SUB 0.0 kip/ft (default) FR - FRICTION FORCE 0.0 kip/ft (default) WS1 - WIN HORZ SUP SRV 1 0.0 kip/ft (default) WS3 - WIN HORZ SUP STR 3 0.0 kip/ft (default) WS5 - WIN HORZ SUP STR 5 0.0 kip/ft (default) WS1 - WIN HORZ SUB SRV 1 0.064 kip/ft WS3 - WIN HORZ SUB STR 3 0.173 kip/ft WS5 - WIN HORZ SUB STR 5 0.084 kip/ft
LRFD Abutment and Retaining Wall, Version 1.18.0.0 PAGE 4
BRIDGE 1111 ABUTMENT 1 ANALYSIS
SUMMARY OF INPUT FILE (cont.)
COMMAND: DLL
LL - LIVE LOAD - DOWNWARD 6.22 kip/ft LL - LIVE LOAD - UPWARD 0.0 kip/ft (default) BR - BRAKING FORCE 0.0 kip/ft (default) CE - CENTRIFUGAL FORCE 0.0 kip/ft (default)
COMMAND: OIN
INPUT FILE ECHO 0
INPUT COMMANDS 1
INPUT SUMMARY 0
COMMAND: OUR
FOOTING GEOMETRY 1 (default) OUTPUT LEGEND 1 (default) FACTORED FORCES 1 (default) FOOTING STABILITY 1 (default) CONTROL FOOTING FORCES 1 (default) FOOTING FLEXURE 1 (default) REINFORCEMENT SUMMARY 1 (default) CRACK CONTROL 1 (default) SHEAR RESULTS 1 (default) DEVELOPMENT LENGTH 1 (default)
COMMAND: OUI
UNFACTORED LOADS 0 (default) LOAD FACTORS 0 (default) MOMENT AXIAL INTERACTION 1 (default) INTERNAL FOOTING FORCES 0 (default)
BEARING RESISTANCE VALUES 1
DETAILED CUTOFF VALUES 0 (default) MIN REINFORCEMENT CHECK * (computed, if necessary)
The following are system settings:
PRINT DIMENSION FILE N (default) HISTORY FILE 0 (default) SOIL HISTORY 0 (default)
LRFD Abutment and Retaining Wall, Version 1.18.0.0 PAGE 5
BRIDGE 1111 ABUTMENT 1 ANALYSIS
ADDITIONAL INFORMATION
FOOTING GEOMETRY
Footing Footing Projection Effective Depth Stem Width Thick Width Toe Heel Toe Heel Footing Top
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
2.00 12.00 4.00 5.61 1.64 1.72 2.39
Moments are assumed to cause tension on the bottom face of the footing at the toe and on the top face of the footing at the heel.
Effective depths are based on this assumption.
COMPUTED VALUES
Front Concrete Modulus of Rupture (3) Modulus of Elasticity Modular Ratio Water Density Level Factor Backwall Stem Footing Backwall Stem Footing Bckw Stem Foot (ft)(1) (2) (ksi) (ksi) (ksi) (ksi) (ksi) (ksi) N/A 1.000 N/A 0.416 0.416 N/A 3100. 3100. N/A 9. 9.
Notes: (1) The computed value complies with DM-4 Section 3.11.3.
(2) The concrete density modification factor is defined according to AASHTO LRFD Specifications Section 5.4.2.8.
(3) Modulus of Rupture defined according to AASHTO LRFD Specifications Section 5.4.2.6.
