110920 -- SOW WPAFB E911 Upgrade Rev 4.docx
DOCX document 51 KB Posted
- Attached to
- Upgrade of the WPAFB E911 System for 88 SFS
- Solicitation number
- F4F1AV1252AC02
About this file
SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DI-MGMT-80368A.pdf | ||
| DI-DRPR-80151A.pdf | ||
| DI-ILSS-81070.pdf | ||
| DI-MISC-81382.pdf | ||
| DI-NDTI-80566A.pdf | ||
| DI-QCIC-80512.pdf | ||
| DI-ADMN-81505.pdf | ||
| 911 SFS J A Signed RED.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW-88 CG E911 SYSTEM UPGRADE
20 Sep 2011 Rev. 4
STATEMENT OF WORK – SOW
for
UPGRADE OF
Enhanced 911 system
FOR 88TH SECURITY FORCES SQ
AT
WRIGHT-PATTERSON AFB, OH
Prepared By
88 CG / SCXPR
WPAFB AFB OH
Contents
| 1 | DESCRIPTION OF REQUIREMENTS: | 3 |
| 1.1 | DOD Voice Networks GSCR: | 3 |
| 1.2 | Department of Defense Instruction Information Assurance Accreditation: | 3 |
| 2 | SPECIFIC TASKS AND REQUIREMENTS: | 4 |
| 2.1 | General Requirements: | 4 |
| 2.2 | System Requirements: | 4 |
| 2.2.1 | Upgraded E911 System and Associated Infrastructure: | 4 |
| 2.2.2 | Fire Department, Building 30146: | 5 |
| 2.2.3 | Security Forces, Building 10295: | 5 |
| 2.3 | Contractor Furnished (CF) Materials: | 5 |
| 2.3.1 | Warranty: | 5 |
| 3 | DELIVERABLES: | 6 |
| 3.1 | Installation Plan: | 6 |
| 3.2 | Cutover Plan: | 6 |
| 3.3 | Acceptance Test Plan: | 6 |
| 3.4 | As-Built Drawings: | 6 |
| 3.5 | Spares: | 7 |
| 4 | TRAINING: | 7 |
| 5 | GENERAL TESTING REQUIREMENTS: | 7 |
| 5.1 | System Test: | 7 |
| 5.2 | Operations Test: | 8 |
| 6 | PERFORMANCE: | 8 |
| 6.1 | Period of Performance: | 8 |
| 6.2 | Place of Performance: | 8 |
| 6.3 | Hours of Work: | 8 |
| 7. | GOVERNMENT ASSISTANCE: | 8 |
| 8. | OPTIONAL MAINTENANCE: | 8 |
8 OPTIONAL MAINTENANCE……………………………………………………...9
1 DESCRIPTION OF REQUIREMENTS:
This Statement of Work (SOW) defines the requirements for the Contractor to Engineer, Furnish, Install, Test and Place (EFIT&P) into service an upgrade of WPAFB’s Enhanced 911 (E911) System for the 88th Security Forces Squadron (88 SFS) facility and to add Geospatial Information System (GIS) mapping capability to the current E911 system. The contractor shall use existing Government Furnished Equipment (GFE) to the maximum extent practical while still maintaining Joint Interoperability Test Center (JITC) certification. The SOW intent is for the contractor to ensure all interconnected GFE will continue to meet the requirements and applicable standards cited in this document and the latest version of Department of Defense (DOD) Voice Networks Generic Switching Center Requirements (GSCR). System downtime shall not occur without specific site Point of Contact (POC) approval. The contractor shall EFIT&P an upgrade to the existing E911 System consisting of three additional E911 dispatcher workstations and one new server to provide a GIS electronic mapping capability to the system. Note: mapping software and monitors shall also be provided for the four workstations that already exist on the system. Two of the additional workstations shall be installed in the 88 SFS operations facility, building 10295, and one additional workstation shall be installed in the Fire Department facility, building 30146. The new mapping server shall be installed in the main fire station, building 30146. The contractor shall provide all materials, software upgrades, software changes/re-configurations, cross-connect jumper runs/ re-terminations, re-configuration of equipment/users, installation, and relocation of equipment as specified in this SOW. It shall be the contractor’s responsibility to install all proposed equipment and associated cable infrastructure. The contractor shall coordinate work schedules, service interruptions, and installation/cutover of hardware and software with the 88th Communications Group (88 CG) to ensure minimal service disruption. The system, including equipment, software, features/functions, must comply with commercial practices and standards, and shall have appropriate JITC certification documentation. The contractor shall provide all necessary documentation to 88 CG base communications personnel to obtain Information Assurance (IA) certification for the installed equipment to allow connection to the existing base telephone switch. The E911 system shall comply with the following certifications and approvals:
1.1 DOD Voice Networks GSCR:
The replacement of equipment hardware and software shall comply with the latest version of the Defense Information Systems Agency (DISA) DoD Voice Networks GSCR. The contractor shall provide the appropriate JITC Approved Products List (APL) documentation as a part of the proposal.
