Stament of Work.pdf

PDF 208 KB Posted

Attached to
Lifting Equipment Load Testing
Solicitation number
F4819CS260001
Issued by

About this file

This is a Statement of Work for Tyndall Air Force Base's Crashed Disabled Damaged Aircraft Recovery program. The contractor is required to inspect and load test lifting equipment in accordance with ASME standards and provide certified load test documentation for each item. The scope encompasses 12 pieces of equipment including Twin Path slings (various lengths and capacities), an F-16 sling, struts, end links, and shackles. All equipment must be retrieved by the contractor from Building 267 at 1201 Florida Avenue, Tyndall AFB, FL 32403, with a pickup deadline of 22 May 2026.

Acceptance criteria require that all items be inspected and photographed before and after load testing, with verification of load test certificates and OSHA load certified inspector documentation upon completion. Contractor access to the Air Force installation mandates criminal background checks, DBIDS pass registration, DoD Common Access Card processing, and AF Form 75 Visitor/Vehicle Pass compliance in accordance with established security protocols. Contract performance operates during normal duty hours of Monday–Friday, 0730–1630, excluding 11 federal holidays and an estimated eight down days per year. The contractor is prohibited from charging costs for down days unless specifically approved by the Contracting Officer. Failure to promptly return all base credentials upon contract completion may result in withholding of payment.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

This Statement of Work (SOW) outlines the requirements for Tyndall’s Crashed Disabled Damaged Aircraft Recovery program to have their lifting equipment inspected, load tested, and copies of certification documentation. The purpose of this SOW is to clearly define the scope of work, deliverables, and performance expectations. Also, the SOW is intended to prevent misunderstandings and disputes regarding the work to be performed.

a. Scope of work: Perform inspections and load testing for each piece of equipment in accordance with the attached ASME's and provide certified load test documentation for each item.

b. Period of performance: Items must be picked up from Tyndall AFB by 22 May 2026

c. Physical location: Contractor will retrieve equipment from 1201 Florida Ave, Bldg. 267, Tyndall AFB, FL, 32403

d. Supplies and equipment:

1. 6’ endless Twin Path sling TPXC1000

2. 6’ endless Twin Path sling TPXC1000

3. 15 endless twin path sling TPXC1500

4. 15 endless twin path sling TPXC1500

5. F-16 Sling GWT30

6. SPBR1-STRUT1

7. SPBR1-STRUT2

8. SPBR1-STRUT3

9. SPBR1-END LINK1

10. SPBR1-END LINK2

11. 8 ½ ton shackle

12. 8 ½ ton shackle

e. Acceptance Criteria. Tyndall AFB items will be inspected and photographed prior and inspected post contract load testing. Items will also require verification of load test certificate. OSHA load certified inspector/documents will be required upon completion.

Contractor Access to Air Force Installations.

All Contractor employees will be subject to a criminal history background check IAW Air Force Manual (AFMAN) 31-113, Installation Perimeter Access Control, as stipulated in the Installation Commander’s memorandum to the 325th Security Forces Office dated 23 Apr 2015 (the AFMAN and memorandum are both limited access documents but more details on the equirements/process in terms of background checks can be provided by the Unit Security Manager). Vehicle registration, proof of insurance, and a valid driver's license must be presented for vehicles. Installation Commanders may deny access and credentials based on information obtained during identity vetting that indicates the individual may present a threat to the good order, discipline, and morale of the installation.

Base Access: The Contractor shall ensure the following pass and identification items required for contract performance are obtained for employees and non-Government owned vehicles:

a. DBIDS pass. Obtained through submitting personal identifiable information to Security Forces for criminal background check.

b. DoD Common Access Card (CAC), AFI 36-3026(I). Process through USM, Trusted Agent Sponsorship System (TASS) point of contact for a CAC card.

c. AF Form 75, Visitor/Vehicle Pass (AFI 31-204): The Contractor shall adhere to local security policy when applying for short/long term visitors’ passes. Any

Contractor requesting a pass for more than 3 days will complete a Local Files Check with 325 SFS/Pass & ID. Vehicle passes (personal vehicles) are no longer required.

Visitors/Contractors with driver’s licenses from ME, MN, MO, MT, and WA (exceptions are EDL-Enhanced driver’s licenses from MN & WA) will not be able to obtain base access without another form of identification as an identity proofing document. The list of authorized IDs can be found in the REAL ID Act of 2005. Please visit the Department of Homeland Security’s (DHS) website to get the latest information, https://www.dhs.gov/current-status-states-territories.

During performance of the contract, the Contractor shall be responsible for obtaining required identification for newly assigned personnel.

The Contractor shall be responsible for prompt return of credentials and vehicle passes for:

1. Any employee who no longer requires access to the work site;

2. Upon request by a CO; and

3. Upon completion or termination of the contract. The prime Contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office. Failure to comply with these requirements may result in withholding of payment.

HOURS OF OPERATION

Normal duty hours are Monday–Friday, 0730–1630, excluding Federal Holidays.

Federal Holidays:

New Year’s Day Martin Luther King Day, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day.

If a holiday falls on Saturday, the preceding Friday is observed; if on Sunday, the following Monday is observed.

If a holiday falls on a scheduled service day, the Contractor shall reschedule for the first duty day after the holiday.

Down Days: Days designated by MAJCOM or 325 FW/CC as non-working.

Estimated at eight (8) per year. Contractor shall not charge costs for down days unless approved by the CO.

File details come from the government source that posted it. Updated .