LRFD Abutment and Retaining Wall, Version 1.18.0.0 PAGE 6
BRIDGE 1111 ABUTMENT 1 ANALYSIS
OUTPUT LEGEND
Abbrev Limit State Description STR-I Strength I - STR-III Strength III - STR-V Strength V - SER-I Service I - CSS Con-Sec-Stl - Consolidation and Secondary Settlement Only
Abbrev Load Case Description Max Maximum - Maximum downward vertical force, maximized moment, maximum shear Min Minimum - Minimum downward vertical force, maximized moment, maximum shear
Abbrev Stage Description Tmp Temporary - Temporary Construction Condition Fin Final - Final Construction Condition
Symbol Explanation
* - Indicates a multiplication (Load Factors Report) / - Indicates a division (Load Factors Report)
Status Code Description OK - Check was satisfied NG - Check failed NC - Not checked NA - Not applicable
LRFD Abutment and Retaining Wall, Version 1.18.0.0 PAGE 7
BRIDGE 1111 ABUTMENT 1 ANALYSIS
FACTORED FORCES
FOUNDATION FORCES AT FOOTING TOE - VERTICAL
Limit Load Toe to Average Average State Case Stage Result Force Load Moment Load
(ft) (kip) Factor (kip-ft) Factor STR-I Max Tmp 6.23 15.79 1.57 -123.40 1.59 STR-I Min Tmp 5.75 11.16 1.11 -89.09 1.15 STR-I Max Fin 4.84 40.88 1.50 -249.58 1.52 STR-I Min Fin 4.24 20.96 1.00 -140.51 1.05 STR-III Max Tmp 6.11 11.80 1.52 -88.14 1.54 STR-III Min Tmp 5.28 7.16 0.92 -53.84 0.94 STR-III Max Fin 4.93 26.00 1.39 -162.62 1.42 STR-III Min Fin 4.15 16.42 0.90 -102.64 0.92 STR-V Max Tmp 6.18 15.22 1.51 -118.36 1.53 STR-V Min Tmp 5.65 10.59 1.05 -84.05 1.08 STR-V Max Fin 4.85 37.48 1.38 -229.70 1.40 STR-V Min Fin 4.21 20.05 0.96 -132.45 0.99 SER-I Max Tmp 5.82 10.07 1.00 -77.47 1.00 SER-I Min Tmp 5.82 10.07 1.00 -77.47 1.00 SER-I Max Fin 4.52 27.20 1.00 -163.97 1.00 SER-I Min Fin 4.46 20.98 1.00 -134.42 1.00 CSS Max Fin 4.93 18.70 1.00 -114.28 1.00 CSS Min Fin 4.93 18.70 1.00 -114.28 1.00
FOUNDATION FORCES AT FOOTING TOE - HORIZONTAL
Limit Load Toe to Average Average State Case Stage Result Force Load Moment Load
(ft) (kip) Factor (kip-ft) Factor STR-I Max Tmp 6.23 5.50 1.36 24.94 1.36 STR-I Min Tmp 5.75 5.50 1.36 24.94 1.36 STR-I Max Fin 4.84 8.85 1.32 51.61 1.28 STR-I Min Fin 4.24 8.85 1.32 51.61 1.28 STR-III Max Tmp 6.11 3.71 1.19 16.03 1.16 STR-III Min Tmp 5.28 3.71 1.19 16.03 1.16 STR-III Max Fin 4.93 6.40 1.19 34.51 1.10 STR-III Min Fin 4.15 6.40 1.19 34.51 1.10 STR-V Max Tmp 6.18 5.30 1.28 24.21 1.27 STR-V Min Tmp 5.65 5.30 1.28 24.21 1.27 STR-V Max Fin 4.85 8.34 1.23 48.11 1.17 STR-V Min Fin 4.21 8.34 1.23 48.11 1.17 SER-I Max Tmp 5.82 4.12 1.00 18.87 1.00 SER-I Min Tmp 5.82 4.12 1.00 18.87 1.00 SER-I Max Fin 4.52 6.76 1.00 40.93 1.00 SER-I Min Fin 4.46 6.76 1.00 40.93 1.00 CSS Max Fin 4.93 4.49 1.00 22.07 1.00 CSS Min Fin 4.93 4.49 1.00 22.07 1.00
Note: Moments are taken about the bottom of the footing at the toe.
Positive moment clockwise; negative moment counterclockwise;
toe on right; heel on left.