1.2 Department of Defense Instruction Information Assurance Accreditation:
The modernized switch, software, and ancillary equipment shall have received Information Assurance (IA) accreditation in accordance with DODI 8100.3, DOD Voice Networks (U). The contractor shall provide the appropriate IA APL documentation as a part of the proposal. In addition, the contractor shall ensure that the system meets the criteria for DoD Information Assurance Certification and Accreditation Process (DIACAP).
2 SPECIFIC TASKS AND REQUIREMENTS:
General Requirements:
In addition to GFE, the contractor shall provide all equipment (hardware and software), tools, materials, safety materials, supplies, transportation, supervision, management, and other incidentals necessary to EFIT&P the requirements as stated in this SOW. All equipment, supplies, and materials provided shall be new, and include the following:
1. Provide engineering designs
2. Provide project planning
3. Provide delivery order proposal
4. Include warranty and maintenance support
5. Include critical spare parts list
6. Training must be provided for qualified individuals
7. The contractor shall provide a list of all components to be installed per this project that are identified in the contract, as well as a list of the components to be removed.
System Requirements:
For the requirements listed below the contractor shall Engineer and Furnish all materials, make all software upgrades, make all system software changes, and perform all work to include making all cross-connection assignments and changes required to complete requirements as specified in this SOW. The installation shall meet the National Fire Protection Association (NFPA) 1221 Standard for the Installation, Maintenance, and Use of Emergency Services, 2010.
2.1.1 Upgraded E911 System and Associated Infrastructure:
The upgrade of the existing E911 system shall include mapping software and server such that ALI and cell phone locations are displayed on a GIS map of Wright-Patterson AFB and the surrounding area. It will include GIS electronic mapping for building, street address, and cell phone x,y,z location display on a 19-inch monitor. The system will have the ability to broadcast map updates to all workstations without having to visit each workstation individually. The new mapping software shall be provided for the four existing workstations and also the three new workstations described below.
The upgrade shall also consist of providing three additional workstations for the existing E911 system which interfaces with the base telephone switch (Nortel (Avaya) CS-2100). The three new workstations shall have external audio speakers and external 24-button PS2/USB keypads. Two workstations shall be installed in the 88 SFS operations facility, building 10295, and each have a touch screen monitor for the E911 functions, MIC-enabled handset, and a 19-inch monitor for the map display. One workstation shall be installed in the Fire Department facility, building 30146, and have a touch screen monitor, MIC-enabled handset for 911 functions, and a 19-inch monitor for map display. Both of these facilities are connected to the Area A Dial Central Office (DCO), building 10262, via an existing copper and fiber infrastructure. Note: 19-inch monitors for map display shall also be provided for the existing four workstations.
