Statement_of_work_tree_clearing_20acres.pdf

PDF 223 KB Posted

Attached to
Tree Clearing 20 Acres Federal contract opportunity
Solicitation number
F5N3CR8142AW01
Issued by
Department of the Air Force Reserve Command

About this file

Airfield Tree Clearing, 20 Acres, dated 23 May 2018

View the file

Other files for this federal contract opportunity

Other files attached to Tree Clearing 20 Acres, newest first.
File Type Posted
Solicitation_F5N3CR8142AW01Questions_and_responses.docx.pdf PDF
treeclearing20acresmap.pdf PDF
WD_15-4095_Rev_8_dtd_04_17_2018.txt TXT text file
Order_of_conditions_WPA_Form_5_treeclearing20acres.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

YTPM 18-3003 AIRFIELD TREE REMOVAL

AIR FORCE RESERVE

439 CIVIL ENGINEERING

WESTOVER AIR RESERVE BASE

CHICOPEE, MASSACHUSETTS 01022

22 May 2018

STATEMENT OF WORK

YTPM 18-3003 Airfield Tree Removal

1. GENERAL _______________________________

A. This project consists of tree felling for 20 acres within the boundaries of Westover

Air Reserve Base (WARB) for the purpose of removing airfield obstructions as determined by UFC 3-260-01, Airfield Planning and Design.

B. Contract harvest period is 1 June 2018 to 31 October 2018. No work will be allowed during the period between 9 July 2018 and 17 July 2018 due to the WARB Air Show.

2. SCOPE OF WORK ______________________________

A. The project consists of providing all labor, equipment, supplies and supervision to perform all provisions of this SOW.

B. The contractor shall remove trees within the boundaries of WARB totaling 20 acres as indicated on Attachment 1. The stand is further described below showing existing conditions of tree density and underlying wetlands.

C. The Contractor will do everything within his/her power to prevent forest fires and to assume full liability for all damages occurring from forest fires resulting from this contract operation. ALL SLASH WILL BE NO MORE THAN TWO (2) FEET HIGH.

D. Jurisdictional wetlands are present within the limit of work. It is a legal requirement to comply with the City of Chicopee Order of Conditions (Attachment 2) issued on 21

March 2018 in accordance with the Massachusetts Wetlands Protection Act at 310 CMR

10.00.

E. All tree work shall be accomplished in accordance with the Arborist Certification

Study Guide ANSO A300 and ANSI Z133.1 (available at www.isa-arbor.com), and MA

Forestry Best Management Practices Manual (available at www.mass.gov/eea/docs/dcr/stewardship/forestry/ma-forestry-bmp-manual-rd.pdf ).

F. The Contractor agrees to exercise caution in all operations on the property of the

United States and to assume full liability for all damage to improvements on said property including cleanup of hazardous or solid materials/waste associated with spills.

G. Skid roads shall be covered with slash to the maximum extent possible to prevent soil damage. Landings will be cleared of all debris and restored to original condition.

http://www.isa-arbor.com/

H. Stumps shall be no higher than normal root swell or twelve (12) inches, whichever is less. Uprooted, broken, hung-up and spring trees will be cut to the ground immediately.

I. Unless otherwise authorized, the contractor will be escorted by WARB personnel to and from restricted areas.

J. The existing conditions, required treatment and site restoration for the tree stand is as follows:

Existing Conditions

Stand consists of approximately 20 acres east of Runway 23 and north of Pad 33.

The trees are a mix of deciduous and evergreens. Jurisdictional bordering vegetated wetlands and Cooley Brook are found within the wooded areas and thus requires special conditions (see attachment A).

Treatment: Within the wetland area, trees greater than 4” DBH are to be cut and removed. Outside of the wetland, the area is to be clearcut and the vegetation is to be removed. Care shall be made to avoid rutting in the wetlands complex.

Site Restoration: It is imperative that soil disturbance be avoided by all practical means. The existing slopes shall be maintained in stable condition. Any unavoidable soil disturbances, including rutting by contractor vehicles or equipment, must be stabilized prior to any further work being accomplished.

3. PHASES OF WORK ______________________________

A. This project will not be phased but coordination with the Base Operations must be maintained as to limit ongoing mission impacts.

4. SPECIAL CONDITIONS AND SPECIFICATIONS___________________

A. Chicopee Conservation Commission Amended Order of Conditions (Vegetation

Management Plan), dated 21 March 2018

5. ATTACHMENTS ___________________________

A. Map of Tree Stand Location

B. Chicopee Conservation Commission Amended Order of Conditions, March 2018

File details come from the government source that posted it.