STEM LOCATION A 2.17 (ft) FROM TOP OF STRUCTURE
Limit Load State Case Stage Axial Moment Shear (kip) (kip-ft) (kip) STR-I Max Tmp 0.87 0.50 0.62 STR-I Min Tmp 0.66 0.50 0.62 STR-I Max Fin 22.12 12.54 2.37 STR-I Min Fin 7.71 5.42 2.37 STR-III Max Tmp 0.75 0.30 0.35 STR-III Min Tmp 0.54 0.30 0.35 STR-III Max Fin 11.12 6.03 1.44 STR-III Min Fin 7.04 2.43 1.44 STR-V Max Tmp 0.85 0.52 0.63 STR-V Min Tmp 0.64 0.52 0.63 STR-V Max Fin 19.60 11.09 2.19 STR-V Min Fin 7.68 4.81 2.19 SER-I Max Tmp 0.66 0.39 0.47 SER-I Min Tmp 0.66 0.39 0.47 SER-I Max Fin 14.98 9.24 2.05 SER-I Min Fin 8.76 4.45 2.05
LRFD Abutment and Retaining Wall, Version 1.18.0.0 PAGE 8
BRIDGE 1111 ABUTMENT 1 ANALYSIS
FACTORED FORCES (cont.)
STEM LOCATION B 4.34 (ft) FROM TOP OF STRUCTURE
Limit Load State Case Stage Axial Moment Shear (kip) (kip-ft) (kip) STR-I Max Tmp 1.88 2.81 1.63 STR-I Min Tmp 1.42 2.81 1.63 STR-I Max Fin 23.24 20.92 3.79 STR-I Min Fin 8.55 12.54 3.79 STR-III Max Tmp 1.65 1.76 1.01 STR-III Min Tmp 1.19 1.75 1.01 STR-III Max Fin 12.13 11.15 2.51 STR-III Min Fin 7.77 7.23 2.51 STR-V Max Tmp 1.84 2.83 1.60 STR-V Min Tmp 1.39 2.82 1.60 STR-V Max Fin 20.70 18.81 3.54 STR-V Min Fin 8.50 11.51 3.54 SER-I Max Tmp 1.44 2.19 1.25 SER-I Min Tmp 1.44 2.19 1.25 SER-I Max Fin 15.84 15.99 3.10 SER-I Min Fin 9.62 10.63 3.10
STEM LOCATION C 6.52 (ft) FROM TOP OF STRUCTURE
Limit Load State Case Stage Axial Moment Shear (kip) (kip-ft) (kip) STR-I Max Tmp 3.03 7.52 2.81 STR-I Min Tmp 2.29 7.51 2.81 STR-I Max Fin 24.51 32.58 5.38 STR-I Min Fin 9.50 22.94 5.38 STR-III Max Tmp 2.69 4.77 1.79 STR-III Min Tmp 1.94 4.76 1.79 STR-III Max Fin 13.28 18.71 3.70 STR-III Min Fin 8.61 14.46 3.70 STR-V Max Tmp 2.98 7.42 2.72 STR-V Min Tmp 2.24 7.41 2.72 STR-V Max Fin 21.94 29.63 5.04 STR-V Min Fin 9.42 21.29 5.04 SER-I Max Tmp 2.33 5.82 2.14 SER-I Min Tmp 2.33 5.82 2.14 SER-I Max Fin 16.81 25.14 4.26 SER-I Min Fin 10.59 19.23 4.26
STEM LOCATION D 8.69 (ft) FROM TOP OF STRUCTURE
Limit Load State Case Stage Axial Moment Shear (kip) (kip-ft) (kip) STR-I Max Tmp 4.34 14.96 4.14 STR-I Min Tmp 3.26 14.94 4.14 STR-I Max Fin 25.92 47.86 7.12 STR-I Min Fin 10.55 36.96 7.12 STR-III Max Tmp 3.88 9.64 2.72 STR-III Min Tmp 2.80 9.62 2.72 STR-III Max Fin 14.58 29.01 5.04 STR-III Min Fin 9.55 24.43 5.04 STR-V Max Tmp 4.27 14.62 4.00 STR-V Min Tmp 3.20 14.61 4.00 STR-V Max Fin 23.33 43.87 6.69 STR-V Min Fin 10.45 34.49 6.69 SER-I Max Tmp 3.33 11.48 3.12 SER-I Min Tmp 3.33 11.48 3.12 SER-I Max Fin 17.89 36.93 5.52 SER-I Min Fin 11.67 30.45 5.52
FOOTING - W/O FOUNDATION PRESSURE
Limit Load Toe Shear Toe Heel Shear Heel State Case Stage Eff D at Face Moment Eff D at Face Moment (kip) (kip) (kip-ft) (kip) (kip) (kip-ft) STR-I Max Tmp 0.55 0.88 1.84 7.59 11.03 30.70 STR-I Min Tmp 0.30 0.46 1.00 5.58 8.13 22.59
LRFD Abutment and Retaining Wall, Version 1.18.0.0 PAGE 9
BRIDGE 1111 ABUTMENT 1 ANALYSIS
FACTORED FORCES (cont.)