2.1.2 Fire Department, Building 30146:
Two existing E911 phones and two Motorola Gold Elite land mobile radio consoles (LMR) are located in the Fire Department dispatch facility. One new workstation will be installed in this same location to add to the two existing E911 telephones. The facility has a dedicated communications room with generator system which the new E911 System shall be connected. The new E911 server equipment shall also be installed in this communications room. GFE copper and fiber connectivity is available from this location to the DCO, building 10262. The contractor shall ensure that no active services are disrupted during the installation and shall be liable for any costs incurred by the Government to restore disrupted service. Any required disruption shall be coordinated with the Wright-Patterson AFB Fire Department. The Fire Department facility does have a facility Uninterruptible Power System (UPS). All E911 equipment must be connected to the UPS/generator for power.
2.1.3 Security Forces, Building 10295:
Two existing E911 phones and Motorola Gold Elite consoles are located in the 88 SFS dispatch facility, which is the alternate for the Fire Department. Two new workstations will be installed in the Security Forces facility to add to the two existing E911 telephones. The Security Forces facility does have a facility UPS. All E911 equipment shall be connected to the UPS/generator for power. GFE copper and fiber connectivity is available from this location to the DCO. The contractor shall ensure that no active services are disrupted during this equipment installation and shall be liable for any costs incurred by the Government to restore disrupted service.
Contractor Furnished (CF) Materials:
The contractor shall supply Commercial-Off-the-Shelf (COTS) end-item system components required for contract performance wherever possible. The contractor shall identify all materials or equipment required for the specific projects in the SOW. The contractor shall list the manufacturer and part number of the proposed material in the SOW. Unless otherwise specified, the contractor shall provide copies of existing COTS technical and equipment manuals, warranty documentation and procedures for contractor-furnished end-item system equipment maintenance. The contractor shall list the total sustainment lifecycle costs including but not limited to: Hardware, Hardware upgrades, Software, Software patches and upgrades, License and License upgrades. The contractor shall transfer all warranties to the government.
2.1.4 Warranty:
The contractor shall provide a minimum full/unlimited one-year warranty for all contractor provided hardware/software, materials, and workmanship. The contractor shall provide extended five-year warranty on all servers and workstation hardware. Warranty will not begin until final Government approval. The warranty shall include emergency off-site technical assistance as required via a modem connection from the contractor’s/manufacturer’s facility. The contractor shall track and resolve the problem(s) in accordance with standard commercial practices.
3 DELIVERABLES:
All deliverables are subject to Government acceptance and approval. They shall meet professional standards and the requirements set forth in this SOW. All deliverables shall be produced using recommended software tools/versions as accepted by the Government. The contractor shall submit the following deliverables:
| CDRL |
| Data Item Description |
| Data Item Title |
| A001 |
| As Builts |
| DI-DRPR-80151A/T |
| A002 |
| Work Schedule |
| DI-MISC-81382/T |
| A003 |
| Status Report |
| DI-MGMT-80368A |
| A004 |
| Meeting Minutes |
| DI-ADMIN-81505/T |
| A005 |
| Test Report |
| DI-QCIC-80512 |
| A006 |
| Test Plan |
| DI-NDTI-80566A/T |
| A007 |
| Training Plan |
| DI-ILSS-81070/T |
Installation Plan:
The contractor shall provide an installation plan as to how the requirements specified in this SOW will be met IAW CDRL A002. The contractor shall not commence installation work until the installation plan is agreed upon by the Contracting Officer. The government shall have 10 working days to review and concur or provide comments and concerns to the installation plan.
Cutover Plan:
The contractor shall provide a cutover plan IAW CDRL A006 to delineate how the transition will be implemented and placed into service for the new E911 System with connection to the existing base telephone switch. The cutover plan shall be provided to the government within 60 days after contract award. The government shall have 10 working days to review and concur or provide comments and concerns to the cutover plan. The contractor shall provide revised cutover plan within 15 working days from receiving government comments and concerns.