FOOTING - W/O FOUNDATION PRESSURE (cont.)
Limit Load Toe Shear Toe Heel Shear Heel State Case Stage Eff D at Face Moment Eff D at Face Moment (kip) (kip) (kip-ft) (kip) (kip) (kip-ft) STR-I Max Fin 0.55 0.88 1.84 10.01 14.52 31.41 STR-I Min Fin 0.30 0.46 1.00 7.32 10.65 22.89 STR-III Max Tmp 0.55 0.88 1.84 5.14 7.49 20.79 STR-III Min Tmp 0.30 0.46 1.00 3.13 4.60 12.67 STR-III Max Fin 0.55 0.88 1.84 7.56 10.99 21.49 STR-III Min Fin 0.30 0.46 1.00 4.87 7.11 12.98 STR-V Max Tmp 0.55 0.88 1.84 7.24 10.52 29.28 STR-V Min Tmp 0.30 0.46 1.00 5.23 7.63 21.17 STR-V Max Fin 0.55 0.88 1.84 9.45 13.72 29.14 STR-V Min Fin 0.30 0.46 1.00 6.76 9.84 20.63 SER-I Max Tmp 0.37 0.58 1.24 4.65 6.79 18.81 SER-I Min Tmp 0.37 0.58 1.24 4.65 6.79 18.81 SER-I Max Fin 0.37 0.58 1.24 6.43 9.36 19.28 SER-I Min Fin 0.37 0.58 1.24 6.43 9.36 19.28 CSS Max Fin 0.37 0.58 1.24 5.03 7.34 13.62 CSS Min Fin 0.37 0.58 1.24 5.03 7.34 13.62
Note: Moment critical sections in the footing are at the front and back face of the stem. Shear critical sections in the footing are located at the effective depth distance away from the front face of the stem for the toe and at the back face of the stem for the heel.
LRFD Abutment and Retaining Wall, Version 1.18.0.0 PAGE 10
BRIDGE 1111 ABUTMENT 1 ANALYSIS
FOOTING STABILITY
INTERMEDIATE BEARING RESISTANCE VALUES
Number Limit Soil Soil of State Case Stage Cat Cond Layers Description STR-I Max Tmp 4 6 2 Dense over Loose Sand - H1<2*B'
Gamma Gamma Layer qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 1 13.85 0.0 38.0 105.0 110.0 47.60 c 61.352 1.000 0.000 n/a g 78.024 0.832 0.248 q 48.933 1.327 0.416
Gamma Gamma Layer *qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 2 5.75 0.0 29.0 110.0 115.0 52.60 c 27.860 1.000 0.000 n/a g 19.338 0.832 0.248 q 16.443 1.232 0.416
Bearing Final Resist qult H1 Ks Df Df2 B' L' Zw Hu Vu (ksf) (ksf) (ft) (ft) (ft) (ft) (ft) (ft) (kips/ft) (kips/ft)
3.12 6.92 4.00 3.98 7.33 11.33 11.53 27.54 -10.69 4.05 10.07
* Layer 2 qult calculation uses Gamma for Layer 1 and Gamma for Layer 2. Refer to User Manual Chapter 3 / Bearing Capacity Check / Category 4: Soil Condition 6 for details.
Number Limit Soil Soil of State Case Stage Cat Cond Layers Description STR-I Min Tmp 4 6 2 Dense over Loose Sand - H1<2*B'
Gamma Gamma Layer qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 1 13.83 0.0 38.0 105.0 110.0 47.60 c 61.352 1.000 0.000 n/a g 78.024 0.833 0.248 q 48.933 1.326 0.415
Gamma Gamma Layer *qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 2 5.75 0.0 29.0 110.0 115.0 52.60 c 27.860 1.000 0.000 n/a g 19.338 0.833 0.248 q 16.443 1.231 0.415
Bearing Final Resist qult H1 Ks Df Df2 B' L' Zw Hu Vu (ksf) (ksf) (ft) (ft) (ft) (ft) (ft) (ft) (kips/ft) (kips/ft)
3.11 6.92 4.00 3.98 7.33 11.33 11.50 27.54 -10.69 4.05 10.07
* Layer 2 qult calculation uses Gamma for Layer 1 and Gamma for Layer 2. Refer to User Manual Chapter 3 / Bearing Capacity Check / Category 4: Soil Condition 6 for details.
LRFD Abutment and Retaining Wall, Version 1.18.0.0 PAGE 11
BRIDGE 1111 ABUTMENT 1 ANALYSIS
FOOTING STABILITY (cont.)
INTERMEDIATE BEARING RESISTANCE VALUES (cont.)
Number Limit Soil Soil of State Case Stage Cat Cond Layers Description STR-I Max Fin 4 6 2 Dense over Loose Sand - H1<2*B'
Gamma Gamma Layer qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 1 20.44 0.0 38.0 105.0 110.0 47.60 c 61.352 1.000 0.000 n/a g 78.024 0.859 0.461 q 48.933 1.275 0.612
Gamma Gamma Layer *qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 2 8.43 0.0 29.0 110.0 115.0 52.60 c 27.860 1.000 0.000 n/a g 19.338 0.859 0.461 q 16.443 1.195 0.612
Bearing Final Resist qult H1 Ks Df Df2 B' L' Zw Hu Vu (ksf) (ksf) (ft) (ft) (ft) (ft) (ft) (ft) (kips/ft) (kips/ft)
4.40 9.79 4.00 3.98 7.33 11.33 9.69 27.54 -10.69 6.70 27.20
* Layer 2 qult calculation uses Gamma for Layer 1 and Gamma for Layer 2. Refer to User Manual Chapter 3 / Bearing Capacity Check / Category 4: Soil Condition 6 for details.
Number Limit Soil Soil of State Case Stage Cat Cond Layers Description STR-I Min Fin 4 6 2 Dense over Loose Sand - H1<2*B'
Gamma Gamma Layer qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 1 15.52 0.0 38.0 105.0 110.0 47.60 c 61.352 1.000 0.000 n/a g 78.024 0.877 0.345 q 48.933 1.241 0.507
Gamma Gamma Layer *qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 2 6.58 0.0 29.0 110.0 115.0 52.60 c 27.860 1.000 0.000 n/a g 19.338 0.877 0.345 q 16.443 1.171 0.507
Bearing Final Resist qult H1 Ks Df Df2 B' L' Zw Hu Vu (ksf) (ksf) (ft) (ft) (ft) (ft) (ft) (ft) (kips/ft) (kips/ft)
3.64 8.09 4.00 3.98 7.33 11.33 8.48 27.54 -10.69 6.70 20.98
LRFD Abutment and Retaining Wall, Version 1.18.0.0 PAGE 12
BRIDGE 1111 ABUTMENT 1 ANALYSIS
FOOTING STABILITY (cont.)
INTERMEDIATE BEARING RESISTANCE VALUES (cont.)