Acceptance Test Plan:
The contractor shall provide an acceptance test plan of the installation covering all aspects of the installation and demonstrate the acceptability of the equipment on meeting the government requirement. The contractor shall perform all tests and document results of tests with government witnesses overseeing the Acceptance testing IAW CDRLs A005 and A006.
As-Built Drawings:
The contractor shall provide as-built drawings for the installed equipment to include where and how they connect/interface with each other and the base telephone switch IAW CDRL A001.
Spares:
The contractor shall provide recommended spares for system components.
4 TRAINING:
The contractor shall provide mapping capability training for the following number of personnel: 25 each Call Taker, 6 each System Administration and 6 each System Maintenance. The Call Taker training should accommodate the 12-hour shifts which the call takers work. A morning and separate evening training may be required to accommodate this training requirement. The contractor will provide a training plan IAW CDRL A007.
5 GENERAL TESTING REQUIREMENTS:
The contractor shall perform testing and inspections of all systems solutions to ensure the technical adequacy and accuracy of all work, including reports and other documents required in support of that work. The contractor shall conduct on-site testing in accordance with the Original Equipment Manufacturer’s installation manuals, practices and the appropriate vendor’s test procedures. The contractor will provide a test plan IAW CDRL A006. The contractor shall participate with the government in testing the complete E911 System, which may include premise equipment, distribution systems or any additional telecommunications/network equipment or operating support systems identified in the SOW. When any system, subsystem, component or requirement test fails to meet the requirements of the test, Government acceptance and payment will be withheld until such time as the cause of the failure is corrected to the government satisfaction. After appropriate corrective action has been taken, all tests including those previously completed related to the failed test and the corrective action shall be repeated and successfully completed prior to government acceptance. Pre-cutover audits will consist of verification of all testing completed by the contractor such that the system is deemed ready for functional cutover. Post-cutover audits will verify that all post-cutover acceptance testing has been performed satisfactorily in accordance with the standard practices and identify those tests, if any which have not been successfully completed and shall be re-tested prior to acceptance. Testing shall be performed in two steps: System test (all equipment assembled and operating correctly) and Operational testing (real world). The contractor shall provide a logical test process that minimizes interruptions and avoids sustained downtime and presents a contingency procedure to be implemented in the event of systems failure during testing.
The contractor shall furnish all test equipment and personnel required to conduct all required testing. The contractor shall document all test results in a “Test Report(s)” and submit to the government IAW CDRL A005. During the testing phase, the government reserves the right to perform any of the contractor performed inspections and tests to assure solutions conform to prescribed requirements. The contractor shall provide on-site support during the acceptance testing.
System Test:
The system test will consist of testing each workstation in all buildings listed above separately to ensure that all equipment operates correctly as assembled and in accordance with the specifications. Each workstation must meet all of the specifications of this project as listed above before final operations testing.
Operations Test:
The operations test will consist of testing the entire E911 System as a whole. This will be the real world test to ensure functionality of all the installation and equipment related to this project.
6 PERFORMANCE:
Period of Performance:
The period of performance for this SOW shall be listed in the contract.
Place of Performance:
The place of performance is Wright-Patterson AFB, OH.
Hours of Work:
The contractor shall work during normal operating hours (0800 – 1700), Monday through Friday, excluding federal holidays. If performance of the work outside normal duty hours will be required to meet the scheduled contract dates, include desired working hours in the Proposal. Occasional extra or unusual work hours shall be provided by the contractor at no extra cost.
7. GOVERNMENT ASSISTANCE:
The contractor shall specifically identify in their proposal any government resources required during the performance of this SOW. The contractor shall obtain and comply with any other applicable manuals that would be required to meet industry standards.
8. OPTIONAL MAINTENANCE:
The contractor shall provide cost for annual software (and associated support services) maintenance options, in one year increments, for four years after expiration of the warranty.