Number Limit Soil Soil of State Case Stage Cat Cond Layers Description STR-III Max Tmp 4 6 2 Dense over Loose Sand - H1<2*B'
Gamma Gamma Layer qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 1 14.20 0.0 38.0 105.0 110.0 47.60 c 61.352 1.000 0.000 n/a g 78.024 0.829 0.253 q 48.933 1.334 0.421
Gamma Gamma Layer *qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 2 5.88 0.0 29.0 110.0 115.0 52.60 c 27.860 1.000 0.000 n/a g 19.338 0.829 0.253 q 16.443 1.237 0.421
Bearing Final Resist qult H1 Ks Df Df2 B' L' Zw Hu Vu (ksf) (ksf) (ft) (ft) (ft) (ft) (ft) (ft) (kips/ft) (kips/ft)
3.16 7.03 4.00 3.98 7.33 11.33 11.78 27.54 -10.69 3.10 7.79
* Layer 2 qult calculation uses Gamma for Layer 1 and Gamma for Layer 2. Refer to User Manual Chapter 3 / Bearing Capacity Check / Category 4: Soil Condition 6 for details.
Number Limit Soil Soil of State Case Stage Cat Cond Layers Description STR-III Min Tmp 4 6 2 Dense over Loose Sand - H1<2*B'
Gamma Gamma Layer qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 1 13.40 0.0 38.0 105.0 110.0 47.60 c 61.352 1.000 0.000 n/a g 78.024 0.847 0.251 q 48.933 1.299 0.417
Gamma Gamma Layer *qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 2 5.62 0.0 29.0 110.0 115.0 52.60 c 27.860 1.000 0.000 n/a g 19.338 0.847 0.251 q 16.443 1.212 0.417
Bearing Final Resist qult H1 Ks Df Df2 B' L' Zw Hu Vu (ksf) (ksf) (ft) (ft) (ft) (ft) (ft) (ft) (kips/ft) (kips/ft)
3.09 6.88 4.00 3.98 7.33 11.33 10.55 27.54 -10.69 3.10 7.79
LRFD Abutment and Retaining Wall, Version 1.18.0.0 PAGE 13
BRIDGE 1111 ABUTMENT 1 ANALYSIS
FOOTING STABILITY (cont.)
INTERMEDIATE BEARING RESISTANCE VALUES (cont.)
Number Limit Soil Soil of State Case Stage Cat Cond Layers Description STR-III Max Fin 4 6 2 Dense over Loose Sand - H1<2*B'
Gamma Gamma Layer qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 1 18.34 0.0 38.0 105.0 110.0 47.60 c 61.352 1.000 0.000 n/a g 78.024 0.857 0.396 q 48.933 1.280 0.555
Gamma Gamma Layer *qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 2 7.60 0.0 29.0 110.0 115.0 52.60 c 27.860 1.000 0.000 n/a g 19.338 0.857 0.396 q 16.443 1.198 0.555
Bearing Final Resist qult H1 Ks Df Df2 B' L' Zw Hu Vu (ksf) (ksf) (ft) (ft) (ft) (ft) (ft) (ft) (kips/ft) (kips/ft)
4.02 8.94 4.00 3.98 7.33 11.33 9.85 27.54 -10.69 5.37 18.70
* Layer 2 qult calculation uses Gamma for Layer 1 and Gamma for Layer 2. Refer to User Manual Chapter 3 / Bearing Capacity Check / Category 4: Soil Condition 6 for details.
Number Limit Soil Soil of State Case Stage Cat Cond Layers Description STR-III Min Fin 4 6 2 Dense over Loose Sand - H1<2*B'
Gamma Gamma Layer qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 1 16.47 0.0 38.0 105.0 110.0 47.60 c 61.352 1.000 0.000 n/a g 78.024 0.879 0.378 q 48.933 1.235 0.538
Gamma Gamma Layer *qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 2 6.97 0.0 29.0 110.0 115.0 52.60 c 27.860 1.000 0.000 n/a g 19.338 0.879 0.378 q 16.443 1.167 0.538
Bearing Final Resist qult H1 Ks Df Df2 B' L' Zw Hu Vu (ksf) (ksf) (ft) (ft) (ft) (ft) (ft) (ft) (kips/ft) (kips/ft)
3.83 8.51 4.00 3.98 7.33 11.33 8.30 27.54 -10.69 5.37 18.15
LRFD Abutment and Retaining Wall, Version 1.18.0.0 PAGE 14
BRIDGE 1111 ABUTMENT 1 ANALYSIS
FOOTING STABILITY (cont.)
INTERMEDIATE BEARING RESISTANCE VALUES (cont.)
Number Limit Soil Soil of State Case Stage Cat Cond Layers Description STR-V Max Tmp 4 6 2 Dense over Loose Sand - H1<2*B'
Gamma Gamma Layer qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 1 13.52 0.0 38.0 105.0 110.0 47.60 c 61.352 1.000 0.000 n/a g 78.024 0.831 0.239 q 48.933 1.330 0.406
Gamma Gamma Layer *qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 2 5.62 0.0 29.0 110.0 115.0 52.60 c 27.860 1.000 0.000 n/a g 19.338 0.831 0.239 q 16.443 1.234 0.406
Bearing Final Resist qult H1 Ks Df Df2 B' L' Zw Hu Vu (ksf) (ksf) (ft) (ft) (ft) (ft) (ft) (ft) (kips/ft) (kips/ft)
3.05 6.78 4.00 3.98 7.33 11.33 11.63 27.54 -10.69 4.14 10.07
* Layer 2 qult calculation uses Gamma for Layer 1 and Gamma for Layer 2. Refer to User Manual Chapter 3 / Bearing Capacity Check / Category 4: Soil Condition 6 for details.
Number Limit Soil Soil of State Case Stage Cat Cond Layers Description STR-V Min Tmp 4 6 2 Dense over Loose Sand - H1<2*B'
Gamma Gamma Layer qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 1 13.32 0.0 38.0 105.0 110.0 47.60 c 61.352 1.000 0.000 n/a g 78.024 0.836 0.239 q 48.933 1.321 0.405
Gamma Gamma Layer *qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 2 5.55 0.0 29.0 110.0 115.0 52.60 c 27.860 1.000 0.000 n/a g 19.338 0.836 0.239 q 16.443 1.228 0.405
Bearing Final Resist qult H1 Ks Df Df2 B' L' Zw Hu Vu (ksf) (ksf) (ft) (ft) (ft) (ft) (ft) (ft) (kips/ft) (kips/ft)
3.03 6.74 4.00 3.98 7.33 11.33 11.31 27.54 -10.69 4.14 10.07
LRFD Abutment and Retaining Wall, Version 1.18.0.0 PAGE 15
BRIDGE 1111 ABUTMENT 1 ANALYSIS
FOOTING STABILITY (cont.)
INTERMEDIATE BEARING RESISTANCE VALUES (cont.)
Number Limit Soil Soil of State Case Stage Cat Cond Layers Description STR-V Max Fin 4 6 2 Dense over Loose Sand - H1<2*B'
Gamma Gamma Layer qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 1 20.27 0.0 38.0 105.0 110.0 47.60 c 61.352 1.000 0.000 n/a g 78.024 0.859 0.456 q 48.933 1.275 0.607
Gamma Gamma Layer *qult c phi Mass Sat Gamma Sub N s i RC(BC) (ksf) (ksf) (deg) (pcf) (pcf) (pcf) 2 8.37 0.0 29.0 110.0 115.0 52.60 c 27.860 1.000 0.000 n/a g 19.338 0.859 0.456 q 16.443 1.195 0.607
Bearing Final Resist qult H1 Ks Df Df2 B' L' Zw Hu Vu (ksf) (ksf) (ft) (ft) (ft) (ft) (ft) (ft) (kips/ft) (kips/ft)
4.37 9.72 4.00 3.98 7.33 11.33 9.69 27.54 -10.69 6.78 27.20
* Layer 2 qult calculation uses Gamma for Layer 1 and Gamma for Layer 2. Refer to User Manual Chapter 3 / Bearing Capacity Check / Category 4: Soil Condition 6 for details.
Number Limit Soil Soil of State Case Stage Cat Cond Layers Description STR-V Min Fin 4 6 2 Dense over Loose Sand - H1<2*B'
Gamma Gamma Layer qult c phi Mass Sat Gamma Sub N s i…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .